CN203070055U - Thermal power plant circulating water system - Google Patents

Thermal power plant circulating water system Download PDF

Info

Publication number
CN203070055U
CN203070055U CN2012207402882U CN201220740288U CN203070055U CN 203070055 U CN203070055 U CN 203070055U CN 2012207402882 U CN2012207402882 U CN 2012207402882U CN 201220740288 U CN201220740288 U CN 201220740288U CN 203070055 U CN203070055 U CN 203070055U
Authority
CN
China
Prior art keywords
valve
water
recirculated water
backwater
female
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012207402882U
Other languages
Chinese (zh)
Inventor
万逵芳
卞力律
吴文蔚
陈禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing China Scape Sci & Tech Co Ltd
Original Assignee
Beijing China Scape Sci & Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing China Scape Sci & Tech Co Ltd filed Critical Beijing China Scape Sci & Tech Co Ltd
Priority to CN2012207402882U priority Critical patent/CN203070055U/en
Application granted granted Critical
Publication of CN203070055U publication Critical patent/CN203070055U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/15On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model relates to a thermal power plant circulating water system with a function of recycling waste heat. The thermal power plant circulating water system comprises a first unit and a second unit. The first unit comprises a first cooling tower 1, a first circulating water pump 4, a first condenser 8, an icebreaking pipeline valve 2, a circulating water return water main pipe valve 3, a circulating water pipeline valve 25 and a circulating water supplying main pipe valve 28. The second unit comprises a second cooling tower 11, a second circulating water pump 14, a second condenser 18, a second icebreaking pipeline valve 12, a second circulating water return water main pipe first valve 13 and a second circulating water return water main pipe second valve 29. The thermal power plant circulating water system has the advantages of being simple in structure, flexible and convenient to adjust, good in anti-freezing effect, energy-saving and electricity-saving, and thoroughly solves the problems of safe and stable operation of the existing thermal power plant circulating water system and freezing of the cooling towers and pools.

Description

The circulating-water in thermal power plant system
[technical field]
The utility model belongs to generating set cooling technology field.More specifically, the utility model relates to the circulating-water in thermal power plant system that has function of recovering waste heat.
[background technology]
Along with the enforcement of country about " energy-saving and emission-reduction " and fired power generating unit " go up big press little " policy, be that the concentrated supply of heating in the city system of thermal source is more general in China " three Norths " area to be equipped with the draw gas cogeneration plant of condensing-type unit of good economy performance, big capacity that load performance is strong.And in recent years, cogeneration plant is aided with absorption heat pump and reclaims the recirculated water waste heat, realizes that the transformation of energy efficiency has become irreversible gesture.But the cooling tower that brings thus freezes, heat pump performance guarantees and problem such as recirculated water optimization operation is also more outstanding.
Because winter severe cold phase heat load is big, the steam turbine displacement is considerably less, and cooling tower is crossed the low problem that freezes because of thermal load and perplexed power plant always.Usually cogeneration plant adopts put into operation a water circulating pump even the operation of low speed low discharge at this problem, and cooling tower only adopts inner ring or outer ring operation simultaneously.But behind absorption heat pump recovery section recirculated water waste heat, the cooling tower thermal load is lower, and the cooling tower filler layer freezes and can't avoid.After heat pump reclaimed a unit waste heat fully, the cooling tower filler layer can not freeze because of anhydrous, but freezed and be inevitable in the pond.The power plant that also has adds abat-vent around the cooling tower and realizes cooling tower antifreezing, but causes in the higher period of temperature that the unit back pressure is higher, economy descends.
Another one contradiction is that the height of heat pump outlet circulating water temperature is bigger to heat pump manufacturing cost and performance impact.Cogeneration plant all adopts raising outgoing condensate water method of temperature to guarantee heat pump performance at present.But under separate unit water circulating pump operating condition, heat pump outlet recirculated water can not be higher.Otherwise the steam turbine economy descends more.Concerning the cogeneration plant that is equipped with two identical units, usually as far as possible to having the heating of drawing gas of waste heat recovery unit, to reduce to improve the adverse effect that circulating water temperature brings unit economy more.
Separate unit water circulating pump operation brings the another one problem to be, condenser cooling tube internal cause water velocity is lower and easy fouling influence heat exchange effect and unit economy, and needs adopt the glueballs cleaning relatively frequently.After heat pump was introduced, glueballs cleaning operation and effect may affect adversely, and took all factors into consideration when needing system's design.
And conventional circulating-water in thermal power plant system can't guarantee the outgoing condensate water temperature constant, how to regulate by the circulation design and running, guarantees heat pump entrance circulating water temperature at design level, and is significant equally.
In order to guarantee the security of heat supply, present large-scale cogeneration plant arranges two units usually at least, corresponding two cooling towers.Some power plant freeze for avoiding the cooling tower filler layer, adopt double tower unification operational mode, but the phenomenon that freezes appear in the cooling tower tower basin water that do not move this moment, if ice cube enters the damage that will cause impeller or blade in the ebullator.In addition, after tower basin freezes, when needing, unit can't put into operation fast and directly.And after increasing absorption heat pump recovery recirculated water waste heat, after advancing heat pump, the recirculated water that the direct employing of most power plant will be recovered the waste heat unit returns pond of cooling tower or corresponding water circulating pump inlet duct, comprehensive inadequately to genset and the consideration of source pump operation coupling factor, when heat pump only can reclaim recirculated water fraction waste heat, unit safety operation is constituted a threat to; When heat pump can reclaim most recirculated water waste heat, can't solve the cooling tower filler layer problem that freezes; When heat pump reclaims the recirculated water waste heat fully, can't solve the antifreeze problem of pond of cooling tower of stopping using again.The cogeneration plant that has is in order to solve water tower packing layer and the pond problem that freezes, and the sacrificial section waste heat is specifically designed to antifreezely, causes the waste of the energy.
In addition, during the winter operation, cogeneration plant usually only needs water circulating pump of operation can guarantee that unit works under economic back pressure, when needs carry out increasing a water circulating pump operation when glueballs cleans again to condenser, cleans and becomes a pump operating cycle again after finishing.But the introducing of heat pump is cleaned to condenser ball and to be brought difficulty, perhaps because the cold water in pond enters system and causes heat pump entrance circulating water temperature well below design load, influences heat pump performance even can't normally move.
Therefore, how to realize the utilization each other of resource between unit, design a kind of flexible operation, efficient height, can under various operating modes, guarantee the circulation that has function of recovering waste heat and the operation control method thereof of unit safety operation to have very important meaning again.
[utility model content]
[technical matters that will solve]
The purpose of this utility model provides a kind of circulating-water in thermal power plant system.
[technical scheme]
The utility model is achieved through the following technical solutions.
For realizing described purpose, the technical solution of the utility model provides a kind of have power plant's cooling tower of two above units and the antifreeze solution in pond.
The utility model relates to a kind of circulating-water in thermal power plant system, and this system is made up of first unit and second unit.
First unit is by first cooling tower 1, first water circulating pump 4, first condenser 8, pipeline valve 2 opens ice, the female tube valve 3 of recirculated water backwater, circulating water pipeline valve 25 and recirculated water female tube valve 28 that supplies water is formed, first cooling tower 1 is by first water circulating pump 4, recirculated water the supply water female pipe 5 of female tube valve 28 and recirculated water that supplies water is connected with first condenser 8, first condenser 8 is connected with first cooling tower 1 with the female tube valve 3 of recirculated water backwater by the female pipe 6 of recirculated water backwater again, and the female pipe 6 of recirculated water backwater is being connected by the entrance circulating water pipeline of circulating water pipeline valve 25 with first water circulating pump 4 near the position between the female tube valve 3 of first cooling tower, 1 one ends and recirculated water backwater; Manage 6 and be connected with first cooling tower 1 by the pipeline 7 that opens ice, the pipeline valve 2 that opens ice in that the female tube valve 3 of recirculated water backwater and the recirculated water backwater between the circulating water pipeline valve 25 are female;
Second unit is made up of with female second valve 29 of managing of the second recirculated water backwater open ice pipeline valve 12, the female pipe of the second recirculated water backwater first valve 13 of second cooling tower 11, second water circulating pump 14, second condenser 18, second, second cooling tower 11 is connected with second condenser 18 by supply water female pipe 15 of second water circulating pump 14 and second recirculated water, and second condenser 18 is managed 16 and is connected with second cooling tower 11 by the female pipe of the second recirculated water backwater first valve 13, the female pipe of the second recirculated water backwater second valve 29, the second recirculated water backwater are female again; Manage 16 and be connected with second cooling tower 11 by second pipeline 17, second pipeline valve 12 that opens ice that opens ice in that the female pipe of the second recirculated water backwater first valve 13 and the second recirculated water backwater between the female pipe of the second recirculated water backwater second valve 29 are female;
First cooling tower 1 is connected with second cooling tower 11 by cooling tower connecting pipe 19;
Be communicated with valve 9 and second recirculated water at second water circulating pump, 14 outlet sides by female pipe that supplies water and supply water and femalely manage 15 and be connected at the recirculated water of first water circulating pump, 4 outlet sides female pipe 5 that supplies water; The female pipe 6 of recirculated water backwater is communicated with valve 10 and is connected at the female female pipe 16 of the second recirculated water backwater of managing between second valve 29 of the female pipe of the second recirculated water backwater first valve 13 and the second recirculated water backwater by female pipe of backwater;
Managing 5 with female tube valve 28 that supplies water at recirculated water with recirculated water water supply mother between first condenser 8 by second valve 27 at the female pipe of the second recirculated water backwater second valve 29 and the female pipe 16 of the second recirculated water backwater between second condenser 18 is connected;
Is communicated with at the female pipe of first condenser 8 and backwater that recirculated water backwater between the valve 10 is female manages 6, is connected with heat pump 22 through source heat pump heat water access port by recirculated water booster 20 and first recirculated water valve 21 that boosts; The pipeline that is connected with source heat pump heat water exit is divided into two-way, and one road pipeline is connected by heat pump outlet valve 23 and recirculated water between supply water at recirculated water female tube valve 28 and first condenser 8 female pipe 5 that supplies water; Another road pipeline is managed 16 by the second heat pump outlet valve 24 and the second recirculated water backwater mother between second recirculated water backwater mother pipe first valve 13 and the female pipe of the second recirculated water backwater second valve 29 and is connected.
According to a kind of preferred implementation of the present utility model, in described circulating-water in thermal power plant system, is communicated with at the female pipe of first condenser 8 and backwater that recirculated water backwater between the valve 10 is female manages 6, is connected with heat pump 22 through source heat pump heat water access port by recirculated water booster 20 and first recirculated water valve 21 that boosts; The pipeline that is connected with source heat pump heat water exit is divided into two-way, and one road pipeline is connected by heat pump outlet valve 23 and recirculated water between supply water at recirculated water female tube valve 28 and first condenser 8 female pipe 5 that supplies water; Another road pipeline is managed 16 by the second heat pump outlet valve 24 and the second recirculated water backwater mother between second recirculated water backwater mother pipe first valve 13 and the female pipe of the second recirculated water backwater second valve 29 and is connected.
According to another kind of preferred implementation of the present utility model, described first water circulating pump 4 and second water circulating pump 14 are made up of 1 ~ 4 parallel connection of pumps.
According to another kind of preferred implementation of the present utility model, described recirculated water booster 20 is composed in parallel by 1 ~ 4 forcing pump.
According to another kind of preferred implementation of the present utility model, the female pipe of described water supply is communicated with valve 9, the female pipe of backwater and is communicated with boost valve 21, heat pump outlet valve 23, the second heat pump outlet valve 24 of valve 10, first recirculated water and is composed in parallel by 1 ~ 4 valve
According to another kind of preferred implementation of the present utility model, when this system was made up of many units, wherein any two units can both connect according to circulating-water in thermal power plant described in the utility model system connected mode.
Concrete technical scheme of the present utility model is that the female pipe of recirculated water water supply of power plant's two units wherein and the female pipe of recirculated water backwater are connected by pipeline and valve respectively.Wherein a unit condenser exit portion or whole recirculated water enter heat pump and are recovered waste heat after the recirculated water booster boosts, heat pump outlet side circulation moisture two-way: the one tunnel inserts this unit condenser female pipe that supplies water behind valve, and access point is in two unit recirculated waters female tube contact valve downstream that supplies water; Another unit condenser recirculated water water return pipeline is incorporated on another road into behind control valve.The pond of cooling tower of two units is by the mutual UNICOM of pipeline.
The use step of described circulating-water in thermal power plant system is as follows:
The recirculated water of first unit comes out to be heated along recirculated water female pipe 5 water side spaces that enter first condenser 8 of supplying water by first water circulating pump 4 back of boosting from first cooling tower 1, rise to the packing layer of first cooling tower 1 then through the female tube valve 3 of recirculated water backwater along the female pipe 6 of recirculated water backwater, its recirculated water is cooled off by surrounding air in the process that falls to entering tank naturally, and then enter first water circulating pump 4, so move in circles;
The recirculated water of second unit comes out to be heated along recirculated water female pipe 5 water side spaces that enter second condenser 18 of supplying water by second water circulating pump 14 back of boosting from second cooling tower 11, rise to the packing layer of second cooling tower 11 then through the female pipe of the second recirculated water backwater first valve 13 along the female pipe 16 of the second recirculated water backwater, its recirculated water is cooled off by surrounding air in the process that falls to entering tank naturally, and then enter second water circulating pump 14, so move in circles;
In normal circumstances, female pipe that supplies water is communicated with valve 9,10 and closes, the pipeline valve 2 of opening ice on first cooling tower 1 opens ice pipeline 7 is closed with the second pipeline valve valve 12 that opens ice on second cooling tower 11 second opens ice pipeline 17, and the circulation of two units is separate operations.
Stable in order to guarantee first condenser, 8 outlet circulating water temperatures, improve the economy of source pump operation, increase the quantity of circulating water of second condenser 18 simultaneously, reduce its outlet circulating water temperature, improve the economy of second unit, start recirculated water booster 20, open first recirculated water boost valve 21, heat pump outlet valve 23, allow enter heat pump 22 at first condenser 8 and the female recirculated water of managing the female pipe 6 of recirculated water backwater that is communicated with between the valve 10 of backwater, reclaim the waste heat of first unit recirculated water; Simultaneously, close the pipeline valve 2 that opens ice, the second heat pump outlet valve 24, the water yield that enters first cooling tower 1 with change by the aperture of adjusting the female tube valve 3 of recirculated water backwater, adjust the aperture that female pipe that supplies water is communicated with valve 9 simultaneously, allow a part of recirculated water be communicated with valve 9 by female pipe that supplies water and enter second female pipe of unit recirculated water water supply, perhaps
When the aperture of the female tube valve 3 of recirculated water backwater will make first cooling tower 1 freeze, then the female tube valve 3 of recirculated water backwater is closed fully, increase the second heat pump outlet valve, 24 apertures, be open at the pipeline valve 2 that opens ice on the pipeline 7 that opens ice simultaneously, stable to reach first condenser 8 outlet circulating water temperatures, and prevent that first cooling tower, 1 pond from freezing.
The heating amount of drawing gas is big in the winter time, displacement after a little while, allow first water circulating pump 4 move, second water circulating pump 14 is stopped transport, open second valve 27, heat pump exports second valve 23 and is communicated with valve 9 with the female pipe of recirculated water water supply, close the female tube valve 3 of recirculated water backwater, circulating water pipeline valve 25, the recirculated water female pipe of female tube valve 28 and the second recirculated water backwater second valve 29 that supplies water, make second condenser, 18 outlet recirculated waters enter first condenser 8, a part of recirculated water is got back to the female pipe 5 of recirculated water water supply after recirculated water booster 20 enters heat pump 22 then, and control valve 24 makes a part of recirculated water that comes out from heat pump 22 enter the female pipe 16 of the second recirculated water backwater as required, keeps first condenser, 8 outlet circulating water temperatures and satisfies heat pump 22 design parameter requirements; Another part recirculated water of first condenser, 8 outlets is communicated with valve 10 through the female pipe of backwater and directly enters the female pipe 16 of the second recirculated water backwater, enter second cooling tower (11) then, thereby realize the series operation of two unit condenser circulations, reach the electricity consumption of economized cycle water pump, can avoid first condenser 8 and second condenser 18 to influence the purpose of unit performance because of fouling again simultaneously; At this moment, part is opened the pipeline valve 2 that opens ice, and makes part recirculated water enter the pond, freezes to prevent first cooling tower, 1 pond.
When room temperature is lower than-10 ℃, when heat pump 22 reclaims the whole recirculated water waste heat of first unit, boost valve 21, heat pump outlet valve 23 of first recirculated water opened fully, the second heat pump outlet valve 24 is closed fully, and the female pipe of open ice pipeline valve 2 and backwater is communicated with valve 10 and opens a little, it is antifreeze both can to enter first cooling tower, 1 pond by the pipeline valve 2 that opens ice by the female recirculated water of managing second unit that is communicated with valve 10 of backwater, can enter the source heat pump heat water system by recirculated water booster 20 again, the potential safety hazard that anti-locking system brings because of leakage; Perhaps
When room temperature is lower than-10 ℃, when heat pump 22 reclaims whole recirculated water waste heat, for to save electricity consumption, open female pipe that supplies water and be communicated with valve 9, allow first water circulating pump 4 move, second water circulating pump 14 is stopped transport, and the warm water second cooling tower, 11 ponds in plays antifreeze effect by cooling tower connecting pipe 19 first cooling tower, 1 pond of flowing through, and also is communicated with valve 9 by first water circulating pump 4 by female pipe that supplies water simultaneously and delivers to second unit second recirculated water and supply water and femalely manage 15; At this moment, the female pipe of backwater is communicated with valve 10 still to be opened a little, and a small amount of warm water in the female pipe 16 of the second recirculated water backwater is flowed in the female pipe 6 of the first recirculated water backwater by valve 10, reveals the potential safety hazard of bringing in order to prevent heat pump 22 circulations.Simultaneously, the pipeline valve 2 that opens ice is opened, and makes the part warm water that is communicated with valve 10 through the female pipe of backwater enter first cooling tower, 1 pond, prevents pond partial freezing.
When first condenser 8 needs to clean, start second water circulating pump 14, open the female pipe of the second recirculated water backwater first valve 13, first recirculated water valve 21 that boosts, heat pump outlet valve 23, circulating water pipeline valve 25, recirculated water female tube valve 28 that supplies water, the female pipe of the second recirculated water backwater second valve 29, close the pipeline valve 2 that opens ice, the female tube valve 3 of recirculated water backwater, the female pipe of recirculated water water supply is communicated with valve 9, the female pipe of recirculated water backwater is communicated with valve 10, second cooling tower pipeline valve 12 that opens ice, second valve 27, first water circulating pump 4 and recirculated water booster 20 keep running status, adjust the aperture of valve 24 simultaneously, keep heat pump 22 entrance circulating water temperatures near design load.Can carry out glueballs to condenser 8 this moment cleans.After condenser 8 cleans and finishes, can keep the current state operation, also can regulate accordingly according to foregoing method.
Under two unit condenser circulation series operation patterns, first condenser 8 can directly carry out glueballs and clean, and does not need other operation; Second condenser 18 carries out glueballs when cleaning, and second unit need be withdrawed from the series operation pattern earlier, treat second condenser 18 clean separately finish after, switch to the series operation pattern again.
[beneficial effect]
The beneficial effects of the utility model: native system have simple in structure, regulate reliably various, good freezing protection effect and have energy-conservation electricity saving function characteristics concurrently of flexible, control method, thoroughly solved the safe and stable operation of the circulating-water in thermal power plant system that has function of recovering waste heat at present and cooling tower and the pond problem that freezes, regulate by system optimized operation simultaneously, generated energy and amount of electricity saving that Power Plant increases are enough to overcome because the power consumption that heat pump increases is set, and the economy of entire power plant improves.
[description of drawings]
Fig. 1 is a kind of circulating-water in thermal power plant of the present utility model system.
Fig. 2 is another kind of circulating-water in thermal power plant of the present utility model system.
1, first cooling tower; 2, the pipeline valve that opens ice; 3, the female tube valve of recirculated water backwater; 4, first water circulating pump; 5, the female pipe of recirculated water water supply; 6, the female pipe of recirculated water backwater; 7, the pipeline that opens ice; 8, first condenser; 9, the female pipe of water supply is communicated with valve; 10, the female pipe of backwater is communicated with valve; 11, second cooling tower; 12, second pipeline valve that opens ice; 13, the female pipe of the second recirculated water backwater first valve; 14, second water circulating pump; 15, the female pipe of second recirculated water water supply; 16, the female pipe of the second recirculated water backwater; 17, second pipeline that opens ice; 18, second condenser; 19, cooling tower connecting pipe; 20, recirculated water booster; 21, first recirculated water valve that boosts; 22, heat pump; 23, heat pump outlet valve; 24, the second heat pump outlet valve; 25, circulating water pipeline valve; 27, second valve; 28, recirculated water female tube valve that supplies water; 29, the female pipe of the second recirculated water backwater second valve.
[embodiment]
Can understand spirit of the present utility model better by following embodiment.
Embodiment 1: the circulating-water in thermal power plant system
This circulating-water in thermal power plant system is made up of first unit and second unit.
This circulating-water in thermal power plant system is composed as follows:
First unit is by first cooling tower 1, first water circulating pump 4, first condenser 8, pipeline valve 2 opens ice, the female tube valve 3 of recirculated water backwater, circulating water pipeline valve 25 and recirculated water female tube valve 28 that supplies water is formed, first cooling tower 1 is by first water circulating pump 4, recirculated water the supply water female pipe 5 of female tube valve 28 and recirculated water that supplies water is connected with first condenser 8, first condenser 8 is connected with first cooling tower 1 with the female tube valve 3 of recirculated water backwater by the female pipe 6 of recirculated water backwater again, and the female pipe 6 of recirculated water backwater is being connected by the entrance circulating water pipeline of circulating water pipeline valve 25 with first water circulating pump 4 near the position between the female tube valve 3 of first cooling tower, 1 one ends and recirculated water backwater; Manage 6 and be connected with first cooling tower 1 by the pipeline 7 that opens ice, the pipeline valve 2 that opens ice in that the female tube valve 3 of recirculated water backwater and the recirculated water backwater between the circulating water pipeline valve 25 are female;
Second unit is made up of with female second valve 29 of managing of the second recirculated water backwater open ice pipeline valve 12, the female pipe of the second recirculated water backwater first valve 13 of second cooling tower 11, second water circulating pump 14, second condenser 18, second, second cooling tower 11 is connected with second condenser 18 by supply water female pipe 15 of second water circulating pump 14 and second recirculated water, and second condenser 18 is managed 16 and is connected with second cooling tower 11 by the female pipe of the second recirculated water backwater first valve 13, the female pipe of the second recirculated water backwater second valve 29, the second recirculated water backwater are female again; Manage 16 and be connected with second cooling tower 11 by second pipeline 17, second pipeline valve 12 that opens ice that opens ice in that the female pipe of the second recirculated water backwater first valve 13 and the second recirculated water backwater between the female pipe of the second recirculated water backwater second valve 29 are female;
First cooling tower 1 is connected with second cooling tower 11 by cooling tower connecting pipe 19;
Be communicated with valve 9 and second recirculated water at second water circulating pump, 14 outlet sides by female pipe that supplies water and supply water and femalely manage 15 and be connected at the recirculated water of first water circulating pump, 4 outlet sides female pipe 5 that supplies water; The female pipe 6 of recirculated water backwater is communicated with valve 10 and is connected at the female female pipe 16 of the second recirculated water backwater of managing between second valve 29 of the female pipe of the second recirculated water backwater first valve 13 and the second recirculated water backwater by female pipe of backwater;
Managing 5 with female tube valve 28 that supplies water at recirculated water with recirculated water water supply mother between first condenser 8 by second valve 27 at the female pipe of the second recirculated water backwater second valve 29 and the female pipe 16 of the second recirculated water backwater between second condenser 18 is connected;
Is communicated with at the female pipe of first condenser 8 and backwater that recirculated water backwater between the valve 10 is female manages 6, is connected with heat pump 22 through source heat pump heat water access port by recirculated water booster 20 and first recirculated water valve 21 that boosts; The pipeline that is connected with source heat pump heat water exit is divided into two-way, and one road pipeline is connected by heat pump outlet valve 23 and recirculated water between supply water at recirculated water female tube valve 28 and first condenser 8 female pipe 5 that supplies water; Another road pipeline is managed 16 by the second heat pump outlet valve 24 and the second recirculated water backwater mother between second recirculated water backwater mother pipe first valve 13 and the female pipe of the second recirculated water backwater second valve 29 and is connected.
Embodiment 2: the circulating-water in thermal power plant system
This circulating-water in thermal power plant system is made up of first unit and second unit.
This circulating-water in thermal power plant system is composed as follows:
First unit is by first cooling tower 1, first water circulating pump 4, first condenser 8, pipeline valve 2 opens ice, the female tube valve 3 of recirculated water backwater, circulating water pipeline valve 25 and recirculated water female tube valve 28 that supplies water is formed, first cooling tower 1 is by first water circulating pump 4, recirculated water the supply water female pipe 5 of female tube valve 28 and recirculated water that supplies water is connected with first condenser 8, first condenser 8 is connected with first cooling tower 1 with the female tube valve 3 of recirculated water backwater by the female pipe 6 of recirculated water backwater again, and the female pipe 6 of recirculated water backwater is being connected by the entrance circulating water pipeline of circulating water pipeline valve 25 with first water circulating pump 4 near the position between the female tube valve 3 of first cooling tower, 1 one ends and recirculated water backwater; Manage 6 and be connected with first cooling tower 1 by the pipeline 7 that opens ice, the pipeline valve 2 that opens ice in that the female tube valve 3 of recirculated water backwater and the recirculated water backwater between the circulating water pipeline valve 25 are female;
Second unit is made up of with female second valve 29 of managing of the second recirculated water backwater open ice pipeline valve 12, the female pipe of the second recirculated water backwater first valve 13 of second cooling tower 11, second water circulating pump 14, second condenser 18, second, second cooling tower 11 is connected with second condenser 18 by supply water female pipe 15 of second water circulating pump 14 and second recirculated water, and second condenser 18 is managed 16 and is connected with second cooling tower 11 by the female pipe of the second recirculated water backwater first valve 13, the female pipe of the second recirculated water backwater second valve 29, the second recirculated water backwater are female again; Manage 16 and be connected with second cooling tower 11 by second pipeline 17, second pipeline valve 12 that opens ice that opens ice in that the female pipe of the second recirculated water backwater first valve 13 and the second recirculated water backwater between the female pipe of the second recirculated water backwater second valve 29 are female;
First cooling tower 1 is connected with second cooling tower 11 by cooling tower connecting pipe 19;
Be communicated with valve 9 and second recirculated water at second water circulating pump, 14 outlet sides by female pipe that supplies water and supply water and femalely manage 15 and be connected at the recirculated water of first water circulating pump, 4 outlet sides female pipe 5 that supplies water; The female pipe 6 of recirculated water backwater is communicated with valve 10 and is connected at the female female pipe 16 of the second recirculated water backwater of managing between second valve 29 of the female pipe of the second recirculated water backwater first valve 13 and the second recirculated water backwater by female pipe of backwater;
Managing 5 with female tube valve 28 that supplies water at recirculated water with recirculated water water supply mother between first condenser 8 by second valve 27 at the female pipe of the second recirculated water backwater second valve 29 and the female pipe 16 of the second recirculated water backwater between second condenser 18 is connected;
Is communicated with at the female pipe of first condenser 8 and backwater that recirculated water backwater between the valve 10 is female manages 6, is connected with heat pump 22 through source heat pump heat water access port by recirculated water booster 20 and first recirculated water valve 21 that boosts; The pipeline that is connected with source heat pump heat water exit is divided into two-way, and one road pipeline is connected by heat pump outlet valve 23 and recirculated water between supply water at recirculated water female tube valve 28 and first condenser 8 female pipe 5 that supplies water; Another road pipeline is managed 16 by the second heat pump outlet valve 24 and the second recirculated water backwater mother between second recirculated water backwater mother pipe first valve 13 and the female pipe of the second recirculated water backwater second valve 29 and is connected.

Claims (5)

1. circulating-water in thermal power plant system, this system is made up of first unit and second unit, it is characterized in that this system is composed as follows:
First unit is by first cooling tower (1), first water circulating pump (4), first condenser (8), pipeline valve (2) opens ice, the female tube valve (3) of recirculated water backwater, circulating water pipeline valve (25) and the recirculated water female tube valve (28) that supplies water is formed, first cooling tower (1) is by first water circulating pump (4), recirculated water female tube valve (28) and the recirculated water female pipe (5) that supplies water that supplies water is connected with first condenser (8), first condenser (8) is connected with first cooling tower (1) by the female pipe of recirculated water backwater (6) and the female tube valve of recirculated water backwater (3) again, and the female pipe of recirculated water backwater (6) is connected by the entrance circulating water pipeline of circulating water pipeline valve (25) with first water circulating pump (4) with position between recirculated water backwater mother's tube valve (3) at close first cooling tower (1) one end; Be connected with first cooling tower (1) pond by the pipeline that opens ice (7), the pipeline valve that opens ice (2) in female manage (6) of the female tube valve of recirculated water backwater (3) and the recirculated water backwater between the circulating water pipeline valve (25);
Second unit is by second cooling tower (11), second water circulating pump (14), second condenser (18), second pipeline valve (12) that opens ice, the second recirculated water backwater female pipe first valve (13) is formed with the second recirculated water backwater female pipe second valve (29), second cooling tower (11) is connected with second condenser (18) by second water circulating pump (14) and the second recirculated water female pipe of water supply (15), and second condenser (18) is again by female first valve (13) of managing of the second recirculated water backwater, the female pipe of the second recirculated water backwater second valve (29), the female pipe of the second recirculated water backwater (16) is connected with second cooling tower (11); Be connected with second cooling tower (11) pond by second pipeline (17), second pipeline valve (12) that opens ice that opens ice in female manage (16) of the second recirculated water backwater female pipe first valve (13) and the second recirculated water backwater between the second recirculated water backwater female pipe second valve (29);
First cooling tower (1) is connected with second cooling tower (11) by cooling tower connecting pipe (19);
Be communicated with valve (9) and second recirculated water at second water circulating pump (14) the outlet side mother that supplies water by female pipe that supplies water and manage (15) and be connected at the recirculated water of first water circulating pump (4) the outlet side female pipe (5) that supplies water; The female pipe of recirculated water backwater (6) is communicated with valve (10) and is connected at the female female pipe of the second recirculated water backwater (16) of managing between second valve (29) of the second recirculated water backwater female pipe first valve (13) and the second recirculated water backwater by female pipe of backwater;
Be connected with female manage (5) of the recirculated water water supply between first condenser (8) with the female tube valve (28) that supplies water at recirculated water by second valve (27) at the female female pipe of the second recirculated water backwater (16) of managing between second valve (29) and second condenser (18) of the second recirculated water backwater;
Is communicated with female manage (6) of recirculated water backwater between the valve (10) at the female pipe of first condenser (8) and backwater, is connected with heat pump (22) through source heat pump heat water access port by recirculated water booster (20) and first recirculated water valve (21) that boosts; The pipeline that is connected with source heat pump heat water exit is divided into two-way, and one road pipeline is connected with female manage (5) of the recirculated water water supply between first condenser (8) with the female tube valve (28) that supplies water at recirculated water by heat pump outlet valve (23); Another road pipeline is connected by female manage (16) of the second heat pump outlet valve (24) and the second recirculated water backwater between second recirculated water backwater mother's pipe first valve (13) and the second recirculated water backwater female pipe second valve (29).
2. circulating-water in thermal power plant according to claim 1 system, it is characterized in that being communicated with female manage (6) of recirculated water backwater between the valve (10) at the female pipe of first condenser (8) and backwater, be connected with heat pump (22) through source heat pump heat water access port by recirculated water booster (20) and first recirculated water valve (21) that boosts; The pipeline that is connected with source heat pump heat water exit is divided into two-way, and one road pipeline is connected with female manage (5) of the recirculated water water supply between first condenser (8) with the female tube valve (28) that supplies water at recirculated water by heat pump outlet valve (23); Another road pipeline is connected by female manage (16) of the second heat pump outlet valve (24) and the second recirculated water backwater between second recirculated water backwater mother's pipe first valve (13) and the second recirculated water backwater female pipe second valve (29).
3. circulating-water in thermal power plant according to claim 1 and 2 system is characterized in that described first water circulating pump (4) and second water circulating pump (14) be made up of 1~4 parallel connection of pumps.
4. circulating-water in thermal power plant according to claim 1 and 2 system is characterized in that described recirculated water booster (20) is composed in parallel by 1~4 forcing pump.
5. circulating-water in thermal power plant according to claim 1 and 2 system is characterized in that the female pipe of described water supply is communicated with valve (9), the female pipe of backwater and is communicated with boost valve (21), heat pump outlet valve (23), the second heat pump outlet valve (24) of valve (10), first recirculated water and is composed in parallel by 1~4 valve.
CN2012207402882U 2012-12-28 2012-12-28 Thermal power plant circulating water system Withdrawn - After Issue CN203070055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012207402882U CN203070055U (en) 2012-12-28 2012-12-28 Thermal power plant circulating water system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012207402882U CN203070055U (en) 2012-12-28 2012-12-28 Thermal power plant circulating water system

Publications (1)

Publication Number Publication Date
CN203070055U true CN203070055U (en) 2013-07-17

Family

ID=48768823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012207402882U Withdrawn - After Issue CN203070055U (en) 2012-12-28 2012-12-28 Thermal power plant circulating water system

Country Status (1)

Country Link
CN (1) CN203070055U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103034221A (en) * 2012-12-28 2013-04-10 北京华景天润科技有限公司 Thermal power plant circulating water system
CN104776666A (en) * 2015-04-02 2015-07-15 南京祥源动力供应有限公司 Energy-saving and consumption-reducing circulating cooling water supply system
CN106088214A (en) * 2016-08-09 2016-11-09 武汉钢铁股份有限公司 A kind of enlargement method of electric power plant circulating water system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103034221A (en) * 2012-12-28 2013-04-10 北京华景天润科技有限公司 Thermal power plant circulating water system
CN103034221B (en) * 2012-12-28 2014-10-15 北京华景天润科技有限公司 thermal power plant circulating water system
CN104776666A (en) * 2015-04-02 2015-07-15 南京祥源动力供应有限公司 Energy-saving and consumption-reducing circulating cooling water supply system
CN106088214A (en) * 2016-08-09 2016-11-09 武汉钢铁股份有限公司 A kind of enlargement method of electric power plant circulating water system
CN106088214B (en) * 2016-08-09 2019-05-24 武汉钢铁有限公司 A kind of enlargement method of power plant cycle water system

Similar Documents

Publication Publication Date Title
CN1811303A (en) Single-effect heat pump/double-effect cooling absorption set and combined heat, electricity and cold supply system
CN103713607A (en) Circulating water system for thermal power plant and operation method thereof
CN103034221B (en) thermal power plant circulating water system
CN203070055U (en) Thermal power plant circulating water system
CN103423591B (en) A kind of distributed energy utilization system for natural gas filling station and method
CN202561876U (en) Floor-heating constant-temperature system of water heater with air-source heat pump
CN203745866U (en) Thermal power plant circulating water system
CN203549982U (en) Circulating water system of thermal power plant
CN203603989U (en) Combined heating and power system with waste heat recycling function
CN105953289B (en) A kind of heat pump system using latent heat of solidification
CN107421163A (en) Air electric energy twin-stage heating and refrigerating system and heating and refrigerating method
CN203385306U (en) High-back-pressure energy saving system of air cooling unit
CN105910454A (en) Direct high back pressure heat supply system of indirect air cooling unit
CN206724390U (en) The integrated energy system of building field
CN205642062U (en) Direct high back pressure heating system of indirect air cooling unit
CN206338854U (en) A kind of pair of heat pump energy-storage system
CN203615317U (en) Steam waste heat recovery system
CN203704106U (en) Heating heat supply network circulating water heat exchange system
CN202442491U (en) Domestic wastewater waste heat utilization device
CN104930909A (en) Cooling water circulating system
CN219955664U (en) Crude oil heating device of air source heat pump
CN215447481U (en) Waste heat power generation temperature taking device
CN201016064Y (en) Solar heating system of the crude oil storage tank
CN203629135U (en) Heat pump unit for sewage treatment
CN203980399U (en) The hot flusher of a kind of exhaust steam absorption heat pump

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130717

Effective date of abandoning: 20141015

RGAV Abandon patent right to avoid regrant