CN203097257U - Wall-connecting anchoring part for scaffolds - Google Patents

Wall-connecting anchoring part for scaffolds Download PDF

Info

Publication number
CN203097257U
CN203097257U CN 201220666158 CN201220666158U CN203097257U CN 203097257 U CN203097257 U CN 203097257U CN 201220666158 CN201220666158 CN 201220666158 CN 201220666158 U CN201220666158 U CN 201220666158U CN 203097257 U CN203097257 U CN 203097257U
Authority
CN
China
Prior art keywords
wall
scaffold
stay pipe
bolt
company
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220666158
Other languages
Chinese (zh)
Inventor
张远
蔡天机
戴本铿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Electric Power Engineering Bureau Co ltd Of China Energy Engineering Corp ltd
Original Assignee
CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU filed Critical CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU
Priority to CN 201220666158 priority Critical patent/CN203097257U/en
Application granted granted Critical
Publication of CN203097257U publication Critical patent/CN203097257U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model disclose a wall-connecting anchoring part for scaffolds, which comprises rigid supporting tubes which are butted with a split bolt hole left in wall construction, end cover plates are arranged on the ends of the supporting tubes, a bolt runs through both the whole split bolt hole and the whole supporting tubes, nuts are arranged on the ends of the bolt, the supporting tubes can be tightly pressed on the surfaces of the wall by screwing down the nuts, and horizontal pipes on a scaffold are connected with the supporting tubes through fasteners. Because the supporting tubes tightly pressed on the surfaces of the wall can provide the scaffold with rigid support, the scaffold can be reliably connected with the wall, and the scaffold can be dismantled by loosening the fasteners. The scaffold is easy and convenient to connect and dismantle, and the difficulty of construction is low. Moreover, by unscrewing the nuts on the ends of the bolt, the supporting tubes and the bolt can be removed from the wall, so the appearance of the wall cannot be affected.

Description

A kind of company's joist anchor firmware of scaffold
Technical field
The utility model relates to the syndeton of scaffold and body of wall, particularly a kind of being arranged on the body of wall in order to connect the anchoring piece structure of scaffold.
Background technology
During wall construction, on the body of wall wall, need to be provided with anchoring piece and be connected, to improve the stability and the supporting capacity of scaffold with scaffold; Avoid scaffold accident such as topple over, cave in to take place, make scaffold safer.At present, the anchoring piece structure of scaffold connecting spare mainly contains two kinds, and a kind of structure is the pre-buried anchor slab that is arranged on body of wall 101 body structure surfaces, as shown in Figure 1, when being connected with scaffold, it needs the end of the rigidity connecting rod 103 that will fasten with scaffold to be welded on the anchor slab 102; And when removing scaffold, need again the rigidity connecting rod is cut down from anchor slab.This kind structure, the connection of its scaffold and dismounting trouble, difficulty of construction is big; And the anchor slab that is embedded in surface of wall can influence the outward appearance of body of wall, particularly has the anchor slab of scar after welding and cutting, can influence the attractive in appearance of body of wall greatly.Another kind of structure comprises attached to the anchor slab on body of wall 201 two sides 202 and passes the split bolt 203 of body of wall 201 and two anchor slabs 202, and the nut 204 by the split bolt two ends is pressed on the body of wall wall with anchor slab, as shown in Figure 2.This kind structure can not influence the attractive in appearance of body of wall, but its connection with scaffold is identical with the former with dismounting, also needs welding and cutting, and its same difficulty of construction is big.
The utility model content
The utility model aims to provide and a kind ofly can not influence the body of wall outward appearance, with the company's joist anchor firmware that is connected and removes the scaffold simple, convenient, that difficulty of construction is low of scaffold.
Company's joist anchor firmware of a kind of scaffold described in the utility model, comprise the rigid support pipe that dock in the split bolt duct left over wall construction, the end of stay pipe is provided with end casing, bolt runs through whole split bolt duct and whole stay pipe simultaneously, the end of bolt is provided with nut, by screwing nut stay pipe is pressed on the body of wall wall.
Company's joist anchor firmware of a kind of scaffold described in the utility model, its stay pipe that is pressed on the body of wall wall can provide the rigid support to scaffold, the needs of scaffold adopt fastener that transverse tube and stay pipe are linked together, can realize that scaffold is connected with the reliable of body of wall, and can realize the dismounting of scaffold by unclamping fastener.The connection of scaffold and dismantling operation are simple, convenient, difficulty of construction is low.And, by screwing out the nut of bolt end, stay pipe and bolt can be removed from body of wall, thereby also can not be influenced the outward appearance of body of wall.
Stay pipe can be provided with the end casing bigger than the bottom surface of stay pipe with the contact site of body of wall, and the contact area with increase stay pipe and body of wall provides the support to scaffold better, makes stable more, the safety of being connected of scaffold and body of wall.
Description of drawings
Fig. 1 is a pre-buried anchor plate type schematic diagram in the prior art.
Fig. 2 is the attaching anchor slab schematic diagram that available technology adopting split bolt and anchor slab are formed.
Fig. 3 is for having the stay pipe sectional view of end casing in the anchoring piece described in the utility model.
Fig. 4, Fig. 5 are the utility model anchoring piece structure chart.
Fig. 6 scaffolds erecting and the anchoring piece connection diagram for bilateral.
Fig. 7 is one-sided scaffolding erecting and the anchoring piece connection diagram.
The specific embodiment
Extremely shown in Figure 7 as Fig. 3, company's joist anchor firmware of a kind of scaffold described in the utility model, comprise the rigid support pipe 1 that dock in the split bolt duct left over wall construction, the end of stay pipe 1 is welded with end casing 2, bolt 3 runs through whole split bolt duct and whole stay pipe 1 simultaneously, the end of bolt 3 is provided with nut 4, by screwing nut 4 stay pipe 1 is pressed on body of wall 5 walls.
As shown in Figure 6 and Figure 7, according to the building needs, select one-sided scaffold erecting or bilateral scaffolds erecting.During construction, the split bolt hole of leaving over when bolt 3 is passed wall construction, and on bolt 3, put stay pipe 1, fastening nut 4 is so that stay pipe 1 is pressed on body of wall 5 walls.After anchoring piece installs, transverse tube on the scaffold 7 and stay pipe 1 are linked together, can provide rigid support, can realize that scaffold is connected with the reliable of body of wall scaffold owing to be pressed on the stay pipe 1 of body of wall wall by fastener 6.Construction finishes, and when removing scaffold, only need unclamp the dismounting that fastener 6 just can be realized scaffold, and the connection of scaffold and dismantling operation are simple, convenient, difficulty of construction is low.And, by screwing out the nut 4 of bolt 3 ends, stay pipe 1 and bolt 3 can be removed from body of wall, thereby also can not be influenced the outward appearance of body of wall.
The transverse tube 7 of scaffold is connected on the stay pipe 1 by one or more fasteners 6; Transverse tube 7 can be connected the upper-lower position of stay pipe 1 or position, the left and right sides etc.; Described end casing 2 is square shape, toroidal or triangle etc.; The material of stay pipe 1 should be consistent with the steel pipe of scaffold with specification.
Stay pipe 1 two ends all are provided with end casing 2, wherein stay pipe 1 can be provided with the end casing 2 bigger than the bottom surface of stay pipe 1 with the contact site of body of wall 5, to increase the contact area of stay pipe 1 and body of wall 5, support to scaffold is provided better, makes stable more, the safety of being connected of scaffold and body of wall.

Claims (7)

1. company's joist anchor firmware of a scaffold, it is characterized in that: comprise the rigid support pipe (1) that dock in the split bolt duct left over wall construction, the end of stay pipe (1) is provided with end casing (2), bolt (3) runs through whole split bolt duct and whole stay pipe (1) simultaneously, the end of bolt (3) is provided with nut (4), by screwing nut (4) stay pipe (1) is pressed on body of wall (5) wall.
2. company's joist anchor firmware of a kind of scaffold according to claim 1, it is characterized in that: the transverse tube of scaffold (7) is connected on the stay pipe (1) by one or more fasteners (6).
3. company's joist anchor firmware of a kind of scaffold according to claim 2, it is characterized in that: transverse tube (7) is connected the upper-lower position or the position, the left and right sides of stay pipe (1).
4. company's joist anchor firmware of a kind of scaffold according to claim 1, it is characterized in that: stay pipe (1) two ends all are provided with end casing (2).
5. company's joist anchor firmware of a kind of scaffold according to claim 1 is characterized in that: the end casing (2) that the contact site of stay pipe (1) and body of wall (5) is provided with is bigger than the bottom surface of stay pipe (1).
6. company's joist anchor firmware of a kind of scaffold according to claim 1, it is characterized in that: end casing (2) is square shape, toroidal or triangle.
7. company's joist anchor firmware of a kind of scaffold according to claim 1, it is characterized in that: the material of stay pipe (1) should be consistent with the steel pipe of scaffold with specification.
CN 201220666158 2012-12-06 2012-12-06 Wall-connecting anchoring part for scaffolds Expired - Lifetime CN203097257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220666158 CN203097257U (en) 2012-12-06 2012-12-06 Wall-connecting anchoring part for scaffolds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220666158 CN203097257U (en) 2012-12-06 2012-12-06 Wall-connecting anchoring part for scaffolds

Publications (1)

Publication Number Publication Date
CN203097257U true CN203097257U (en) 2013-07-31

Family

ID=48848669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220666158 Expired - Lifetime CN203097257U (en) 2012-12-06 2012-12-06 Wall-connecting anchoring part for scaffolds

Country Status (1)

Country Link
CN (1) CN203097257U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437459A (en) * 2013-09-11 2013-12-11 中建新疆建工集团第五建筑工程有限公司 Through-wall opposite-pulling screw sleeve wall-connecting element

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437459A (en) * 2013-09-11 2013-12-11 中建新疆建工集团第五建筑工程有限公司 Through-wall opposite-pulling screw sleeve wall-connecting element

Similar Documents

Publication Publication Date Title
CN202577934U (en) Screw thread wall-connection member of scaffold and building
CN202658873U (en) Upward pulling cantilever heavy frame of scaffolding
CN201416263Y (en) Disc bolt type scaffold
CN202124933U (en) Connecting structure for steel bar truss floor deck and concrete wall column
CN203097257U (en) Wall-connecting anchoring part for scaffolds
CN202064635U (en) Formwork forming fastener
CN203795825U (en) Scaffold and wall connector and scaffold and wall connecting structure
CN205116231U (en) Independent strutting arrangement in basement post -cast strip
CN204139631U (en) The guard rail of building site fast demountable
CN203113761U (en) Wall connection structure of scaffold
CN203654717U (en) Fastener structure, fastener and door-shaped reinforcing frame for round steel pipe
CN203834906U (en) Triangular operation platform used for capital construction slope face
CN215167928U (en) Detachable scaffold wall connecting system and wall connecting mechanism
CN2916015Y (en) Scaffolding with cone-shaped plug
CN203547114U (en) Wall connecting assembly
CN103276889B (en) Full hall fastener type steel pipe scaffold anti-side shifting method
CN203603450U (en) Clamping slot type steel pipe scaffold
CN201991203U (en) Scaffold
CN203129565U (en) Floor connecting device of external scaffolding rigid wall connecting piece
CN216810912U (en) I-steel anchor clamps and I-steel connection structure
CN104234189A (en) Four-pipe truss structure of prefabricated house
CN205654083U (en) Can have enough to meet need pin joint formula lattice column of use
CN214785738U (en) Single-row quick-release scaffold
CN204174900U (en) Building scaffold
CN217076777U (en) Tower crane attachment system for frame structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU

CP01 Change in the name or title of a patent holder

Address after: 510735 Whampoa, Guangzhou, Whampoa District, No. 3375 East Road, Guangdong

Patentee after: GUANGDONG ELECTRIC POWER ENGINEERING BUREAU CO.,LTD. OF CHINA ENERGY ENGINEERING Corp.,Ltd.

Address before: 510735 Whampoa, Guangzhou, Whampoa District, No. 3375 East Road, Guangdong

Patentee before: CEEC Guangdong Electric Power First Engineering Bureau

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130731