CN203125121U - Automatic production line for sprinklers - Google Patents
Automatic production line for sprinklers Download PDFInfo
- Publication number
- CN203125121U CN203125121U CN 201320088832 CN201320088832U CN203125121U CN 203125121 U CN203125121 U CN 203125121U CN 201320088832 CN201320088832 CN 201320088832 CN 201320088832 U CN201320088832 U CN 201320088832U CN 203125121 U CN203125121 U CN 203125121U
- Authority
- CN
- China
- Prior art keywords
- feeding mechanism
- assembling
- shape circle
- assembly
- feeding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Devices For Dispensing Beverages (AREA)
Abstract
The utility model discloses an automatic production line for sprinklers. The automatic production line comprises a base feeding mechanism and the like. The base feeding mechanism is connected with a base assembling mechanism. A first main conveying mechanism is located above the base assembling mechanism, a first O-shaped ring feeding mechanism is located on the side of the base feeding mechanism, a first O-shaped ring assembling mechanism is located above the first O-shaped ring feeding mechanism, and a water distribution seat feeding mechanism is located on the side of the first O-shaped ring feeding mechanism. A second O-shaped ring feeding mechanism, a second O-shaped ring assembling mechanism and a water distribution seat assembly assembling mechanism are all located above the water distribution feeding mechanism, a connection piece feeding mechanism is located on the side of the second O-shaped ring feeding mechanism, a connection piece assembling mechanism is connected with a connection piece feeding mechanism, a black ball assembly feeding mechanism is located on the side of the connection piece feeding mechanism, and a black ball assembly assembling mechanism is connected with the black ball assembly feeding mechanism. By means of the automatic production line, feeding and assembly of parts can be automatically finished. The automatic production line reduces labor intensity and is high in efficiency and low in cost.
Description
Technical field
The utility model relates to a kind of production line, particularly relates to a kind of gondola water faucet automatic production line.
Background technology
Existing gondola water faucet adopts the artificial pipeline system operation of tradition, and all flow processs cause personnel labor intensity big all by manually assembling easily, and continuous Production Time is short, the cost height.
The utility model content
Technical problem to be solved in the utility model provides a kind of gondola water faucet automatic production line, and it finishes charging and the assembling of parts automatically, reduces labour intensity, the efficient height, and cost is low.
The utility model solves above-mentioned technical problem by following technical proposals: a kind of gondola water faucet automatic production line, it is characterized in that, it comprises the base feeding mechanism, the base assembling mechanism, the first main transmission mechanism, the one O shape circle feeding mechanism, the one O shape circle assembling mechanism, the separating stand feeding mechanism, the 2nd O shape circle feeding mechanism, the 2nd O shape circle assembling mechanism, separating stand assembly assembling mechanism, the brace feeding mechanism, the brace assembling mechanism, black soya bean assembly feeding mechanism, black soya bean assembly assembling mechanism, black soya bean assembly pressing mechanism, the 3rd O shape circle feeding mechanism, the 3rd O shape circle assembling mechanism, the base assembly unloading device, the base assembly feeding mechanism, the base assembly assembling mechanism, the second main transmission mechanism, screw feed mechanism, the 4th O shape circle feeding mechanism, the 4th O shape circle assembling mechanism, the screw arbor assembly assembling mechanism, cover water sealing slice feeding mechanism, the 5th O shape circle feeding mechanism, the 5th O shape circle assembling mechanism, cover water sealing slice assembly assembling mechanism, the water outlet panel feeding mechanism, the 6th O shape circle feeding mechanism, the 6th O shape circle assembling mechanism, water outlet panel assembly assembling mechanism, vanes fixed sheet feeding mechanism, vanes fixed sheet assembling mechanism, the blade feeding mechanism, the vane group mounting mechanism, the cover feeding mechanism, the 7th O shape circle feeding mechanism, the 7th O shape circle assembling mechanism, cover assembly assembling mechanism, cover assembly hold-down mechanism, the screw feeding mechanism, the set screws mounting mechanism, the defective products output mechanism, water outlet panel assembly feeding mechanism, the bulb feeding mechanism, bulb stopper feeding mechanism, bulb assembly assembling mechanism, the first dial rotation mechanism, the shell feeding mechanism, the snap ring feeding mechanism, the snap ring assembling mechanism, the snap ring pressing mechanism, the casing assembly assembling mechanism, the second dial rotation mechanism, the casing assembly detent mechanism, the bulb pressing mechanism, the platen feeding mechanism, the platen assembling mechanism, cover is filled out the water sealing slice detent mechanism, dial feed mechanism, the rotating disk assembling mechanism, discharging mechanism, the base feeding mechanism is connected with the base assembling mechanism, the first main transmission mechanism is positioned at the top of base assembling mechanism, the one O shape circle feeding mechanism is positioned at the side of base feeding mechanism, the one O shape circle assembling mechanism is positioned at the top of O shape circle feeding mechanism, the separating stand feeding mechanism is positioned at the side of O shape circle feeding mechanism, the 2nd O shape circle feeding mechanism, the 2nd O shape circle assembling mechanism, separating stand assembly assembling mechanism all is positioned at the top of separating stand feeding mechanism, the brace feeding mechanism is positioned at the side of the 2nd O shape circle feeding mechanism, the brace assembling mechanism is connected with the brace feeding mechanism, black soya bean assembly feeding mechanism is positioned at the side of brace feeding mechanism, black soya bean assembly assembling mechanism is connected with black soya bean assembly feeding mechanism, black soya bean assembly assembling mechanism is between brace assembling mechanism and black soya bean assembly pressing mechanism, the 3rd O shape circle feeding mechanism is positioned at the side of black soya bean assembly feeding mechanism, the 3rd O shape circle assembling mechanism is connected with the 3rd O shape circle feeding mechanism, the base assembly unloading device is positioned at the side of the 3rd O shape circle assembling mechanism, the base assembly feeding mechanism is positioned at the side of base assembly unloading device, the base assembly assembling mechanism is between the second main transmission mechanism and base assembly feeding mechanism, screw feed mechanism is positioned at the below of base assembly assembling mechanism, the 4th O shape circle feeding mechanism is positioned at the side of screw feed mechanism, the 4th O shape circle assembling mechanism is connected with the 4th O shape circle feeding mechanism, the screw arbor assembly assembling mechanism is positioned at the top of the 4th O shape circle assembling mechanism, cover water sealing slice feeding mechanism is connected with cover water sealing slice assembly assembling mechanism, cover water sealing slice assembly assembling mechanism is connected with the 5th O shape circle assembling mechanism, the 5th O shape circle feeding mechanism is positioned at the top of cover water sealing slice feeding mechanism, the water outlet panel feeding mechanism is positioned at the side of the 5th O shape circle feeding mechanism, the 6th O shape circle feeding mechanism is positioned at the top of water outlet panel feeding mechanism, the 6th O shape circle assembling mechanism is connected with the 6th O shape circle feeding mechanism, water outlet panel assembly assembling mechanism is positioned at the below of the 6th O shape circle assembling mechanism, vanes fixed sheet feeding mechanism is positioned at the side of water outlet panel feeding mechanism, vanes fixed sheet assembling mechanism is connected with vanes fixed sheet feeding mechanism, the blade feeding mechanism is positioned at the side of vanes fixed sheet feeding mechanism, the vane group mounting mechanism is connected with the blade feeding mechanism, the cover feeding mechanism is positioned at the below of the 7th O shape circle feeding mechanism, the 7th O shape circle assembling mechanism is connected with the 7th O shape circle feeding mechanism, cover assembly assembling mechanism is positioned at the below of the 7th O shape circle assembling mechanism, cover assembly hold-down mechanism is positioned at the top of the 7th O shape circle feeding mechanism, the screw feeding mechanism is positioned at the side with the 7th O shape circle feeding mechanism, the set screws mounting mechanism is connected with the screw feeding mechanism, the defective products output mechanism is positioned at the side of set screws mounting mechanism, water outlet panel assembly feeding mechanism is positioned at the side of defective products output mechanism, the bulb feeding mechanism is connected with bulb assembly assembling mechanism, the first dial rotation mechanism is positioned at the top of bulb assembly assembling mechanism, the shell feeding mechanism, the casing assembly assembling mechanism all is installed in the first dial rotation mechanism, the snap ring feeding mechanism is connected with the snap ring assembling mechanism, the snap ring pressing mechanism is positioned at the below of snap ring assembling mechanism, the casing assembly detent mechanism, the bulb pressing mechanism, the platen assembling mechanism, cover is filled out the water sealing slice detent mechanism, the rotating disk assembling mechanism all is installed in the second dial rotation mechanism, bulb stopper feeding mechanism is positioned at the below of discharging mechanism, the platen feeding mechanism is positioned at the below of the second dial rotation mechanism, and dial feed mechanism is positioned at the below of rotating disk assembling mechanism.
Positive progressive effect of the present utility model is: the utility model gondola water faucet automatic production line is finished charging and the assembling of parts automatically, reduces labour intensity, the efficient height, and cost is low.
Description of drawings
Fig. 1 is the structural representation of the utility model gondola water faucet automatic production line.
The specific embodiment
Provide the utility model preferred embodiment below in conjunction with accompanying drawing, to describe the technical solution of the utility model in detail.
As shown in Figure 1, the utility model gondola water faucet automatic production line comprises base feeding mechanism 1, base assembling mechanism 2, the first main transmission mechanism 3, the one O shape circle feeding mechanism 4, the one O shape circle assembling mechanism 5, separating stand feeding mechanism 6, the 2nd O shape circle feeding mechanism 7, the 2nd O shape circle assembling mechanism 8, separating stand assembly assembling mechanism 9, brace feeding mechanism 10, brace assembling mechanism 11, black soya bean assembly feeding mechanism 12, black soya bean assembly assembling mechanism 13, black soya bean assembly pressing mechanism 14, the 3rd O shape circle feeding mechanism 15, the 3rd O shape circle assembling mechanism 16, base assembly unloading device 17, base assembly feeding mechanism 18, base assembly assembling mechanism 19, the second main transmission mechanism 20, screw feed mechanism 21, the 4th O shape circle feeding mechanism 22, the 4th O shape circle assembling mechanism 23, screw arbor assembly assembling mechanism 24, cover water sealing slice feeding mechanism 25, the 5th O shape circle feeding mechanism 26, the 5th O shape circle assembling mechanism 27, cover water sealing slice assembly assembling mechanism 28, water outlet panel feeding mechanism 29, the 6th O shape circle feeding mechanism 30, the 6th O shape circle assembling mechanism 31, water outlet panel assembly assembling mechanism 32, vanes fixed sheet feeding mechanism 33, vanes fixed sheet assembling mechanism 34, blade feeding mechanism 35, vane group mounting mechanism 36, cover feeding mechanism 37, the 7th O shape circle feeding mechanism 38, the 7th O shape circle assembling mechanism 39, cover assembly assembling mechanism 40, cover assembly hold-down mechanism 41, screw feeding mechanism 42, set screws mounting mechanism 43, defective products output mechanism 44, water outlet panel assembly feeding mechanism 45, bulb feeding mechanism 46, bulb stopper feeding mechanism 47, bulb assembly assembling mechanism 48, the first dial rotation mechanism 49, shell feeding mechanism 50, snap ring feeding mechanism 51, snap ring assembling mechanism 52, snap ring pressing mechanism 53, casing assembly assembling mechanism 54, the second dial rotation mechanism 55, casing assembly detent mechanism 56, bulb pressing mechanism 57, platen feeding mechanism 58, platen assembling mechanism 59, cover is filled out water sealing slice detent mechanism 60, dial feed mechanism 61, rotating disk assembling mechanism 62, discharging mechanism 63, base feeding mechanism 1 is connected with base assembling mechanism 2, the first main transmission mechanism 3 is positioned at the top of base assembling mechanism 2, the one O shape circle feeding mechanism 4 is positioned at the side of base feeding mechanism 1, the one O shape circle assembling mechanism 5 is positioned at the top of O shape circle feeding mechanism 4, separating stand feeding mechanism 6 is positioned at the side of O shape circle feeding mechanism 4, the 2nd O shape circle feeding mechanism 7, the 2nd O shape circle assembling mechanism 8, separating stand assembly assembling mechanism 9 all is positioned at the top of separating stand feeding mechanism 6, brace feeding mechanism 10 is positioned at the side of the 2nd O shape circle feeding mechanism 7, brace assembling mechanism 11 is connected with brace feeding mechanism 10, black soya bean assembly feeding mechanism 12 is positioned at the side of brace feeding mechanism 10, black soya bean assembly assembling mechanism 13 is connected with black soya bean assembly feeding mechanism 12, black soya bean assembly assembling mechanism 13 is between brace assembling mechanism 11 and black soya bean assembly pressing mechanism 14, the 3rd O shape circle feeding mechanism 15 is positioned at the side of black soya bean assembly feeding mechanism 12, the 3rd O shape circle assembling mechanism 16 is connected with the 3rd O shape circle feeding mechanism 15, base assembly unloading device 17 is positioned at the side of the 3rd O shape circle assembling mechanism 16, base assembly feeding mechanism 18 is positioned at the side of base assembly unloading device 17, base assembly assembling mechanism 19 is between the second main transmission mechanism 20 and base assembly feeding mechanism 18, screw feed mechanism 21 is positioned at the below of base assembly assembling mechanism 19, the 4th O shape circle feeding mechanism 22 is positioned at the side of screw feed mechanism 21, the 4th O shape circle assembling mechanism 23 is connected with the 4th O shape circle feeding mechanism 22, screw arbor assembly assembling mechanism 24 is positioned at the top of the 4th O shape circle assembling mechanism 23, cover water sealing slice feeding mechanism 25 is connected with cover water sealing slice assembly assembling mechanism 28, cover water sealing slice assembly assembling mechanism 28 is connected with the 5th O shape circle assembling mechanism 27, the 5th O shape circle feeding mechanism 26 is positioned at the top of cover water sealing slice feeding mechanism 25, water outlet panel feeding mechanism 29 is positioned at the side of the 5th O shape circle feeding mechanism 26, the 6th O shape circle feeding mechanism 30 is positioned at the top of water outlet panel feeding mechanism 29, the 6th O shape circle assembling mechanism 31 is connected with the 6th O shape circle feeding mechanism 30, water outlet panel assembly assembling mechanism 32 is positioned at the below of the 6th O shape circle assembling mechanism 31, vanes fixed sheet feeding mechanism 33 is positioned at the side of water outlet panel feeding mechanism 29, vanes fixed sheet assembling mechanism 34 is connected with vanes fixed sheet feeding mechanism 33, blade feeding mechanism 35 is positioned at the side of vanes fixed sheet feeding mechanism 33, vane group mounting mechanism 36 is connected with blade feeding mechanism 35, cover feeding mechanism 37 is positioned at the below of the 7th O shape circle feeding mechanism 38, the 7th O shape circle assembling mechanism 39 is connected with the 7th O shape circle feeding mechanism 38, cover assembly assembling mechanism 40 is positioned at the below of the 7th O shape circle assembling mechanism 39, cover assembly hold-down mechanism 41 is positioned at the top of the 7th O shape circle feeding mechanism 38, screw feeding mechanism 42 is positioned at the side with the 7th O shape circle feeding mechanism 38, set screws mounting mechanism 43 is connected with screw feeding mechanism 42, defective products output mechanism 44 is positioned at the side of set screws mounting mechanism 43, water outlet panel assembly feeding mechanism 45 is positioned at the side of defective products output mechanism 44, bulb feeding mechanism 46 is connected with bulb assembly assembling mechanism 48, the first dial rotation mechanism 49 is positioned at the top of bulb assembly assembling mechanism 48, shell feeding mechanism 50, casing assembly assembling mechanism 54 all is installed in the first dial rotation mechanism 49, snap ring feeding mechanism 51 is connected with snap ring assembling mechanism 52, snap ring pressing mechanism 53 is positioned at the below of snap ring assembling mechanism 52, casing assembly detent mechanism 56, bulb pressing mechanism 57, platen assembling mechanism 59, cover is filled out water sealing slice detent mechanism 60, rotating disk assembling mechanism 62 all is installed in the second dial rotation mechanism 55, bulb stopper feeding mechanism 47 is positioned at the below of discharging mechanism 63, platen feeding mechanism 58 is positioned at the below of the second dial rotation mechanism 55, and dial feed mechanism 61 is positioned at the below of rotating disk assembling mechanism 62.Base feeding mechanism 1 to discharging mechanism 63 all is the product that can buy on the market.
The base feeding mechanism is used for being input into base, and the base assembling mechanism is used for the assembling of base.The first main transmission mechanism is used for transportation, and O shape circle feeding mechanism is used for being input into O shape circle, and O shape circle assembling mechanism is used for the assembling of O shape circle.The separating stand feeding mechanism is used for being input into separating stand, the 2nd O shape circle feeding mechanism is used for being input into the 2nd O shape circle, the 2nd O shape circle assembling mechanism is used for the assembling of the 2nd O shape circle, separating stand assembly assembling mechanism is used for the assembling of separating stand assembly, the brace feeding mechanism is used for being input into brace, the brace assembling mechanism is used for the assembling of brace, black soya bean assembly feeding mechanism is used for being input into the black soya bean assembly, black soya bean assembly assembling mechanism is used for the assembling of black soya bean assembly, black soya bean assembly pressing mechanism is used for being pressed into the black soya bean assembly, the 3rd O shape circle feeding mechanism is used for being input into the 3rd O shape circle, the 3rd O shape circle assembling mechanism is used for the assembling of the 3rd O shape circle, the base assembly unloading device is used for taking out base assembly, the base assembly feeding mechanism is used for being input into base assembly, the base assembly assembling mechanism is used for the assembling of base assembly, the second main transmission mechanism transmits, screw feed mechanism is used for being input into screw rod, the 4th O shape circle feeding mechanism is used for being input into the 4th O shape circle, the 4th O shape circle assembling mechanism is used for the assembling of the 4th O shape circle, the screw arbor assembly assembling mechanism is used for the assembling of screw arbor assembly, cover water sealing slice feeding mechanism is used for being input into the cover water sealing slice, the 5th O shape circle feeding mechanism is used for being input into the 5th O shape circle, and the 5th O shape circle assembling mechanism is used for the assembling of the 5th O shape circle.Cover water sealing slice assembly assembling mechanism is used for the assembling of cover water sealing slice assembly, the water outlet panel feeding mechanism is used for being input into water outlet panel, the 6th O shape circle feeding mechanism is used for being input into the 6th O shape circle, the 6th O shape circle assembling mechanism is used for the assembling of the 6th O shape circle, water outlet panel assembly assembling mechanism is used for the assembling of water outlet panel, vanes fixed sheet feeding mechanism is used for being input into the vanes fixed sheet, vanes fixed sheet assembling mechanism is used for the assembling of vanes fixed sheet, the blade feeding mechanism is used for being input into blade, the vane group mounting mechanism is used for the assembling of blade, the cover feeding mechanism is used for being input into cover, the 7th O shape circle feeding mechanism is used for being input into the 7th O shape circle, the 7th O shape circle assembling mechanism is used for the assembling of the 7th O shape circle, cover assembly assembling mechanism is used for the assembling of cover assembly, cover assembly hold-down mechanism is used for the seal face cap assemblies, the screw feeding mechanism is used for being input into screw, the set screws mounting mechanism is used for the assembling of screw, the defective products output mechanism is used for discharging defective products, water outlet panel assembly feeding mechanism is used for being input into the water outlet panel assembly, the bulb feeding mechanism is used for being input into bulb, bulb stopper feeding mechanism is used for being input into the bulb stopper, bulb assembly assembling mechanism is used for the assembling of bulb assembly, the first dial rotation mechanism is used for the rotation of first rotating disk, the shell feeding mechanism is used for being input into shell, the snap ring feeding mechanism is used for being input into snap ring, the snap ring assembling mechanism is used for the assembling of snap ring, the snap ring pressing mechanism is used for being pressed into snap ring, the casing assembly assembling mechanism is used for the assembling of casing assembly, the second dial rotation mechanism is used for the rotation of second rotating disk, the casing assembly detent mechanism is used for casing assembly is positioned, the bulb pressing mechanism is used for being pressed into bulb, the platen feeding mechanism is used for being input into platen, the platen assembling mechanism is used for the assembling of platen, cover is filled out the water sealing slice detent mechanism and is positioned for cover is filled out water sealing slice, dial feed mechanism is used for being input into rotating disk, the rotating disk assembling mechanism is used for the assembling of rotating disk, and discharging mechanism is used for output products.The utility model gondola water faucet automatic production line is finished charging and the assembling of parts automatically, reduces labour intensity, the efficient height, and cost is low.
Those skilled in the art can carry out various remodeling and change to the utility model.Therefore, the utility model has covered various remodeling and the change in the scope that falls into appending claims and equivalent thereof.
Claims (1)
1. gondola water faucet automatic production line, it is characterized in that, it comprises the base feeding mechanism, the base assembling mechanism, the first main transmission mechanism, the one O shape circle feeding mechanism, the one O shape circle assembling mechanism, the separating stand feeding mechanism, the 2nd O shape circle feeding mechanism, the 2nd O shape circle assembling mechanism, separating stand assembly assembling mechanism, the brace feeding mechanism, the brace assembling mechanism, black soya bean assembly feeding mechanism, black soya bean assembly assembling mechanism, black soya bean assembly pressing mechanism, the 3rd O shape circle feeding mechanism, the 3rd O shape circle assembling mechanism, the base assembly unloading device, the base assembly feeding mechanism, the base assembly assembling mechanism, the second main transmission mechanism, screw feed mechanism, the 4th O shape circle feeding mechanism, the 4th O shape circle assembling mechanism, the screw arbor assembly assembling mechanism, cover water sealing slice feeding mechanism, the 5th O shape circle feeding mechanism, the 5th O shape circle assembling mechanism, cover water sealing slice assembly assembling mechanism, the water outlet panel feeding mechanism, the 6th O shape circle feeding mechanism, the 6th O shape circle assembling mechanism, water outlet panel assembly assembling mechanism, vanes fixed sheet feeding mechanism, vanes fixed sheet assembling mechanism, the blade feeding mechanism, the vane group mounting mechanism, the cover feeding mechanism, the 7th O shape circle feeding mechanism, the 7th O shape circle assembling mechanism, cover assembly assembling mechanism, cover assembly hold-down mechanism, the screw feeding mechanism, the set screws mounting mechanism, the defective products output mechanism, water outlet panel assembly feeding mechanism, the bulb feeding mechanism, bulb stopper feeding mechanism, bulb assembly assembling mechanism, the first dial rotation mechanism, the shell feeding mechanism, the snap ring feeding mechanism, the snap ring assembling mechanism, the snap ring pressing mechanism, the casing assembly assembling mechanism, the second dial rotation mechanism, the casing assembly detent mechanism, the bulb pressing mechanism, the platen feeding mechanism, the platen assembling mechanism, cover is filled out the water sealing slice detent mechanism, dial feed mechanism, the rotating disk assembling mechanism, discharging mechanism, the base feeding mechanism is connected with the base assembling mechanism, the first main transmission mechanism is positioned at the top of base assembling mechanism, the one O shape circle feeding mechanism is positioned at the side of base feeding mechanism, the one O shape circle assembling mechanism is positioned at the top of O shape circle feeding mechanism, the separating stand feeding mechanism is positioned at the side of O shape circle feeding mechanism, the 2nd O shape circle feeding mechanism, the 2nd O shape circle assembling mechanism, separating stand assembly assembling mechanism all is positioned at the top of separating stand feeding mechanism, the brace feeding mechanism is positioned at the side of the 2nd O shape circle feeding mechanism, the brace assembling mechanism is connected with the brace feeding mechanism, black soya bean assembly feeding mechanism is positioned at the side of brace feeding mechanism, black soya bean assembly assembling mechanism is connected with black soya bean assembly feeding mechanism, black soya bean assembly assembling mechanism is between brace assembling mechanism and black soya bean assembly pressing mechanism, the 3rd O shape circle feeding mechanism is positioned at the side of black soya bean assembly feeding mechanism, the 3rd O shape circle assembling mechanism is connected with the 3rd O shape circle feeding mechanism, the base assembly unloading device is positioned at the side of the 3rd O shape circle assembling mechanism, the base assembly feeding mechanism is positioned at the side of base assembly unloading device, the base assembly assembling mechanism is between the second main transmission mechanism and base assembly feeding mechanism, screw feed mechanism is positioned at the below of base assembly assembling mechanism, the 4th O shape circle feeding mechanism is positioned at the side of screw feed mechanism, the 4th O shape circle assembling mechanism is connected with the 4th O shape circle feeding mechanism, the screw arbor assembly assembling mechanism is positioned at the top of the 4th O shape circle assembling mechanism, cover water sealing slice feeding mechanism is connected with cover water sealing slice assembly assembling mechanism, cover water sealing slice assembly assembling mechanism is connected with the 5th O shape circle assembling mechanism, the 5th O shape circle feeding mechanism is positioned at the top of cover water sealing slice feeding mechanism, the water outlet panel feeding mechanism is positioned at the side of the 5th O shape circle feeding mechanism, the 6th O shape circle feeding mechanism is positioned at the top of water outlet panel feeding mechanism, the 6th O shape circle assembling mechanism is connected with the 6th O shape circle feeding mechanism, water outlet panel assembly assembling mechanism is positioned at the below of the 6th O shape circle assembling mechanism, vanes fixed sheet feeding mechanism is positioned at the side of water outlet panel feeding mechanism, vanes fixed sheet assembling mechanism is connected with vanes fixed sheet feeding mechanism, the blade feeding mechanism is positioned at the side of vanes fixed sheet feeding mechanism, the vane group mounting mechanism is connected with the blade feeding mechanism, the cover feeding mechanism is positioned at the below of the 7th O shape circle feeding mechanism, the 7th O shape circle assembling mechanism is connected with the 7th O shape circle feeding mechanism, cover assembly assembling mechanism is positioned at the below of the 7th O shape circle assembling mechanism, cover assembly hold-down mechanism is positioned at the top of the 7th O shape circle feeding mechanism, the screw feeding mechanism is positioned at the side with the 7th O shape circle feeding mechanism, the set screws mounting mechanism is connected with the screw feeding mechanism, the defective products output mechanism is positioned at the side of set screws mounting mechanism, water outlet panel assembly feeding mechanism is positioned at the side of defective products output mechanism, the bulb feeding mechanism is connected with bulb assembly assembling mechanism, the first dial rotation mechanism is positioned at the top of bulb assembly assembling mechanism, the shell feeding mechanism, the casing assembly assembling mechanism all is installed in the first dial rotation mechanism, the snap ring feeding mechanism is connected with the snap ring assembling mechanism, the snap ring pressing mechanism is positioned at the below of snap ring assembling mechanism, the casing assembly detent mechanism, the bulb pressing mechanism, the platen assembling mechanism, cover is filled out the water sealing slice detent mechanism, the rotating disk assembling mechanism all is installed in the second dial rotation mechanism, bulb stopper feeding mechanism is positioned at the below of discharging mechanism, the platen feeding mechanism is positioned at the below of the second dial rotation mechanism, and dial feed mechanism is positioned at the below of rotating disk assembling mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320088832 CN203125121U (en) | 2013-02-27 | 2013-02-27 | Automatic production line for sprinklers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320088832 CN203125121U (en) | 2013-02-27 | 2013-02-27 | Automatic production line for sprinklers |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203125121U true CN203125121U (en) | 2013-08-14 |
Family
ID=48933142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320088832 Expired - Fee Related CN203125121U (en) | 2013-02-27 | 2013-02-27 | Automatic production line for sprinklers |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203125121U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104875009A (en) * | 2014-02-27 | 2015-09-02 | 广州摩恩水暖器材有限公司 | Special automatic assembling device for shower |
CN108098328A (en) * | 2017-12-21 | 2018-06-01 | 厦门讯诺自动化科技有限公司 | Shower assembles production equipment |
CN113857849A (en) * | 2021-10-26 | 2021-12-31 | 苏州朗坤自动化设备股份有限公司 | Sprinkler water distribution cover assembling equipment |
-
2013
- 2013-02-27 CN CN 201320088832 patent/CN203125121U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104875009A (en) * | 2014-02-27 | 2015-09-02 | 广州摩恩水暖器材有限公司 | Special automatic assembling device for shower |
CN104875009B (en) * | 2014-02-27 | 2017-11-21 | 摩恩(常熟)厨卫制品有限公司 | The Special Automatic assembling equipment of gondola water faucet |
CN108098328A (en) * | 2017-12-21 | 2018-06-01 | 厦门讯诺自动化科技有限公司 | Shower assembles production equipment |
CN113857849A (en) * | 2021-10-26 | 2021-12-31 | 苏州朗坤自动化设备股份有限公司 | Sprinkler water distribution cover assembling equipment |
CN113857849B (en) * | 2021-10-26 | 2023-11-10 | 苏州朗坤自动化设备股份有限公司 | Gondola water faucet water diversion lid equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203125119U (en) | Valve element automatic assembling machine | |
CN203125121U (en) | Automatic production line for sprinklers | |
CN203282168U (en) | Single-way valve automatic assembling machine | |
CN205321456U (en) | Full -automatic string of beads machine | |
CN203611283U (en) | Colloidal particle cutter device | |
CN201772905U (en) | Water meter assembling device | |
CN201827010U (en) | Hydroelectric generation device with cooling tower | |
CN204570812U (en) | Water service pipe hydraulic pressure booster | |
CN203593853U (en) | Main shaft mechanism of double facer | |
CN203696781U (en) | Sand material feeding mechanism | |
CN204431726U (en) | Rotary type tower bottle cap pad inserting machine | |
CN203587165U (en) | Dry-type water meter | |
CN203792781U (en) | Rotary-discharging device | |
CN203282169U (en) | Automatic assembly machine for heater | |
CN202276222U (en) | Improvement of automatic pressure discharge mechanism of motor | |
CN208688327U (en) | A kind of eight with check function are to turning spurt water device | |
CN202360417U (en) | Water supply device of improved water-ring vacuum pump | |
CN202349301U (en) | Automatic pressure discharge mechanism for motor | |
CN204212906U (en) | A kind of mounting structure of novel water power plant vertical water turbine unit | |
CN204128602U (en) | A kind of instrument for observing and controlling discharge | |
CN202750975U (en) | Rotating dining-table embedded with liquefied gas cooker | |
CN204371705U (en) | A kind of detection device for the leak detection of chemical industry pump case | |
CN202218587U (en) | Steam guiding device of lobster stewing system | |
CN210124276U (en) | Collagen feeding device | |
CN204327377U (en) | The stator mounting structure of axial flow hydraulic turbine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130814 Termination date: 20140227 |