The cleaning framework structure
Technical field
The utility model belongs to the cleaning technique field that equipment such as electric power, environmental protection, the energy, colliery are used, and is a kind of cleaning framework structure specifically, is mainly used in the cleaning of power station indirect air cooling unit.
Background technology
At present, the A type island that is used for power station Hai Leshi indirect air cooling unit is and is arranged vertically, and mainly is made of injection type condenser and cooling tower that good fortune brother type radiator is housed.Be used for method that the dust and dirt that the surface of fin in the A type island cooling triangle is gathered is cleaned, mainly contain tower and clean cleaning in (cleaning device is arranged on the cooling tower outside, near indirect air cooling unit A type island) and the tower (cleaning device is arranged on the inner A type island near the indirect air cooling unit of cooling tower) outward.
Wherein the tube bank of the outer cleaning device of tower protrudes into and puts in the formula cleaning in the cooling triangle, as publication number is CN 101814801A " double-faced interior cleaning device for vertical arrangement air-cooling generating unit radiators ", it comprises the frame that is arranged on the guide rail, frame is provided with spraying-water dolly, be provided with between frame and the spraying-water dolly and can drive the lift drive mechanism of spraying water and moving on the finger direction being, spraying-water dolly is provided with the hydro-peening pipe support that can clean two sides of two adjacent fins triangle simultaneously, is provided with between spraying-water dolly and the hydro-peening framework can drive the swing of hydro-peening pipe support and make the rotary drive mechanism that the hydro-peening pipe support cleans two sides of two adjacent fins triangle or the hydro-peening pipe support can not cause interference with the fin triangle when frame is mobile on horizontal plane.Following point appears in this device easily when practical operation: water spray pipe support supply channel structure does not meet fluidics, easily produce turbulent flow and cause nozzle hydraulic pressure uneven and, cause cleaning efficiency low.In addition, the corner solder place pressurized of pipeline is higher fragile, has improved maintenance cost.Need badly for this reason existing cleaning device is improved.
Summary of the invention
The purpose of this utility model provides a kind of cleaning framework structure, problems such as the cleaning structure cleaning performance that has power station indirect air cooling unit now is poor to solve, maintenance cost height.
The purpose of this utility model is achieved in that it comprises the cleaning tube bank that is arranged on frame structure vertically mobile on the vertical truss and fixes with frame structure, clean tube bank and comprise water inlet pipe, distributor pipe and sparge pipe, it is characterized in that: described distributor pipe comprises distributor pipe and the outer distributor pipe of water outlet in water inlet distribution pipe, the water outlet; Water inlet distribution pipe links to each other with water inlet pipe by elbow or elbow threeway; Water inlet distribution pipe links to each other with distributor pipe in the water outlet by the elbow threeway; Distributor pipe links to each other with the outer distributor pipe of water outlet by " Y type " threeway or elbow threeway in the water outlet; The outer distributor pipe of water outlet is " A type " structure, and " A type " structure both sides are provided with some shower nozzles; " A type " structure end is provided with end socket.
Described water inlet pipe water inlet end is provided with swivel joint.
Described shower nozzle comprises and is arranged on " A type " structural nozzle carrier and is arranged on fan nozzle on the nozzle carrier.
The outer distributor pipe top of described water outlet angle is 45 ° ~ 50 °.
Advantage of the present utility model and beneficial effect are as follows: original threeway is replaced with the elbow threeway, reduced the impact of the interior torrent of water inlet distribution pipe and water inlet pipe to the distributor pipe joint; After using the elbow threeway instead, the inflow of two water inlet distribution pipe is more evenly distributed; Meet hydromechanical water spray tube bank design by employing, avoided turbulent generation, make nozzle hydraulic pressure better evenly constant; Distributor pipe links to each other with the outer distributor pipe of water outlet by " Y type " threeway or elbow threeway in the water outlet, has further stablized nozzle hydraulic pressure; By limiting the angular range of " A " type sparge pipe, further improved the stability of current, improved cleaning efficiency.
Description of drawings
Below in conjunction with accompanying drawing the utility model is described in further detail.
Fig. 1 is a structural representation sketch of the present utility model;
Fig. 2 is a partial enlarged drawing.
The symbol description of accompanying drawing major part: distributor pipe, 7 nozzle carriers, the outer distributor pipe of 8 water outlets, 9 fan nozzles, 10 " Y type " threeway, 11 end sockets, 12 connecting plates in 1 swivel joint, 2 elbow threeways, 3 water inlet pipes, 4 elbows, 5 water inlet distribution pipe, 6 water outlets.
Below in conjunction with accompanying drawing and by example utility model is described in further detail; but following example only is the utility model example wherein; the rights protection scope of not representing the utility model and being limited, rights protection scope of the present utility model is as the criterion with claim.
The specific embodiment
According to Fig. 1 and Fig. 2 the utility model is described in detail.A kind of cleaning framework structure of the present utility model, it comprises the cleaning tube bank that is arranged on frame structure (not shown) vertically mobile on the vertical truss and fixes with frame structure, cleaning is restrained and is fixed on the frame structure by connecting plate 12.Clean tube bank and comprise that water inlet pipe, distributor pipe and sparge pipe, this distributor pipe comprise distributor pipe 6 and the outer distributor pipe 8 of water outlet in water inlet distribution pipe 5, the water outlet.Water inlet distribution pipe 5 is two water inlet pipes parallel to each other, and it links to each other with water inlet pipe 3 with elbow threeway 2 by elbow 4.Distributor pipe 6 is " worker " type in the water outlet, and water inlet distribution pipe 5 links to each other with the bottom transverse tube of distributor pipe 6 in the water outlet by the elbow threeway.Distributor pipe 6 two ends link to each other with the outer distributor pipe 8 of elbow threeway and water outlet by " Y type " threeway 10 in the water outlet; The outer distributor pipe 8 of water outlet is " A type " structure, and the angle at A type top is 46.2 °." A type " structure both sides are provided with some shower nozzles, and shower nozzle comprises and is arranged on " A type " structural nozzle carrier 9 and is arranged on fan nozzle 9 on the nozzle carrier." A type " structure end is provided with end socket 11.Move into the axle rotation of water pipe place for ease of wiper mechanism, be provided with swivel joint 1 at water inlet pipe 3 water inlet ends.