CN203097858U - Filling device of foaming agents and antifoaming agents - Google Patents
Filling device of foaming agents and antifoaming agents Download PDFInfo
- Publication number
- CN203097858U CN203097858U CN 201320082332 CN201320082332U CN203097858U CN 203097858 U CN203097858 U CN 203097858U CN 201320082332 CN201320082332 CN 201320082332 CN 201320082332 U CN201320082332 U CN 201320082332U CN 203097858 U CN203097858 U CN 203097858U
- Authority
- CN
- China
- Prior art keywords
- foaming
- froth breaking
- tank body
- antifoaming
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
A filling device of foaming agents and antifoaming agents comprises a foaming tank body, a foaming energy storage device, an antifoaming tank body, an antifoaming energy storage device and an anti-explosion electric control cabinet. The filling device is characterized in that the lower end of the antifoaming tank body is connected with an inlet of an antifoaming metering pump, an outlet of the antifoaming metering pump is connected with an antifoaming stop valve connected with an antifoaming filling head, the antifoaming tank body is provided with an antifoaming liquid indicator, the lower end of the foaming tank body is respectively connected with an inlet of a first foaming metering pump and an inlet of a second foaming metering pump through a first foaming filter and a second foaming filter, an outlet of the first foaming metering pump and an outlet of the second foaming metering pump are connected with two interfaces of a foaming tee joint respectively through a first foaming high-pressure ball valve and a second foaming high-pressure ball valve, the foaming tee joint is connected with a foaming agent filling head, and the foaming tank body is provided with a foaming liquid indicator. The filling device is suitable for being used for filling the antifoaming agents and the foaming agents for a natural gas well head and a pipeline with a filling speed below 120L/h, the antifoaming agents and the foaming agents are added to the natural gas well head and the pipeline in a double metering pump double-loop mode according to a certain proportion, and operation is easy and convenient.
Description
Technical field
The utility model relates to the filling defoamer and the frother device of a kind of natural gas well head and pipeline, and is especially a kind of with defoamer and frother adding gas distributing system, makes natural gas well head and pipeline have the bubble row froth breaking filling apparatus of water pumping gas production.
Background technology
In the development process of oil-gas reservoir, water outlet is a unavoidable problem.And major part is oily, gas all is in the water-cut stage extraction, therefore will reach higher ultimate recovery, must adjust to prolong the band water productive life according to the moisture situation of individual well, has a strong impact on exploitation cycle and quality.
The chemistry drainage has advantages such as easy construction, instant effect, expense are low, has become the first-selected technology of domestic and international gas field water pumping gas production, uses comparatively extensively, and the ratio that accounts for domestic water pumping gas production is about 40%.Present existing special equipment only is provided with a foaming measuring pump filling frother, and be not suitable at foaming measuring pump continuous filling frother between turn(a)round, therefore demand providing a kind of urgently and be applicable to that two foaming measuring pump double loops are uninterruptedly to the device of natural gas well head filling defoamer and frother, to satisfy the demand.
Summary of the invention
The purpose of this utility model is to provide a kind of bubble row froth breaking filling apparatus in order to solve the problems of the technologies described above, be applicable to natural gas well head and pipeline filling defoamer and the frother of flow below 120L/h, defoamer and frother are joined among natural gas well head and the pipeline with pair measuring pump double loops mode down according to a certain percentage, easy and simple to handle.
The utility model is achieved in that and comprises foaming tank body, foaming accumulator, froth breaking tank body, froth breaking accumulator and explosion-proof electrical control cubicles in order to achieve the above object, it is characterized in that: froth breaking tank body lower end is connected on the froth breaking metering pump intake by froth breaking ball valve, froth breaking strainer, froth breaking metering pump discharge is connected on the froth breaking stop valve by pipeline, this pipeline is provided with froth breaking one way valve, froth breaking accumulator, and the froth breaking stop valve connects the froth breaking filling head; Froth breaking needle valve and froth breaking safety valve are connected froth breaking tank body upper end by threeway, and the froth breaking tank body is provided with the froth breaking content gauge; Tee ball valve is passed through in foaming tank body lower end, foaming 1# strainer, foaming 2# strainer is connected on the foaming 1# measuring pump inlet, on the inlet of foaming 2# measuring pump, foaming 1# measures delivery side of pump, foaming 2# metering delivery side of pump is respectively by foaming 1# high-pressure ball valve, foaming 2# high-pressure ball valve is connected on two interfaces of foaming threeway, the foaming threeway connects the foaming filling head by pipeline, this pipeline is provided with the foaming one way valve, foaming accumulator and foaming stop valve, the outlet of the outlet of foaming needle valve and foaming safety valve is connected the upper end of foaming tank body by threeway, and the foaming content gauge is set on the foaming tank body.
The utility model has the advantages that: be applicable to natural gas well head and pipeline filling defoamer and the frother of flow below 120L/h, defoamer and frother are joined among natural gas well head and the pipeline with pair measuring pump double loops mode down according to a certain percentage, easy and simple to handle.
Description of drawings
The syndeton schematic diagram that Fig. 1 is the utility model in whole natural gas well head and the two measuring pump double loops of pipeline mode are annotated defoamer and frother system.
Fig. 2 is a stereogram of the present utility model.
Component serial number among the figure: foaming 2# high-pressure ball valve 1, froth breaking filling head 2, foaming filling head 3, foaming content gauge 4, foaming tank body 5, foaming stop valve 6, foaming one way valve 7, foaming accumulator 8, foaming needle valve 9, foaming safety valve 10, foaming pressure meter 11, froth breaking stop valve 12, froth breaking needle valve 13, froth breaking safety valve 14, froth breaking pressure meter 15, froth breaking accumulator 16, froth breaking one way valve 17, froth breaking elbow 18, froth breaking threeway 19, froth breaking content gauge 20, froth breaking tank body 21, explosion-proof electrical control cubicles 22, protect outer box plate 23, froth breaking measuring pump 24, foaming high pressure elbow 25, foaming 1# high-pressure ball valve 26, foaming 1# measuring pump 27, foaming 1# strainer 28, tee ball valve 29, foaming 2# strainer 30, foaming threeway 31, foaming 2# measuring pump 32, threeway 33, defoamer inlet 34, froth breaking strainer 35, froth breaking ball valve 36, elbow 37, frother inlet 38.
The specific embodiment
See Fig. 1,2, concrete structure is as follows: froth breaking tank body 21, foaming tank body 5, froth breaking measuring pump 24, foaming 1# measuring pump 27, foaming 2# measuring pump 32, explosion-proof electrical control cubicles 22 are fixedly mounted on the outer box plate 23 of protection, froth breaking tank body 21 lower ends are connected on froth breaking measuring pump 24 inlets by froth breaking ball valve 36, froth breaking strainer 35 and elbow 37,24 outlets of froth breaking measuring pump are connected froth breaking stop valve 12 by froth breaking threeway 19 with froth breaking elbow 18 with pipeline, this pipeline is provided with froth breaking one way valve 17, froth breaking accumulator 16, froth breaking pressure meter 15; Froth breaking stop valve 13 connects froth breaking filling head 2, and froth breaking filling head 2 is connected on the natural gas line; Froth breaking needle valve 13 and froth breaking safety valve 14 are connected froth breaking tank body 21 upper ends by threeway 33, and froth breaking tank body 21 is provided with froth breaking content gauge 20; Foaming tank body 5 lower ends are by tee ball valve 29, foaming 1# strainer 28, foaming 2# strainer 30 is connected on foaming 1# measuring pump 27 inlets, on the inlet of foaming 2# measuring pump 32, the outlet of foaming 1# measuring pump 27, the outlet of foaming 2# measuring pump 32 is respectively by foaming 1# high-pressure ball valve 26, foaming 2# high-pressure ball valve 1 connects two interfaces of foaming threeway 31, foaming threeway 31 connects foaming filling head 3 by pipeline, pipeline is provided with foaming one way valve 7, foaming accumulator 8, foaming pressure meter 11 and foaming stop valve 6, the outlet of the outlet of foaming needle valve 9 and foaming safety valve 10 is connected the upper end of foaming tank body 5 by threeway, and foaming tank body 5 is provided with foaming content gauge 4.
Operating principle: by manually defoamer and frother being entered the mouth 34 from defoamer respectively, frother inlet 38 is poured in froth breaking tank body 2 and the foaming tank body 3, by operation froth breaking ball valve 36 and explosion-proof electrical control cubicles 22, use 24 pressurizations of froth breaking measuring pump, by froth breaking stop valve 12 and froth breaking filling head 2 defoamer of in natural gas line, annotating, by operation tee ball valve 29, foaming 1# high-pressure ball valve 26, foaming 2# high-pressure ball valve 1, operate explosion-proof electrical control cubicles 22, realize that two foaming measuring pumps switch pressurization, be filled among the natural gas well head surplus that can conveniently observe two kinds of medicaments of tank body by content gauge at last via foaming stop valve 6 and foaming filling head 3.
The device of this filling defoamer and foaming is to constitute two independent loops and two changeable design of foaming measuring pump, by operated valve and electrical control cubicles, can work simultaneously in realization froth breaking and foaming loop, and two foaming measuring pumps can one be opened 1 switching mode that the is equipped with frother of annotating in the natural gas well head, and the reliable measuring pump addition of regulating defoamer and frother.
Claims (1)
1. a bubble is arranged the froth breaking filling apparatus, comprise foaming tank body, foaming accumulator, froth breaking tank body, froth breaking accumulator and explosion-proof electrical control cubicles, it is characterized in that: froth breaking tank body lower end is connected on the froth breaking metering pump intake by froth breaking ball valve, froth breaking strainer, froth breaking metering pump discharge is connected on the froth breaking stop valve by pipeline, this pipeline is provided with froth breaking one way valve, froth breaking accumulator, and the froth breaking stop valve connects the froth breaking filling head; Froth breaking needle valve and froth breaking safety valve are connected froth breaking tank body upper end by threeway, and the froth breaking tank body is provided with the froth breaking content gauge; Tee ball valve is passed through in foaming tank body lower end, foaming 1# strainer, foaming 2# strainer is connected on the foaming 1# measuring pump inlet, on the inlet of foaming 2# measuring pump, foaming 1# measures delivery side of pump, foaming 2# metering delivery side of pump is respectively by foaming 1# high-pressure ball valve, foaming 2# high-pressure ball valve is connected on two interfaces of foaming threeway, the foaming threeway connects the foaming filling head by pipeline, this pipeline is provided with the foaming one way valve, foaming accumulator and foaming stop valve, the outlet of the outlet of foaming needle valve and foaming safety valve is connected the upper end of foaming tank body by threeway, and the foaming content gauge is set on the foaming tank body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320082332 CN203097858U (en) | 2013-02-23 | 2013-02-23 | Filling device of foaming agents and antifoaming agents |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320082332 CN203097858U (en) | 2013-02-23 | 2013-02-23 | Filling device of foaming agents and antifoaming agents |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203097858U true CN203097858U (en) | 2013-07-31 |
Family
ID=48849267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320082332 Expired - Fee Related CN203097858U (en) | 2013-02-23 | 2013-02-23 | Filling device of foaming agents and antifoaming agents |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203097858U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105820852A (en) * | 2015-01-08 | 2016-08-03 | 中国石油天然气股份有限公司 | Foam removal device |
-
2013
- 2013-02-23 CN CN 201320082332 patent/CN203097858U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105820852A (en) * | 2015-01-08 | 2016-08-03 | 中国石油天然气股份有限公司 | Foam removal device |
CN105820852B (en) * | 2015-01-08 | 2019-07-05 | 中国石油天然气股份有限公司 | Bubble elimination device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201705319U (en) | Skid-mounted closed dosing device | |
CN104265240A (en) | Added water diluting electric wellhead dosing process | |
CN202001014U (en) | Intelligent dust-settling device of mining machine | |
CN203097858U (en) | Filling device of foaming agents and antifoaming agents | |
CN203097833U (en) | Inhibiter filling device | |
CN103285756A (en) | Gas mixing device | |
CN102182457A (en) | Intelligent dust-fall device of excavator | |
CN201783317U (en) | Automatic feeding device for sewage treatment powder | |
CN207486451U (en) | Skid antifoaming agent filling apparatus | |
CN203155194U (en) | Aerosol generator | |
CN201558430U (en) | Flow balance self-controlling type foam proportioning device | |
CN201896604U (en) | Self-operated integrated medicine feeding device | |
CN201412131Y (en) | Non-powered water-carrying constant-speed heating dosing device | |
CN203099343U (en) | Double metering pump motor-driven prying-arranged alcohol filling device | |
CN102937531A (en) | Downhole oil-gas separation experimental device | |
CN203971848U (en) | Tertiary oil production in oil field polymer dispersed dissolver | |
CN206563692U (en) | A kind of foamed pipe flow field simulation and observation experiment device | |
CN205248362U (en) | Hold battery solution ration filling machine | |
CN204356153U (en) | Siphon liquid gas injection system | |
CN204493186U (en) | A kind of liquid supply device of small displacement oil-gas mixed delivery pump | |
CN211232424U (en) | Defoaming agent instilling device mounted on gas transmission pipeline | |
CN221096491U (en) | CCUS-EOR online energy supplementing device | |
CN207826617U (en) | A kind of water filling device of water stemming bag | |
CN201202973Y (en) | Oil and gas separated dosing apparatus | |
CN208918517U (en) | A kind of water filling device for water injection well in oil fields |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130731 Termination date: 20150223 |
|
EXPY | Termination of patent right or utility model |