- Publication number
- CN203070123U CN203070123U CN 201220740703 CN201220740703U CN203070123U CN 203070123 U CN203070123 U CN 203070123U CN 201220740703 CN201220740703 CN 201220740703 CN 201220740703 U CN201220740703 U CN 201220740703U CN 203070123 U CN203070123 U CN 203070123U
- Authority
- CN
- China
- Prior art keywords
- humidity
- humidity control
- liquid line
- control module
- gas piping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Air Humidification (AREA)
Abstract
The utility model provides a humidity control device of a test room. The humidity control device of the test room comprises a humidity sensor, a humidity control module, a liquid pipeline, a gas pipeline and a nozzle, wherein a water pump is arranged at an initiating end of the liquid pipeline, an air compressor is arranged at an initiating end of the gas pipeline, the nozzle is arranged at the intersection position of the liquid pipeline and the gas pipeline, the humidity control module is connected with the humidity sensor, and the humidity control module is in connection with magnetic valves of the liquid pipeline and the gas pipeline. When a humidity signal sent by the humidity sensor is smaller than or larger than a set value of the humidity control module, the humidity control module controls opening or closing of the magnetic valves of the liquid pipeline and the gas pipeline, liquid and gas are controlled to flow to the intersection position, and finally the nozzle carries out mist spraying. The humidity control device of the test room has the beneficial effects that through the adoption of the technical solution, humidity adjustment is more uniform, and area controlled by humidity is increased. The humidity control device of the test room has the advantages of simple structure, convenient maintenance, low processing cost, high humidification efficiency and the like.
Description
Technical field
The utility model relates to a kind of moisture control unit field of air, especially relates to a kind of humidity conditioner of testing laboratory.
Background technology
In existing technology, in the general laboratory, carry out in the environment that a lot of tests need be controlled humidity.In a single day generally the simulation use uses humidifier to carry out humidification in confined space in the laboratory, but has arrived in the larger area laboratory, the humidification ability of common humidifier obviously can not meet the demands.Exist humidity can't reach requirement, and humidity is controlled technical matterss such as inhomogeneous.
Summary of the invention
Problem to be solved in the utility model provides a kind of humidity conditioner of testing laboratory.
For solving the problems of the technologies described above, the technical solution adopted in the utility model comprises: humidity sensor, humidity control module, liquid line, gas piping and nozzle, the initiating terminal of liquid line is provided with water pump, the initiating terminal of gas piping is provided with air compressor, and the intersection of liquid line and gas piping is provided with nozzle; Humidity control module is connected with humidity sensor; Humidity control module is connected with the solenoid valve of liquid line, gas piping respectively, when the moisture signal of humidity sensor transmission is below or above the setting value of humidity control module, humidity control module is opened or closing control the solenoid valve of liquid line, gas piping, the control liquids and gases flow to intersection, finally arrive nozzle and spray.
Further, described liquid line and gas piping arrange filtration unit, and the filtration unit of liquid line is arranged between water pump and the nozzle; The filtration unit of gas piping is arranged between air compressor and the nozzle.
Further, described liquid line and gas piping are provided with one or more in pressure governor, tensimeter, retaining valve, solenoid valve, the hand valve
Further, described humidity sensor is not less than one.
Further, the intersection of liquid line and gas piping is not less than one, and nozzle is not less than one.
Further, import hot water in the described liquid line.
Further, described gas piping also comprises gas-holder, and the endpiece of air compressor is connected with the inlet end of gas-holder.
Further, humidity control module is PLC.
Advantage and the good effect that the utlity model has are: owing to adopt technique scheme, humidity regulation is more even, and the area of humidity control increases; Have simple in structurely, easy to maintenance, processing cost is low, the humidification efficiency advantages of higher.
Description of drawings
Fig. 1 is structural representation of the present utility model
Among the figure:
1, water pump 2, air compressor 3, gas-holder
4, filtration unit 5, tensimeter 6, pressure governor
7, solenoid valve 8, PLC 9, nozzle
Embodiment
As shown in Figure 1, the utility model comprises: humidity sensor, humidity control module, liquid line, gas piping and nozzle 9, humidity control module is PLC8.The initiating terminal of liquid line is provided with water pump 1, and the initiating terminal of gas piping is provided with air compressor 2, and the intersection of liquid line and gas piping is provided with nozzle 9; PLC8 is connected with humidity sensor; PLC8 is connected with the solenoid valve 7 of liquid line, gas piping respectively, when the moisture signal of humidity sensor transmission is below or above the setting value of PLC8, the solenoid valve 7 of the liquid line of PLC8, gas piping is opened or closing control, the control liquids and gases flow to intersection, finally arrive nozzle 9 and spray.Described liquid line and gas piping arrange filtration unit 4, and the filtration unit 4 of liquid line is arranged between water pump 1 and the nozzle 9; The filtration unit 4 of gas piping is arranged between air compressor 2 and the nozzle 9.One or more described humidity sensors that described liquid line and gas piping are provided with in pressure governor 6, tensimeter 5, retaining valve, solenoid valve 7, the hand valve are not less than one.The intersection of liquid line and gas piping is not less than one, and nozzle 9 is not less than one.Import hot water in the described liquid line.Described gas piping also comprises gas-holder 3, and the endpiece of air compressor 2 is connected with the inlet end of gas-holder 3.
The course of work of this example: at first open water pump 1 and air compressor 2, the state of keep that liquid line can supply water at any time, gas piping at any time can air feed.Water filters impurity through filtration unit 4, can see the numerical value of hydraulic pressure by water pressure gauge, if numerical value does not meet request for utilization, then regulates by pressure governor 6.Air filters impurity through filtration unit 4, if air pressure does not meet request for utilization, then regulates by pressure governor 6.When the moisture signal of humidity sensor transmission was lower than the setting range of PLC8, the solenoid valve 7 of the liquid line of PLC8, gas piping was opened operation, makes liquids and gases flow to intersection, finally arrived nozzle 9 and sprayed.When the moisture signal of humidity sensor transmission was higher than the setting range of PLC8, the solenoid valve 7 of the liquid line of PLC8, gas piping carried out shutoff operation, and the control liquids and gases stop to flow, and final spraying stops.
More than an embodiment of the present utility model is had been described in detail, but described content only is preferred embodiment of the present utility model, can not be considered to for limiting practical range of the present utility model.All equalizations of doing according to the utility model application range change and improve etc., all should still belong within the patent covering scope of the present utility model.
Claims (8)
1. the humidity conditioner of a testing laboratory, it is characterized in that: comprise humidity sensor, humidity control module, liquid line, gas piping and nozzle, the initiating terminal of liquid line is provided with water pump, the initiating terminal of gas piping is provided with air compressor, and the intersection of liquid line and gas piping is provided with nozzle; Humidity control module is connected with humidity sensor; Humidity control module is connected with the solenoid valve of liquid line, gas piping respectively, when the moisture signal of humidity sensor transmission is below or above the setting value of humidity control module, humidity control module is opened or closing control the solenoid valve of liquid line, gas piping, the control liquids and gases flow to intersection, finally arrive nozzle and spray.
2. the humidity conditioner of testing laboratory according to claim 1, it is characterized in that: described liquid line and gas piping arrange filtration unit, and the filtration unit of liquid line is arranged between water pump and the nozzle; The filtration unit of gas piping is arranged between air compressor and the nozzle.
3. the humidity conditioner of testing laboratory according to claim 1, it is characterized in that: described liquid line and gas piping are provided with one or more in pressure governor, tensimeter, retaining valve, solenoid valve, the hand valve.
4. the humidity conditioner of testing laboratory according to claim 1, it is characterized in that: described humidity sensor is not less than one.
5. the humidity conditioner of testing laboratory according to claim 1, it is characterized in that: the intersection of liquid line and gas piping is not less than one, and nozzle is not less than one.
6. the humidity conditioner of testing laboratory according to claim 1 is characterized in that: import hot water in the described liquid line.
7. the humidity conditioner of testing laboratory according to claim 1, it is characterized in that: described gas piping also comprises gas-holder, the endpiece of air compressor is connected with the inlet end of gas-holder.
8. the humidity conditioner of testing laboratory according to claim 1, it is characterized in that: humidity control module is PLC.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220740703 CN203070123U (en) | 2012-12-27 | 2012-12-27 | Humidity control device of test room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220740703 CN203070123U (en) | 2012-12-27 | 2012-12-27 | Humidity control device of test room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203070123U true CN203070123U (en) | 2013-07-17 |
Family
ID=48768891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220740703 Expired - Fee Related CN203070123U (en) | 2012-12-27 | 2012-12-27 | Humidity control device of test room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203070123U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109669490A (en) * | 2013-12-16 | 2019-04-23 | 3M创新有限公司 | System and method for controlling humidity |
-
2012
- 2012-12-27 CN CN 201220740703 patent/CN203070123U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109669490A (en) * | 2013-12-16 | 2019-04-23 | 3M创新有限公司 | System and method for controlling humidity |
US10967087B2 (en) | 2013-12-16 | 2021-04-06 | 3M Innovative Properties Company | Sterilizer with a humidity control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201637554U (en) | Leakage testing system for pressure reducing valve | |
CN202493900U (en) | Pressure flow regulation device | |
EP2884252A3 (en) | Manifold assembly for a portable leak tester | |
CN102107150B (en) | Combined bin system used for environmental simulation | |
CN203070123U (en) | Humidity control device of test room | |
CN103064441A (en) | Humidity control device of test room | |
CN203979866U (en) | A kind of compressed air reservoir self-draining arrangement | |
CN201650504U (en) | Compressed natural gas spray rail for automobile | |
CN202252858U (en) | Gas pressure adjusting metering cabinet | |
EP4303419A3 (en) | Systems and methods for bleed valve control in fuel systems | |
WO2022223057A3 (en) | Intelligent operation and maintenance test platform for accelerated failure excitation of industrial sensor | |
CN209519561U (en) | Plateau type oxygenerator | |
CN204326170U (en) | A kind of bidirectional compensating formula totally-enclosed non-negative pressure water-supply installation | |
CN211260371U (en) | Pressure regulating metering device capable of automatically switching under different working conditions | |
CN203132801U (en) | Enclosed space leakage detector | |
CN203458956U (en) | Pneumatic spray device | |
CN207936389U (en) | A kind of use for laboratory pressure atomization system for high | |
CN202040543U (en) | Self-pressurizing device with emergency pipeline for natural gas high-pressure regulator | |
CN204848863U (en) | Bacterial expands banks up container air feeder with earth | |
CN206724310U (en) | A kind of air-conditioning system | |
CN203285707U (en) | Device used for seal switching among multiple draught fans in induced draught system | |
CN205374193U (en) | Gas circulation fatigue performance testing arrangement | |
CN202303785U (en) | Automatic steam humidification system for combined air conditioner | |
CN203657608U (en) | Air compression pressure switching regulating device for DTY (draw textured yarn) texturing machine | |
CN213777997U (en) | Humidification pipeline of factory building air conditioning water tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130717 Termination date: 20151227 |
|
EXPY | Termination of patent right or utility model |