CN203099185U - Integrated pipeline - Google Patents
Integrated pipeline Download PDFInfo
- Publication number
- CN203099185U CN203099185U CN 201220752728 CN201220752728U CN203099185U CN 203099185 U CN203099185 U CN 203099185U CN 201220752728 CN201220752728 CN 201220752728 CN 201220752728 U CN201220752728 U CN 201220752728U CN 203099185 U CN203099185 U CN 203099185U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- connector
- thermometer
- joint
- pipeline body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Measuring Fluid Pressure (AREA)
Abstract
The utility model relates to the technical field of natural gas pipelines, in particular to an integrated pipeline. The integrated pipeline comprises a pipeline body, a left flange connector and a right flange connector are respectively arranged at two ends of the pipeline body, a pressure gauge connector and a pressure sensor connector communicated with the inner cavity of the pipeline body are fixedly and respectively mounted on the pipeline body through welding, a thermometer connection tube and a temperature sensor connection tube with inner ends located in the inner cavity of the pipeline body are respectively fixed on the pipeline body through welding, and valves are respectively and fixedly mounted on the pressure gauge connector, the pressure sensor connector, the thermometer connection tube and the temperature sensor connection tube. The integrated pipeline is simple in structure, and convenient to use, and due to the fact that the integrated pipeline can be processed into a standard component in a factory, work efficiency is improved, and cost is reduced.
Description
Technical field
The utility model relates to the natural gas line technical field, is a kind of integrated pipeline.
Background technique
In the natural gas line course of conveying, on-the-spot perforate of pipeline and welding difficulty are big, thermometric are installed at the scene, the load cell difficulty of construction is big, when pipe fitting goes wrong, are difficult for finding and changing.
Summary of the invention
The utility model provides a kind of integrated pipeline, has overcome the deficiency of above-mentioned prior art, and it can solve the big problem of pipe fitting site operation difficulty.
The technical solution of the utility model is achieved like this: a kind of integrated pipeline comprises body; At the two ends of body left flanged joint and right flanged joint are arranged respectively, on body, be installed with GAUGE CONNECTOR and the pressure transducer joint that communicates with tube cavity by welding respectively, the inner is positioned at the nozzle for thermometer of tube cavity and temperature transducer is taken over by being welded with respectively on body, is installed with valve respectively on GAUGE CONNECTOR, pressure transducer joint, nozzle for thermometer and temperature transducer are taken over.
Above GAUGE CONNECTOR upper end is installed with pressure gauge, and the upper end of pressure transducer joint is installed with pressure transducer, and the upper end of nozzle for thermometer is installed with thermometer, and the upper end that temperature transducer is taken over is installed with temperature transducer.
To be installed with at least one standby joint by welding on the upper tube body.
The utility model is simple in structure, and is easy to use, because it can adopt in factory process and become standard piece, therefore improved working efficiency, reduced cost.
Description of drawings
Fig. 1 is main TV structure figure of the present utility model.
Coding among the figure is respectively: 1 is body, and 2 is left flanged joint, and 3 is right flanged joint, and 4 is GAUGE CONNECTOR, 5 is the pressure transducer joint, and 6 is nozzle for thermometer, and 7 are the temperature transducer adapter, and 8 is valve, 9 is pressure gauge, and 10 is pressure transducer, and 11 is thermometer, and 12 is temperature transducer.
Embodiment
As shown in Figure 1, this integrated pipeline comprises body 1; Left flanged joint 2 and right flanged joint 3 are arranged respectively at the two ends of body 1, on body 1, be installed with GAUGE CONNECTOR 4 and the pressure transducer joint 5 that communicates with tube cavity by welding respectively, the inner is positioned at the nozzle for thermometer 6 of tube cavity and temperature transducer takes over 7 by being welded with respectively on body 1, takes on 7 at GAUGE CONNECTOR 4, pressure transducer joint 5, nozzle for thermometer 6 and temperature transducer and is installed with valve 8 respectively.The utility model can adopt in factory process and become standard piece, has therefore improved working efficiency, has reduced cost.
As shown in Figure 1, can be as required, GAUGE CONNECTOR 4 upper ends are installed with pressure gauge 9, and the upper end of pressure transducer joint 5 is installed with pressure transducer 10, the upper end of nozzle for thermometer 6 is installed with thermometer 11, and the upper end of temperature transducer adapter 7 is installed with temperature transducer 12.
As required, on body 1, be installed with at least one standby joint by welding.
Claims (3)
1. an integrated pipeline is characterized in that comprising body (1); Left flanged joint (2) and right flanged joint (3) are arranged respectively at the two ends of body (1), on body (1), be installed with GAUGE CONNECTOR (4) and the pressure transducer joint (5) that communicates with body (1) inner chamber by welding respectively, the inner is positioned at the nozzle for thermometer (6) of body (1) inner chamber and temperature transducer is taken over (7) by being welded with respectively on body (1), is installed with valve (8) respectively in GAUGE CONNECTOR (4), pressure transducer joint (5), nozzle for thermometer (6) and temperature transducer adapter (7).
2. integrated pipeline according to claim 1, it is characterized in that GAUGE CONNECTOR (4) upper end is installed with pressure gauge (9), the upper end of pressure transducer joint (5) is installed with pressure transducer (10), the upper end of nozzle for thermometer (6) is installed with thermometer (11), and the upper end that temperature transducer is taken over (7) is installed with temperature transducer (12).
3. integrated pipeline according to claim 1 and 2 is characterized in that body (1) upward is installed with at least one standby joint by welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220752728 CN203099185U (en) | 2012-12-11 | 2012-12-11 | Integrated pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220752728 CN203099185U (en) | 2012-12-11 | 2012-12-11 | Integrated pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203099185U true CN203099185U (en) | 2013-07-31 |
Family
ID=48850589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220752728 Expired - Fee Related CN203099185U (en) | 2012-12-11 | 2012-12-11 | Integrated pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203099185U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105587704A (en) * | 2016-01-28 | 2016-05-18 | 太仓市高泰机械有限公司 | Hydraulic impact force detecting hydraulic valve |
CN106122620A (en) * | 2015-05-07 | 2016-11-16 | 哈尔滨飞机工业集团有限责任公司 | A kind of switching device of manometer |
-
2012
- 2012-12-11 CN CN 201220752728 patent/CN203099185U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106122620A (en) * | 2015-05-07 | 2016-11-16 | 哈尔滨飞机工业集团有限责任公司 | A kind of switching device of manometer |
CN105587704A (en) * | 2016-01-28 | 2016-05-18 | 太仓市高泰机械有限公司 | Hydraulic impact force detecting hydraulic valve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203099185U (en) | Integrated pipeline | |
CN201464143U (en) | Special tool for detecting water leakage point of water-cooling pipe on cooling wall of blast furnace | |
CN202852294U (en) | Temperature-pressure integration pipeline integration device | |
CN102410412A (en) | Cu-Al pipe joint | |
CN203686423U (en) | Sealed type straight pipe barb fitting | |
CN203869960U (en) | Pipe fitting quick pressure-testing device | |
CN203979696U (en) | Pipe joint in a kind of air conditioner condensation water system | |
CN202132639U (en) | Connecting device for flexible pipes | |
CN202203554U (en) | Negative pressure sealing flange connection device | |
CN203686578U (en) | Air distributing device adding corrosive air from bypass | |
CN202597979U (en) | Calipers flange welding type corrugated pipe | |
CN204494077U (en) | Increase the structure that end socket pressurized hole improves pipeline flexibility | |
CN203880403U (en) | Temperature gauge for petrochemical pump valve mechanical seal flushing system | |
CN102853189B (en) | Hose connecting device | |
CN201973380U (en) | Marine high-pressure weldless pipe connector | |
CN204114285U (en) | Pressure detection device | |
CN203979739U (en) | The parallel transport pipe connecting bend of a kind of integrated type | |
CN202260303U (en) | Hexagonal hose connector | |
CN201281194Y (en) | Steel thick seamless inclined three-way | |
CN202012660U (en) | Pressure gage stop valve with integrated valve and clamp sleeve | |
CN202951373U (en) | Output structure of air distributing box | |
CN203809923U (en) | Multifunctional valve group | |
CN104948868A (en) | Integrated connecting bend for parallel oil delivery pipes | |
CN202834516U (en) | Corrugated pipe connection device | |
CN202252529U (en) | Three-fork joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |