CN203065497U - Blast furnace swinging chute - Google Patents

Blast furnace swinging chute Download PDF

Info

Publication number
CN203065497U
CN203065497U CN 201320030049 CN201320030049U CN203065497U CN 203065497 U CN203065497 U CN 203065497U CN 201320030049 CN201320030049 CN 201320030049 CN 201320030049 U CN201320030049 U CN 201320030049U CN 203065497 U CN203065497 U CN 203065497U
Authority
CN
China
Prior art keywords
layer
blast furnace
lining
repairing
swinging chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320030049
Other languages
Chinese (zh)
Inventor
林凡昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGHAI SHENGCHANG QUARTZ MATERIAL Co Ltd
Original Assignee
DONGHAI SHENGCHANG QUARTZ MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGHAI SHENGCHANG QUARTZ MATERIAL Co Ltd filed Critical DONGHAI SHENGCHANG QUARTZ MATERIAL Co Ltd
Priority to CN 201320030049 priority Critical patent/CN203065497U/en
Application granted granted Critical
Publication of CN203065497U publication Critical patent/CN203065497U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a working lining repairing layer of a blast furnace swinging chute. The blast furnace swinging chute comprises a housing, a brick layer, a permanent lining layer and a working lining layer, wherein the brick layer is packaged by the housing; the permanent lining layer is packaged by the brick layer; and the working lining layer is packaged by the permanent lining layer; the blast furnace swinging chute is characterized by further comprising a repairing layer, wherein the repairing layer is packaged by the working lining layer. Compared with the prior art, the blast furnace swinging chute has the following advantages and beneficial effects of changing the original four-layer structure into five-layer structure, additionally arranging the repairing layer on the innermost layer and avoiding the problem that the repairing layer and the working layer are not combined closely after the repairing, so that the service life of the repaired blast furnace swinging chute is prolonged.

Description

A kind of blast furnace oscillating chute
Technical field
The utility model relates to fire resisting material field, particularly a kind of blast furnace oscillating chute working lining repair layer.
Background technology
When damage appears in blast furnace oscillating chute working lining, need overlap and water repairing, repairing is carried out change chute after having gone out iron after, at first iron and slag remaining in the chute are cleaned out, manually smear repairing then, through the oscillating chute working lining after repairing, working lining increases work-ing life, the consumption of ton iron reduces, and chute work liner repairing can prolong the life-span of chute.Under the prior art, it mainly is to exempt to toast ramming mass and low cement deposit material that big-and-middle-sized blast furnace oscillating chute working lining is repaired anti-material, but these patching materials all can not reach its desirable service requirements.There is too short problem in work-ing life in ramming mass, and closely knit relatively because the ditch lining refractories of ramming generally is ditch basal surface one deck, poor with following position, top layer associativity, abrasion resistance is poor.Low cement deposit material is owing to need maintenance after the construction, and the construction period time lengthening can not rapid drying and baking, the problem that influence is used.These materials are shorter work-ing life in addition, after the repairing, hang the iron dry slag owing to remain in the mould material surface on working lining top layer, make and repair that one of formation is difficult to bonding closely knit interface between the bed of material and the former working lining, in use, molten iron can be penetrated into wherein gradually, after acquiring a certain degree, repair material can be peeled off by washing away of molten iron integral body, about ten thousand tons of general iron influx 4-5.It is too frequent that patching material weak point in work-ing life causes the wobble groove working lining to repair.The reparation construction labor strength is big, and the environment of high heat causes multiple unsafe factor again, and frequent maintenance is repaired the oscillating chute working lining and caused quality more to be difficult to guarantee.Along with iron-smelting blast furnace to large scale development, also more and more higher with the requirement of refractory materials use properties to the oscillating chute working lining, present big-and-middle-sized oscillating chute working lining patching material generally uses the low cement deposit material of the Al2O3-SiC-C matter of high-quality, one time iron influx develops into ten thousand tons of 6-8 by ten thousand tons of initial 4-5, according to the influence of its processing parameter in the anti-material use of oscillating chute working lining is thought: repair the erosion that mould material not only will stand high temperature sludge iron, the crackle of pour mass under the rapid heat cycle environment, bear the abrasion resistance of slag flowing molten iron, the also rapid construction of necessary raising work lining repair material, quick baking, requirement such as come into operation fast.
Summary of the invention
Problem to be solved in the utility model is:
1, solves blast furnace oscillating chute working lining and repair short problem of life-span;
2, solve existing blast furnace oscillating chute working lining reparation construction problem long in time limit.
As follows for addressing the above problem scheme of the present utility model:
The utility model also proposes a kind of blast furnace oscillating chute, comprises shell, shell hanger, brick layer, permanent lining, work lining, repair layer, and shell coated brick layer, brick layer wrap up permanent lining, permanent lining parcel work lining, work lining parcel repair layer.Repair bed thickness 15-30cm, made by refractory materials.
The utility model compared with prior art has the following advantages and beneficial effect: the utility model makes 5 layers into by 4 layers of original structure, and increased repair layer at innermost layer, occur repair layer after having avoided repairing and be combined closely knit inadequately problem with working lining, thereby prolonged repairing back work-ing life of blast furnace oscillating chute.
Description of drawings
Fig. 1 is the structural representation of the utility model oscillating chute.
Embodiment
Below in conjunction with Figure of description the utility model is described in further details.
A kind of blast furnace oscillating chute as shown in Figure 1, comprises shell 1, shell hanger 2, brick layer 3, permanent lining 4, work lining 5 and repair layer 6.Shell 1 coated brick layer 3, the permanent lining 4 of brick layer 3 parcel, permanent lining 4 parcel work linings 5, work lining 5 parcel repair layer 6.Repair layer 6 thickness are 15cm-30cm, and repair layer is made by refractory materials.

Claims (3)

1. blast furnace oscillating chute, comprise shell, shell hanger, brick layer, permanent lining, work lining, shell coated brick layer, brick layer wrap up permanent lining, permanent lining parcel work lining, it is characterized in that, also be included as repair layer, work lining parcel repair layer.
2. blast furnace oscillating chute as claimed in claim 1 is characterized in that, described repair layer thickness is 15cm-30cm.
3. blast furnace oscillating chute as claimed in claim 1 is characterized in that, described repair layer is made by refractory materials.
CN 201320030049 2013-01-21 2013-01-21 Blast furnace swinging chute Expired - Fee Related CN203065497U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320030049 CN203065497U (en) 2013-01-21 2013-01-21 Blast furnace swinging chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320030049 CN203065497U (en) 2013-01-21 2013-01-21 Blast furnace swinging chute

Publications (1)

Publication Number Publication Date
CN203065497U true CN203065497U (en) 2013-07-17

Family

ID=48764311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320030049 Expired - Fee Related CN203065497U (en) 2013-01-21 2013-01-21 Blast furnace swinging chute

Country Status (1)

Country Link
CN (1) CN203065497U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109852754A (en) * 2017-11-30 2019-06-07 上海梅山钢铁股份有限公司 Blast furnace oscillating chute technique

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109852754A (en) * 2017-11-30 2019-06-07 上海梅山钢铁股份有限公司 Blast furnace oscillating chute technique

Similar Documents

Publication Publication Date Title
CN103736985B (en) A kind of ladle working lining and slag lining thereof build by laying method
CN104390461B (en) Energy-saving cement rotary kiln lining and masonry process thereof
CN102249698B (en) Blast furnace cooling wall laying brick
CN101957139A (en) Furnace lining repairing technology
CN103350221B (en) Method for maintaining and building 320-ton torpedo ladle cone working layer
CN106116611A (en) A kind of main trough of blast furnace working lining hot jetting material and preparation method thereof
CN102659367A (en) High-temperature-resistant concrete composition and high-temperature-resistant concrete prepared from same
CN105036775A (en) Torpedo ladle slag line zone repair material
CN203065497U (en) Blast furnace swinging chute
CN104451008B (en) A kind of blast furnace gravity flow fire-resistant castable construction method
CN104972104A (en) Manufacturing method and combination mode of tundish working lining
CN203346412U (en) Blast-furnace tapping channel with impact area liners
CN204381354U (en) A kind of external refining ladle
CN203695941U (en) Steel ladle working lining
CN104567427B (en) A kind of environmental protection quick change stagewise iron tap channel
CN108059453A (en) A kind of coke dry quenching furnace bostle pipe road Mg-Al spinel brick
CN203212593U (en) Swing chute of composite material
CN207308957U (en) Improved continuous casting production
CN201344729Y (en) Repaired structure for working lining at middle part of vertical vacuum refining furnace
CN204373412U (en) A kind of environmental protection quick change segmented iron tap channel
CN202989189U (en) Slag trough for blast furnace casting house
CN103801683A (en) Hot metal ladle capable of pouring slag line layer
CN202786290U (en) Blast-furnace tapping channel with bonding slurry capable of being repaired
CN205368424U (en) Submerged RH dip pipe structure of lining brick in preventing
CN201785348U (en) Novel bifurcated chute of coke dry quenching (CDQ) once dust remover

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20160121

EXPY Termination of patent right or utility model