Prior art keywords
water
balancer
water level
chamber
level meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220741959
Other languages
Chinese (zh)
Inventor
李彦伟
李松峰
刘绪超
宁守庆
刘怀宇
张百根
王涛
郑东升
李强
颜世明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tobacco Henan Industrial Co Ltd
Original Assignee
China Tobacco Henan Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tobacco Henan Industrial Co Ltd filed Critical China Tobacco Henan Industrial Co Ltd
Priority to CN 201220741959 priority Critical patent/CN203099795U/en
Application granted granted Critical
Publication of CN203099795U publication Critical patent/CN203099795U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)

Abstract

A connecting structure of a boiler double-chamber balancer and a water gauge comprises a boiler body, the double-chamber balancer and the water gauge. The lower portion of the double-chamber balancer is communicated with a differential pressure transmitter through a positive pressure guide pipe and a negative pressure guide pipe, a water blow-off pipe is connected on the lower portion of the water gauge, a water blow-off valve is arranged on the water blow-off pipe, the boiler body is provided with a steam main connecting pipe and a water main connecting pipe, a steam tee joint is arranged at the front end of the steam main connecting pipe, and the other two ends of the steam tee joint are respectively communicated with the double-chamber balancer and the water gauge. A water tee joint is arranged at the front end of the water main connecting pipe, the other two ends of the water tee joint are respectively communicated with the double-chamber balancer and the water gauge. The connecting structure of the boiler double-chamber balancer and the water gauge is simple in structure, convenient to implement and capable of achieving the purpose that the water gauge and the double-chamber balancer are mounted separately in an opposite direction, water and steam of the water gauge and the double-chamber balancer are respectively and separately supplied, the low water level can be avoided when the water gauge is washed, abnormal boiler stopping can be prevented, the purpose of detecting the water gauge without stopping the boiler can be achieved, and the reliability of production steam is guaranteed.

Description

The two chambers of a kind of boiler balancer is connected with the water level meter
Technical field
The utility model belongs to the boiler plant technical field, and the two chambers of particularly a kind of boiler balancer is connected with the water level meter.
Background technology
At present, two chamber balancers and water level meter are installed, because the design defect of water level meter causes the boiler operatiopn instability on the boiler, the concrete problem that exists is: 1, the Lai Shui of water level meter, come vapour communicating pipe in the balancer of two chambers, to draw, the timing of flushing water level, the water of two chambers balancer inner room is together washed, during flushing vapour connecting leg, produce low water level, during the flushing water connecting leg, produce high water level, cause improper blowing out accident during low water level easily; 2, water level meter Lai Shui, come vapour communicating pipe in the balancer of two chambers, to draw, water level must could overhaul during in respect of fault in blowing out, influences normal safe operation of boiler and process steam and protects and supply.
The utility model content
The utility model provide a kind of simple in structure, be convenient to implement be connected with the water level meter with the two chambers of boiler safe and reliable to operation balancer.
For achieving the above object, the technical solution of the utility model is: the two chambers of a kind of boiler balancer is connected with the water level meter, comprise boiler body, two chambers balancer and water level meter, balancer bottom, two chamber is communicated with differential pressure transmitter by positive connecting pipe and negative connecting pipe, water level meter bottom is connected with adjutage, adjutage is provided with Draw off valve, described boiler body is provided with vapour master connecting leg and comes water master connecting leg, come vapour master connecting leg front end to be provided with the vapour threeway, come the other two ends of vapour threeway to be connected with two chambers balancer and water level meter respectively; Come water master connecting leg front end to be provided with the water threeway, come the other two ends of water threeway to be connected with two chambers balancer and water level meter respectively.
Describedly come to be provided with the steam valve door between vapour threeway and the water level meter, come to be provided with penstock between water threeway and the water level meter.
Compared with prior art, the utility model has the advantages that:
1, the utility model comprises boiler body, two chambers balancer and water level meter, balancer bottom, two chamber is communicated with differential pressure transmitter by positive connecting pipe and negative connecting pipe, water level meter bottom is connected with adjutage, adjutage is provided with Draw off valve, described boiler body is provided with vapour master connecting leg and comes water master connecting leg, come vapour master connecting leg front end to be provided with the vapour threeway, come the other two ends of vapour threeway to be connected with two chambers balancer and water level meter respectively; Come water master connecting leg front end to be provided with the water threeway, come the other two ends of water threeway to be connected with two chambers balancer and water level meter respectively, it is simple in structure, be convenient to implement, can realize that water level meter and two chambers balancer are installed separately in opposite directions, make water level meter and two chambers balancer Lai Shui, come vapour to supply with separately respectively, can avoid washing the generation of water level timing low water level, prevent improper blowing out, can realize not shutdown maintenance water level meter, guarantee the reliability of process steam.
2, come to be provided with the steam valve door between vapour threeway and the water level meter, come to be provided with penstock between water threeway and the water level meter, come the steam valve door and come penstock as isolating valve, in the time of can realizing water level in respect of fault, not blowing out is overhauled.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
The two chambers of boiler as shown in Figure 1 balancer is connected with the water level meter, and it comprises boiler body 1, two chambers balancer 3 and water level meter 2, is communicated with differential pressure transmitter 7 by positive connecting pipe 5 with negative connecting pipe 6 in the bottom of two chambers balancer 3; Be connected with adjutage 4 in the bottom of water level meter 2, adjutage 4 is provided with Draw off valve 8.On boiler body 1, be provided with vapour master connecting leg 9 and come water master connecting leg 10, come the front end of vapour master connecting leg 9 to be provided with vapour threeway 11, come the other two ends of vapour threeway 11 to be connected with two chambers balancer 3 and water level meter 2 respectively, come to be provided with steam valve door 12 between vapour threeway 11 and the water level meter 2; Come the front end of water master connecting leg 10 to be provided with water threeway 13, come the other two ends of water threeway 13 to be connected with two chambers balancer 3 and water level meter 2 respectively, come to be provided with penstock 14 between water threeway 13 and the water level meter 2.
In the present embodiment, come vapour threeway 11 and come water threeway 13 to be the threeway of DN25 flange form, come steam valve door 12 and come penstock 14 to be the DN25 valve, as isolating valve, in the time of can realizing that water level meter 2 has fault, not blowing out is overhauled.

Claims (2)

1. the two chambers of a boiler balancer is connected with the water level meter, comprise boiler body, two chambers balancer and water level meter, balancer bottom, two chamber is communicated with differential pressure transmitter by positive connecting pipe and negative connecting pipe, water level meter bottom is connected with adjutage, adjutage is provided with Draw off valve, it is characterized in that, described boiler body is provided with vapour master connecting leg and comes water master connecting leg, come vapour master connecting leg front end to be provided with the vapour threeway, come the other two ends of vapour threeway to be connected with two chambers balancer and water level meter respectively; Come water master connecting leg front end to be provided with the water threeway, come the other two ends of water threeway to be connected with two chambers balancer and water level meter respectively.
2. the two chambers of boiler as claimed in claim 1 balancer is connected with the water level meter, it is characterized in that, describedly comes to be provided with the steam valve door between vapour threeway and the water level meter, comes to be provided with penstock between water threeway and the water level meter.
CN 201220741959 2012-12-31 2012-12-31 Connecting structure of boiler double-chamber balancer and water gauge Expired - Lifetime CN203099795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220741959 CN203099795U (en) 2012-12-31 2012-12-31 Connecting structure of boiler double-chamber balancer and water gauge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220741959 CN203099795U (en) 2012-12-31 2012-12-31 Connecting structure of boiler double-chamber balancer and water gauge

Publications (1)

Publication Number Publication Date
CN203099795U true CN203099795U (en) 2013-07-31

Family

ID=48851193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220741959 Expired - Lifetime CN203099795U (en) 2012-12-31 2012-12-31 Connecting structure of boiler double-chamber balancer and water gauge

Country Status (1)

Country Link
CN (1) CN203099795U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107052003A (en) * 2017-06-05 2017-08-18 浙江国际海运职业技术学院 Boiler water gauge flusher and boiler water gauge purging method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107052003A (en) * 2017-06-05 2017-08-18 浙江国际海运职业技术学院 Boiler water gauge flusher and boiler water gauge purging method

Similar Documents

Publication Publication Date Title
CN107762574B (en) Measurement structure of cylinder steam pressure in double-layer cylinder
CN203099795U (en) Connecting structure of boiler double-chamber balancer and water gauge
CN102330644A (en) Wind wheel locking device for wind generating set
CN202983670U (en) Vacuum discharging reaction still
CN105156256A (en) Air supplementing structure for runner blades for water turbine
CN204298093U (en) A kind of high-efficiency dissolued-air pipe
CN204924572U (en) Close machine that detects of automatic aqueous vapor of through type hub
CN208237310U (en) A kind of connector of hydraulic system attachment pressure inlet
CN201826350U (en) Automatic air supply device of air pressure water supply tank
CN204284059U (en) A kind of oil sources block
CN201650384U (en) Minitype turbine thermodynamic system
CN205193008U (en) Novel serial test block is markd to cinder
CN205207095U (en) A air compressor machine oil tank extraction negative pressure system for emptying divide workshop
CN203782651U (en) Detecting device for workshops to be logged by water
CN204214609U (en) A kind of coal mining motor water channel water test unit
CN204604214U (en) Hydraulic turbine servomotor oil distributor installation special tool
CN204717015U (en) Refrigeration plant straight-through stop valve
CN202787389U (en) Negative-pressure suppressor
CN201834894U (en) Automatic pressure relief water segregator for coal gas producer
CN203114359U (en) Steamer nose device
CN202901842U (en) Gas drainer observation buoy
CN201982839U (en) Pipeline flange
CN203430687U (en) Sealing device of water turbine main shaft
CN201943644U (en) Thread-sealing device for gas well casing pipe
CN205744013U (en) A kind of hot well water replanishing device automatically

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 450000 Yulin South Road, Henan, Zheng Dong, No. 16 South Road, Zhengzhou

Patentee after: CHINA TOBACCO HENAN INDUSTRIAL Co.,Ltd.

Address before: 450000 Henan province Zhengzhou guanchengou Longhai Road No. 72 (Zhengzhou factory)

Patentee before: CHINA TOBACCO HENAN INDUSTRIAL Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130731