CN203066983U - 盾构隧道施工环境模拟系统 - Google Patents
盾构隧道施工环境模拟系统 Download PDFInfo
- Publication number
- CN203066983U CN203066983U CN 201320003005 CN201320003005U CN203066983U CN 203066983 U CN203066983 U CN 203066983U CN 201320003005 CN201320003005 CN 201320003005 CN 201320003005 U CN201320003005 U CN 201320003005U CN 203066983 U CN203066983 U CN 203066983U
- Authority
- CN
- China
- Prior art keywords
- foundation trench
- shield tunnel
- tunnel construction
- shield
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
一种盾构隧道施工环境模拟系统,其基槽为长方体状的钢筋混凝土基槽,基槽左、右侧壁的顶部设有槽道,移动式反力架两侧立柱安装于槽道内,移动式反力架下设有多个千斤顶;基槽沿纵向方向被隔墙分割为环境模拟场和始发井,隔墙上开有盾构入口,环境模拟场的左、右侧壁及前壁均安装有固定式反力格架,固定式反力格架上布置多个水平方向的千斤顶,千斤顶的前方设有滑动式挡墙单元,滑动式挡墙单元经滑轨安装于环境模拟场底部;固定式反力格架上的千斤顶和移动式反力架下的千斤顶均与液压加载装置相连。该系统为开放式大空间结构,模拟的地层环境丰富,可进行大尺度相似模型试验,能够有效消除边界效应,更真实反映复杂的盾构隧道施工环境,可靠性好。
Description
技术领域
本实用新型涉及一种盾构隧道施工环境模拟系统。
背景技术
采用盾构隧道施工环境模拟系统进行盾构掘进模型试验,是分析复杂地层环境与盾构隧道施工的相互影响和隧道衬砌结构的力学行为以及盾构隧道病害的产生和发展的一种重要手段。
盾构隧道就是在地层中推进,一边防止土砂崩坍,一边在其内部进行开挖、衬砌作业的一种修建隧道的方法。盾构隧道施工方法通常适用于软弱地层中,其与周围地层环境的相互影响非常大。施工中需根据穿越地层的工程水文地质特点,辅以各种辅助施工措施。盾构既要求承受地层压力,又要保证安全经济地进行隧道掘进。因此,采用盾构隧道施工环境模拟系统模拟地层环境与盾构隧道施工的相互影响以及盾构隧道病害的产生和发展,对盾构隧道的设计和施工提供实验依据,具有十分重要的意义。
现有的盾构隧道施工环境模拟系统并不多,且存在一些不足之处。盾构隧道的施工环境是复杂多变的,常常遇到软弱富水、破碎等地层环境,现有的模拟系统主要采用在模型土箱添加相似材料进行缩小比例的地层环境模拟试验,模型土箱容量小,只能通过更换相似材料来模拟不同的地层环境,能模拟的地层环境简单;无法模拟偏压、高应力场等复杂的地层环境;同时,小容量模型土箱能够模拟的盾构断面形式单一,掘进路线固定,适用面窄;只能用于盾构掘进过程的模拟,忽略了盾尾管片拼装和盾尾脱环、注浆等过程的模拟,没有模拟出完整意义上的掘进全过程。当然,更无法模拟盾构隧道处于复杂三维空间应力形态下的施工过程和配合施工的辅助工法。
实用新型内容
本实用新型的目的是提供一种盾构隧道施工环境模拟系统,该系统能够模拟盾构隧道施工所在的各种复杂地层环境,实现真实地层条件下盾构掘进全过程的模拟,以得出盾构隧道施工与周围地层环境的相互影响和盾构隧道病害的影响因素,为盾构隧道的设计和施工提供更加可靠的试验依据,更好地保证隧道的经济和安全。
本实用新型解决其技术问题,所采用的技术方案是:一种盾构隧道施工环境模拟系统,包括基槽、液压加载装置、控制装置,其特征在于:所述的基槽为长方体状的下沉式钢筋混凝土基槽,基槽左、右侧壁的顶部设有槽道,移动式反力架两侧立柱的脚轮安装于槽道内,移动式反力架下表面设有多个千斤顶。
所述的基槽沿纵向方向被隔墙分割为环境模拟场和始发井,隔墙上开有盾构入口,环境模拟场的左、右侧壁及前壁均安装有固定式反力格架,固定式反力格架上均匀布置多个水平方向的千斤顶,千斤顶的前方设有滑动式挡墙单元,滑动式挡墙单元通过滑轨安装于环境模拟场底部。
所述的固定式反力格架上的千斤顶和移动式反力架下表面的千斤顶均与液压加载装置相连接。
本实用新型的工作过程和原理是:
根据试验需求,在环境模拟场中布置真实地层材料模拟盾构隧道复杂的施工环境,如需模拟盾构隧道近接施工环境,则将预制的既有局部地面和地中建(构)物模型按试验设计埋设在地层相应位置。同时在地层材料中设置土压力盒、应变片、位移传感器、温度传感器等测量元器件。将移动式反力架沿纵向方向调整到加力点位置。控制装置控制液压加载装置按照预定的加载量和加载顺序选择移动式反力架和固定式反力格架上的千斤顶组合出力,以模拟盾构隧道施工环境的初始三维地应力场。再按设定的盾构隧道施工模拟方案,选择相应的盾构机种类和盾构掘进路线开始掘进。
开始掘进后,盾构从始发井出发,经隔墙上的盾构入口进入环境模拟场,完成掘削面开挖、螺旋出土器出土、盾构机推进,管片拼装和盾尾脱环、注浆及辅助工法等掘进全过程的模拟。
掘进过程中,还可对盾构隧道病害进行模拟:管片拼装时,用开裂的管片模拟衬砌裂缝,用管环间横向缝隙模拟管片错台;注浆时,用衬砌后的空洞模拟注浆不密实等。分析其对隧道结构和周围地层环境的影响。
掘进过程中,土压力盒、应变片、位移传感器、温度传感器等测量元器件动态监测相应的数据。
试验完成后,对各阶段测量元器件反馈的数据进行分析和判断,即可得出既定的试验条件下盾构隧道掘进全过程对地层环境的扰动影响和稳定性,以及盾构隧道病害的影响因素,研究分析隧道结构的受力形态和变化,为盾构隧道的设计和施工提供试验依据。
与现有技术相比,本实用新型的有益效果是:
一、环境模拟场为开放式大空间结构,材料容量大,模拟的地层环境丰富,可进行大尺度相似模型试验,能够有效消除边界效应,更真实反映复杂的盾构隧道施工环境,适用面广,可靠性好。
二、通过在环境模拟场中预埋局部地面和地中建(构)物模型,可以模拟盾构隧道真实的近接施工环境,且试验对传感器的质量、尺寸无特别要求,测量方便。
三、在开放式大空间结构的环境模拟场中,通过操作上部的移动式反力架改变竖直方向千斤顶的加力点,再结合选择的固定式反力格架上的千斤顶,及其出力速度和大小的组合,灵活实现地层环境的局部加卸载,完成盾构隧道多种复杂三维地应力场的真实模拟。
四、本环境模拟系统可适用不同断面形式、不同盾构种类和具有特殊功能的盾构机械掘进作业,以及盾构开挖、出土、管片拼装、盾尾脱环、注浆、辅助工法等掘进全过程的模拟。
五、用相似材料模拟盾构隧道施工和运营过程中的病害,分析其对隧道结构和周围地层环境的影响,研究盾构隧道结构的受力性态,结构安全和耐久性,从而更好地保证隧道的安全和经济。
下面结合附图和具体实施方式对本实用新型作进一步的详细说明。
附图说明
图1是本实用新型实施例的俯视结构示意图。
具体实施方式
实施例
图1示出,一种盾构隧道施工环境模拟系统,包括基槽1、液压加载装置2、控制装置,其特征在于:所述的基槽1为长方体状形的下沉式钢筋混凝土基槽,基槽1左、右侧壁的顶部设有槽道1a,移动式反力架3两侧立柱的脚轮安装于槽道1a内,移动式反力架3下表面设有多个千斤顶5。
所述的基槽1沿纵向方向被隔墙1b分割为环境模拟场1c和始发井1d,隔墙1b上开有盾构入口1e,环境模拟场1c的左、右侧壁及前壁均安装有固定式反力格架4,固定式反力格架4上均匀布置多个水平方向的千斤顶5,千斤顶5的前方设有滑动式挡墙单元6,滑动式挡墙单元6通过滑轨7安装于环境模拟场1c底部;
所述的固定式反力格架4上的千斤顶5和移动式反力架3下表面的千斤顶5均与液压加载装置2相连接。
Claims (1)
1.一种盾构隧道施工环境模拟系统,包括基槽(1)、液压加载装置(2)、控制装置,其特征在于:所述的基槽(1)为长方体状的下沉式钢筋混凝土基槽,基槽(1)左、右侧壁的顶部设有槽道,移动式反力架(3)两侧立柱的脚轮安装于槽道内,移动式反力架(3)下表面设有多个千斤顶(5);
所述的基槽(1)沿纵向方向被隔墙分割为环境模拟场和始发井,隔墙上开有盾构入口,环境模拟场的左、右侧壁及前壁均安装有固定式反力格架(4),固定式反力格架(4)上均匀布置多个水平方向的千斤顶(5),千斤顶(5)的前方设有滑动式挡墙单元(6),滑动式挡墙单元(6)通过滑轨(7)安装于环境模拟场底部;
所述的固定式反力格架(4)上的千斤顶(5)和移动式反力架(3)下表面的千斤顶(5)均与液压加载装置(2)相连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320003005 CN203066983U (zh) | 2013-01-04 | 2013-01-04 | 盾构隧道施工环境模拟系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320003005 CN203066983U (zh) | 2013-01-04 | 2013-01-04 | 盾构隧道施工环境模拟系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203066983U true CN203066983U (zh) | 2013-07-17 |
Family
ID=48765792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320003005 Expired - Lifetime CN203066983U (zh) | 2013-01-04 | 2013-01-04 | 盾构隧道施工环境模拟系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203066983U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061774A (zh) * | 2013-01-04 | 2013-04-24 | 西南交通大学 | 一种盾构隧道施工环境模拟装置 |
CN108918254A (zh) * | 2018-08-21 | 2018-11-30 | 中铁第勘察设计院集团有限公司 | 模拟地铁盾构隧道管片初始应力的试验装置及方法 |
-
2013
- 2013-01-04 CN CN 201320003005 patent/CN203066983U/zh not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061774A (zh) * | 2013-01-04 | 2013-04-24 | 西南交通大学 | 一种盾构隧道施工环境模拟装置 |
CN108918254A (zh) * | 2018-08-21 | 2018-11-30 | 中铁第勘察设计院集团有限公司 | 模拟地铁盾构隧道管片初始应力的试验装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061774A (zh) | 一种盾构隧道施工环境模拟装置 | |
CN207198149U (zh) | 一种基于数值模拟研究近距煤层群保水开采实验装置 | |
CN103076128B (zh) | 一种隧道三维应力场模拟装置 | |
AU2017329096B2 (en) | Intelligent numerically-controlled ultrahigh pressure true three-dimensional non-uniform loading/unloading and steady pressure model test system | |
CN107192810B (zh) | 采动覆岩破断型式及运动特征的三维多功能实验平台及试验方法 | |
CN101377479B (zh) | 采场矿压三维物理模拟试验台 | |
CN102182509B (zh) | 充填开采三维模拟试验装置及方法 | |
CN105092816B (zh) | 一种三维多煤层开采相似材料模型实验系统 | |
CN104007246B (zh) | 三维耦合可控滑面边坡稳定性相似试验系统 | |
CN102261972B (zh) | 煤矿综采支架与围岩关系实验平台 | |
CN105974056B (zh) | 隧道突水灾害前兆信息监测模型试验系统及试验方法 | |
CN103837360B (zh) | 一种隧道管棚施工法模拟开挖装置及其实施方法 | |
CN101308126B (zh) | 一种水下开采顶板渗流突水试验方法及装置 | |
CN106950070A (zh) | 用于矩形顶管顶进施工全过程模拟的试验装置 | |
CN104713738B (zh) | 一种双向多角度智能翻转模型试验装置及试验方法 | |
CN103616287A (zh) | 一种隧道开挖室内模型试验装置 | |
CN102434166A (zh) | 隧道开挖对既有近距离平行隧道影响的试验装置和方法 | |
CN211602719U (zh) | 一种多功能顶底板突水的采场矿压三维物理模拟试验平台 | |
CN108827233B (zh) | 一种两层采空区地面沉降的预测方法 | |
CN104237024A (zh) | 一种矿井工作面底板采动破坏模拟试验方法 | |
CN104266913A (zh) | 一种矿井工作面底板采动破坏模拟试验装置 | |
CN103063335B (zh) | 基于载荷监测数据的深部地应力三维地质勘察测试方法 | |
CN202994353U (zh) | 隧道三维应力场模拟系统 | |
CN103983742A (zh) | 煤层覆岩破断煤岩体瓦斯运移及抽采实验系统 | |
CN203745218U (zh) | 一种隧道管棚施工法模拟开挖装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210811 Address after: 610000, No. two, section 111, North Ring Road, Jinniu District, Sichuan, Chengdu Patentee after: SOUTHWEST JIAOTONG University Patentee after: FUZHOU METRO GROUP Co.,Ltd. Address before: 610031 No. two, section 111, ring road, Chengdu, Sichuan, China Patentee before: SOUTHWEST JIAOTONG University |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130717 |