CN203123629U - Double-layered concentration tank of coal preparation plant - Google Patents

Double-layered concentration tank of coal preparation plant Download PDF

Info

Publication number
CN203123629U
CN203123629U CN 201320156205 CN201320156205U CN203123629U CN 203123629 U CN203123629 U CN 203123629U CN 201320156205 CN201320156205 CN 201320156205 CN 201320156205 U CN201320156205 U CN 201320156205U CN 203123629 U CN203123629 U CN 203123629U
Authority
CN
China
Prior art keywords
concentration tank
concentration basin
pump
pipeline
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320156205
Other languages
Chinese (zh)
Inventor
常德亮
马涛
马志国
吕文舵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bhjd Mining Engineering Technology (beijing) Co Ltd
Original Assignee
Bhjd Mining Engineering Technology (beijing) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bhjd Mining Engineering Technology (beijing) Co Ltd filed Critical Bhjd Mining Engineering Technology (beijing) Co Ltd
Priority to CN 201320156205 priority Critical patent/CN203123629U/en
Application granted granted Critical
Publication of CN203123629U publication Critical patent/CN203123629U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model provides a double-layered concentration tank of a coal preparation plant and belongs to the technical field of the concentration tank of the coal preparation plant. A concentration machine disclosed by the utility model is arranged in a working concentration tank; an outlet of a slime water feeding pipe is communicated with the working concentration tank; the bottom of the working concentration tank is communicated with a lower-layer concentration tank through a pipeline; the bottom of the lower-layer concentration tank is communicated with an inlet of an accident reflowing pump through a pipeline; an outlet of the accident reflowing pump is communicated with the slime water feeding pipe through a pipeline; a clarified water tank of the working concentration tank is communicated with an inlet of a clarified water pump; and an outlet of the clarified water pump is communicated with each water spot pipeline. According to the double-layered concentration tank disclosed by the utility model, the upper layer is the working concentration tank and the concentration machine is mounted; and the lower layer is an accident tank and the concentration machine is not mounted. When the working concentration tank has a fault, upper-layer materials are directly discharged into the lower-layer concentration tank through a bottom flowing opening; and when the fault is removed, the accident reflowing pump is used for pulping slime water back to the upper-layer concentration tank, so as to greatly save the initial investment and operation costs.

Description

The double-deck concentration basin of a kind of coal preparation plant
Technical field
The utility model relates to the double-deck concentration basin of a kind of coal preparation plant, belongs to coal preparation plant's concentration basin technical field.
Background technology
Coal preparation plant tradition concentration basin is two, and uses, one are standby, normally only work one, when having an accident, it are discharged in another concentration basin, and standby concentration basin becomes the work concentration basin, after the trouble shooting again replacing return.Cause bigger waste like this, need build two big concentration basins, buy two thickeners, and the utilization rate of common standby concentration basin is very low, also uses less than one time in 1 year, thereby ageing equipment is scrapped.Build two concentration basins and caused the waste of civil engineering and equipment investment.
Summary of the invention
The purpose of this utility model is in order to solve the problem that above-mentioned prior art exists, namely to build the waste that two concentration basins have caused civil engineering and equipment investment.And then provide a kind of coal preparation plant double-deck concentration basin.
The purpose of this utility model is achieved through the following technical solutions:
The double-deck concentration basin of a kind of coal preparation plant, comprise: the black water feeding pipe, the work concentration basin, the clarification water pump, lower floor's concentration basin, accident backflow pump and thickener, described thickener is arranged in the work concentration basin, the outlet of black water feeding pipe is connected with the work concentration basin, the bottom of work concentration basin is connected with the lower floor concentration basin by pipeline, the bottom of lower floor's concentration basin is connected by the backflow entrance of pump of pipeline and accident, the accident delivery side of pump that backflows is connected with the black water feeding pipe by pipeline, the clarification water tank of work concentration basin is connected with the entrance of clarification water pump, and the primary water delivery side of pump leads to each and uses the water spot pipeline.
Double-deck concentration basin of the present utility model, upper strata are the work concentration basin, and thickener is installed, and lower floor is an accident pool, and thickener is not installed.During work thickener fault, upper materials directly is discharged into lower floor's accident pool by underflow opening, after the trouble shooting, with the accident pump that backflows black water is returned the upper strata concentration basin again.Initial investment and operation cost have significantly been saved.Facts have proved, utilize the design of double-deck concentration basin up and down, can save construction investment, need not do two big concentration basins again, also saved equipment investment, only need to buy a thickener, namely saved cost of investment; Secondly, convenient management has saved personnel, has avoided unnecessary waste, has saved operation cost, has reached the purpose of energy-saving and emission-reduction.
Description of drawings
Fig. 1 is the double-deck concentration basin structural representation of a kind of coal preparation plant of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail: present embodiment has provided detailed embodiment being to implement under the prerequisite with technical solutions of the utility model, but protection domain of the present utility model is not limited to following embodiment.
As shown in Figure 1, the double-deck concentration basin of a kind of coal preparation plant that present embodiment is related, comprise: black water feeding pipe 1, work concentration basin 2, clarification water pump 5, lower floor's concentration basin 7, accident backflow pump 8 and thickener 11, described thickener 11 is arranged in the work concentration basin 2, the outlet of black water feeding pipe 1 is connected with work concentration basin 2, the bottom of work concentration basin 2 is connected with lower floor concentration basin 7 by pipeline, the bottom of lower floor's concentration basin 7 is connected by the backflow entrance of pump 8 of pipeline and accident, the backflow outlet of pump 8 of accident is connected with black water feeding pipe 1 by pipeline, the clarification water tank of work concentration basin 2 is connected with the entrance of clarification water pump 5, and the outlet 10 of clarification water pump 5 is led to each and used the water spot pipeline.
Further, also comprise work underflow pump 3, first valve 4 and second valve 6, described second valve 6 is serially connected on the pipeline between work concentration basin 2 and the lower floor's concentration basin 7, one end of first valve 4 is connected with the pipeline of work concentration basin 2 bottoms, the other end of first valve 4 is connected with the entrance of work underflow pump 3, and filter press is led in the outlet 9 of work underflow pump 3.
The above; it only is the preferable specific embodiment of the utility model; these specific embodiment all are based on the different implementations under the utility model general idea; and protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claims.

Claims (2)

1. the double-deck concentration basin of a coal preparation plant, comprise: black water feeding pipe (1), work concentration basin (2), clarification water pump (5), lower floor's concentration basin (7), accident backflow pump (8) and thickener (11), it is characterized in that, described thickener (11) is arranged in the work concentration basin (2), the outlet of black water feeding pipe (1) is connected with work concentration basin (2), the bottom of work concentration basin (2) is connected with lower floor's concentration basin (7) by pipeline, the bottom of lower floor's concentration basin (7) is connected by the backflow entrance of pump (8) of pipeline and accident, the backflow outlet of pump (8) of accident is connected with black water feeding pipe (1) by pipeline, the clarification water tank of work concentration basin (2) is connected with the entrance of clarification water pump (5), and the outlet (10) of clarification water pump (5) is led to each and used the water spot pipeline.
2. the double-deck concentration basin of coal preparation plant according to claim 1, it is characterized in that, also comprise work underflow pump (3), first valve (4) and second valve (6), described second valve (6) is serially connected on the pipeline between work concentration basin (2) and the lower floor's concentration basin (7), one end of first valve (4) is connected with the pipeline of work concentration basin (2) bottom, the other end of first valve (4) is connected with the entrance of work underflow pump (3), and filter press is led in the outlet (9) of work underflow pump (3).
CN 201320156205 2013-03-22 2013-03-22 Double-layered concentration tank of coal preparation plant Expired - Fee Related CN203123629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320156205 CN203123629U (en) 2013-03-22 2013-03-22 Double-layered concentration tank of coal preparation plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320156205 CN203123629U (en) 2013-03-22 2013-03-22 Double-layered concentration tank of coal preparation plant

Publications (1)

Publication Number Publication Date
CN203123629U true CN203123629U (en) 2013-08-14

Family

ID=48931659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320156205 Expired - Fee Related CN203123629U (en) 2013-03-22 2013-03-22 Double-layered concentration tank of coal preparation plant

Country Status (1)

Country Link
CN (1) CN203123629U (en)

Similar Documents

Publication Publication Date Title
CN204939112U (en) A kind of waste disposal plant
CN203123629U (en) Double-layered concentration tank of coal preparation plant
CN208260286U (en) Wire cutting machine tool cutting liquid circulation filter
CN203701193U (en) Water circulating utilization system on construction site
CN101947523A (en) Device for recycling silicon wafer cleaning wastewater
CN207228278U (en) A kind of intelligent city builds rain recycling system
CN202482940U (en) Household reclaimed water processing and recycling device
CN201882932U (en) Device for reusing cleaning waste water of silicon chips
CN204312028U (en) Underground coal mine horizontal orientation km rig water treatment facilities
CN211849714U (en) Circulating flushing and emergency fire-fighting water supply device for construction site
CN210131449U (en) Drainage device with adjusting function for mine underground drainage
CN208811704U (en) A kind of cutting fluid management system
CN201932962U (en) Metal wastewater treatment device
CN205577075U (en) Floating bottom valve device
CN101818516B (en) Domestic sewage recycling device
CN202569677U (en) Ore pulp pool feeding pipeline back flushing structure
CN204911010U (en) Water injection well is filter equipment for well -flushing
CN204983013U (en) Water purifier water saving system
CN203308408U (en) Backwashing system of wellhead sump oil and sewage collection re-injection device
CN205088732U (en) Pond waste water utilization system of washing hand
CN210331775U (en) Water circulation system for cleaning decorative paper workshop
CN211163294U (en) A management and control equipment is concentrated to abrasive dust liquid for collars grinding machine
CN202247167U (en) Simple water storage tank for water-jet loom
CN213295663U (en) Water inlet device of water jet loom
CN201722740U (en) Reclaimed water recycling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20210322

CF01 Termination of patent right due to non-payment of annual fee