CN203049632U CN 201220652965 CN201220652965U CN203049632U CN 203049632 U CN203049632 U CN 203049632U CN 201220652965 CN201220652965 CN 201220652965 CN 201220652965 U CN201220652965 U CN 201220652965U CN 203049632 U CN203049632 U CN 203049632U
Authority
CN
China
Prior art keywords
module
chain
construction
board
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220652965
Other languages
Chinese (zh)
Inventor
陈国荣
张铁峰
张卓先
王世坚
张骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Port Of Ningbo Harbour Engineering Co Ltd
Original Assignee
Port Of Ningbo Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Port Of Ningbo Harbour Engineering Co Ltd filed Critical Port Of Ningbo Harbour Engineering Co Ltd
Priority to CN 201220652965 priority Critical patent/CN203049632U/en
Application granted granted Critical
Publication of CN203049632U publication Critical patent/CN203049632U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a remote monitoring and recording system for construction of a plastic drainage plate spile machine. The system comprises a construction machine platform, a vertical frame, a spile, a direction identifying module, a travel detection module and a main monitoring module, wherein the vertical frame is provided with a chain, the chain is driven by a chain power device, the chain is fixedly connected with the spile, the direction identifying module is used for detecting the states of working directions of the vertical frame, the travel detection module is used for detecting the movement directions and travels of the chain, the main monitoring module is used for analyzing, judging and recording the obtained information, the main monitoring module is connected with the direction identifying module and the travel detection module and is used for obtaining information from the direction identifying module and the travel detection module, and the main monitoring module is connected with a monitoring center by a remote transmission module. By adopting the technical scheme, engineering conditions can be accurately recorded without supervision persons arriving the site, ex-situ real-time supervision and automatic recording are realized, labor productivity is greatly improved, artificial factors are reduced, engineering management quality is improved, and engineering management cost is reduced.

Description

Plastic draining board board-plugging device construction remote monitoring register system
Technical field
The utility model belongs to the project supervision apparatus field, relates in particular to a kind of plastic draining board board-plugging device construction remote monitoring register system.
Background technology
Consolidation Effect through Plastic is the common method of reinforcing subgrade in the building trade.This method is to have the plastic slat of vertical shallow trench to insert in the weak soil on the surface with board-plugging device, load precompressed (or vacuum preloading) then on the ground, water in the weak soil is overflowed along the vertical channel of plastic draining board, thereby make ground get rid of moisture content and accelerated fixed.With this method Ground Treatment, the plastic plate that plastic plate inserts the degree of depth of weak soil and the insertion density of arranging in the ground scope of handling has very big influence to workmanship.Not enough or arrange too thinly as the plastic plate insertion depth, can not get rid of moisture content in the basic soil by designing requirement, then this ground is failed to reinforce effectively and is that building operations after reinforcing brings hidden dangers in project.The insertion depth of band drain still lacks a kind of effective supervising device during at present to Plastic Drain Slab Construction.If unit in charge of construction takes place for saving man-hour and material, make the insertion depth of band drain not reach designing requirement, for want of simple measuring means then may have a strong impact on workmanship, cause heavy economic losses.
Treatment of soft foundation project in the engineerings such as Consolidation Effect through Plastic is mainly used in speedway, railway, airport, power plant, stockyard, harbour, encloses and cultivates, Wastewater Treatment Plant, refuse landfill, reclaiming land around sea, water conservancy and hydropower, wharf structure.In the industrial social construction of modernization, the modern logistics fast development, harbour, the construction in harbour and container heap fortune place is very frequent.Along with the development of society and the aggravation of commercial competition, logistics company requires more and more higher to capital construction quality and cost to the influence that the long-term running cost of company causes, for supervising the workmanship of each procedure in the stockyard infrastructure of big plane, prevent from variously having a mind to or using inferior materials and turning out substandard goods unintentionally, construct according to design scheme fully, maintain strict control over gate of the quality monitoring, must plug in machine this crucial hidden operation course of work of constructing to plastic draining board and carry out whole process and monitor in real time and record.But at present, need the management personnel to site work ability accurate recording engineering situation, increased the engineering management cost greatly.
In the prior art, board-plugging device comprises the construction board, stand and plate, the construction board is used for the stand vertical ground is erected, the chain that is driven by the chain power set is installed in the stand, chain is connected with the plate top, plate is the flat metal tube that can insert plastic draining board, the plastic draining board of coiling penetrates from the plate top and links to each other with the stake point of plate lower end, like this, chain rotation compressing plate is underground with the insertion of stake point, thereby it is underground to drive the plastic draining board insertion, and plate is pulled out in the chain counter-rotating, plastic draining board lower end and stake point are stayed underground, plastic draining board upper end draining.
Summary of the invention
In order to solve above-mentioned technical problem, the purpose of this utility model provides a kind of plastic draining board board-plugging device construction remote monitoring register system, need the management personnel not arrive just energy accurate recording engineering situation of site work, carry out the strange land automatic record of supervision in real time, greatly raise labour productivity, reduce human factor, improve the engineering management quality, reduce the engineering management cost.
To achieve the above object, the utility model has adopted following technical scheme:
Plastic draining board board-plugging device construction remote monitoring register system, comprise construction board, stand and plate, the chain that is driven by the chain power set is installed in the stand, and chain is fixedlyed connected with plate, also comprises: for detection of the direction identification module of stand operative orientation state; Stroke detection module for detection of chain movement direction and stroke; For the monitoring primary module that the information that obtains is analyzed, differentiated and records, the monitoring primary module is connected with the stroke detection module with the direction identification module and obtains information from these two modules, and the monitoring primary module is connected with Surveillance center by remote-transmission module.
As preferably, described direction identification module is the vertical detection instrument that is installed in the stand.Whether the vertical detection instrument is can the sensing stand vertical and send a signal to the monitoring primary module.
As preferably, described stroke detection module comprises the sprocket wheel that is installed in the stand, and sprocket wheel and described chain interlock transmission and sprocket wheel card are provided with coding structure, and the sprocket wheel both sides are equipped with the photoelectric sensor assembly that described coding structure is detected.
As preferably, described sprocket wheel and photoelectric sensor assembly A are installed in the box body A, and box body A top is equipped with rain-proof shed.
As preferably, described stroke detection module comprises the box body B that is installed in the stand, and chain passes from box body B, is equipped with in the box body B for detection of the photoelectric sensor assembly B of chain link plate by quantity and direction.
Described remote-transmission module is GSM or GPRS wireless remote transmission equipment.
The utility model is owing to adopted above technical scheme, need the management personnel not arrive just energy accurate recording engineering situation of site work, carry out the strange land automatic record of supervision in real time, greatly improved labor productivity, reduced human factor, improve the engineering management quality, reduced the engineering management cost.
Description of drawings
Fig. 1 is use schematic diagram of the present utility model;
Fig. 2 is theory diagram of the present utility model;
Fig. 3 is the I place enlarged diagram among Fig. 1;
Fig. 4 is the lateral view of Fig. 3;
Fig. 5 is the structural representation of stroke detection module among the embodiment 2;
Fig. 6 is the side sectional view of Fig. 5.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is made a detailed explanation.
Embodiment 1:
Plastic draining board board-plugging device construction remote monitoring register system as shown in Figure 1 and Figure 2, comprise construction board 1, stand 2 and plate 3, the chain 10 that is driven by chain power set 5 is installed in the stand 2, chain 10 is fixedlyed connected with plate 3, also comprises: for detection of the direction identification module 8 of stand operative orientation state; Stroke detection module 9 for detection of chain 10 directions of motion and stroke; For the monitoring primary module 7 that the information that obtains is analyzed, differentiated and records, monitoring primary module 7 is connected with stroke detection module 9 with direction identification module 8 and obtains information from these two modules, and monitoring primary module 7 is connected with Surveillance center by remote-transmission module.Described remote-transmission module is GSM or GPRS wireless remote transmission equipment.
In the present embodiment, described direction identification module 8 is for being installed in the vertical detection instrument 15 in the stand 2.As shown in Figure 3, Figure 4, described stroke detection module 9 comprises the sprocket wheel 13 that is installed in the stand 2, sprocket wheel 13 is provided with coding structure with described chain 10 interlock transmissions and sprocket wheel 13 cards, and sprocket wheel 13 both sides are equipped with the photoelectric sensor assembly 12 that described coding structure is detected.Described sprocket wheel 13, photoelectric sensor assembly A12 and vertical detection instrument 15 all are installed in the box body A11, and box body A11 top is equipped with rain-proof shed 14.
Stroke detection module and direction identification module all are installed in the housing the inside of a customization, and whole housing is fixed by bolts to plastic draining board and inserts in the machine stand, the electric-control system water-tight, and the housing top is equipped with awning, improves the electric-control system working environment.Chain passes the detection box, by each side block and code-disc sprocket wheel restriction site, drive sprocket rotation by chain link in the time of chain movement, the angle of the gray encoding dish on the photoelectric sensor module sampling code-disc sprocket wheel changes, the goniometer that the stroke detection module turns over by the detection sprocket wheel is calculated the stroke of chain, and the stroke of chain is exactly the insertion engineering quantity of band drain.Can also calculate simultaneously the speed of insertion, analyze different geology hardness.
As described in Figure 1, this system is installed on the plastic draining board board-plugging device, and the engineering quantity of plastic draining board is carried out accurately at regular time and quantity monitoring, and in the system that record data are preserved.When construction board 1 is holded up vertical ground with stand 2, the direction sensing module detects stand and immediately signal is passed to the monitoring primary module when in running order, monitoring primary module startup stroke detection module detects the direction of motion and the stroke of chain, the chain 10 of chain power set 5 drivings drives plates 3 and inserts ground downwards then, plate 3 lower ends are for the stake point and plastic draining board 4 is fixedly arranged, plastic draining board 4 inserts underground with plate 3, the stroke detection module is determined the stroke of chain and direction and signal is passed to the insertion depth that the monitoring primary module begins to measure band drain by the rotation situation that detects sprocket wheel; When plate 3 is inserted into designated depth, chain power set 5 stop chain drive-belt 10, and plate is pulled out in the chain counter-rotating, the stroke detection module is passed to the monitoring primary module with chain movement information, plastic draining board lower end and stake point are stayed underground, and plastic draining board 4 is cut off the enforcement draining from band drain charging basket 6.Native system can carry out correct and effective recognition to plugging in the machine stroke of effectively constructing, according to the stroke sensor signal on the working node under the equipment working condition and plug in machine stand duty identification sensor signal and effectively engineering times three aspect parameter carry out intellectual analysis and judgement, the impulse stroke each time of real time record equipment, automatically taxonomic revision and filing, effective engineering quantity of can accurate recording plugging in machine.
Consider that monitored target might be a plurality of strange lands targets, we have carried GSM or GPRS wireless remote transmission equipment in system, according to the software program of setting, regularly or by instruction to the wireless record data of uploading of monitoring center's computer remote.Can monitor the place that any GSM or GPRS wireless signal cover in real time, namely mobile phone has the place of signal just can effectively monitor the construction operation target.Monitoring main system and GSM or GPRS wireless remote transmission module and supervision center constitute the wireless monitor function with GSM or the GPRS wireless remote transmission equipment that computer is connected.If the supervisor of supervision center wants to understand the logging that plastic draining board is plugged in machine, send to read by the connected wireless remote transmission equipment of computer control and plug in machine logging signal and give monitoring system on the machine of inserting, monitoring system receives signal and exists the data in the internal system memory device to become the communication data by means such as software cryptography, compression handle, and by the computer of wireless remote transmission module loopback to supervision center, computer carries out software decryption, decompression scheduling algorithm after receiving data, preserves and show the logging of the machine of inserting in computer.Monitoring and recording system must use when plastic draining board is plugged in the machine construction operation in start, and system directly shows the engineering quantity of this equipment, and the duty of energy display system, OBD, when system works is unusual, automatic record trouble state, and according to different situations, the indication of reporting to the police.
Plastic draining board is inserted the stand mechanism state of machine and can be regulated, duty is perpendicular to ground, stop that states such as worker, transportation, maintenance keep flat and non-perpendicular, so disposed the direction identification module that to identify stand operative orientation state in the system that is installed on stand mechanism, can monitor the construction direction of the machine of inserting construction state, when plug in machine stand is in non-perpendicular position, system judges that the machine of inserting construction is invalid, only when system identification was in perpendicular to ground location to plug in machine stand mechanism, construction just may be effective.Be provided with stand mechanism position blinker in construction board 1, can directly indicate the installing mechanism real time position, convenient construction operating personnel observe at any time.
The stroke sensing module that plastic draining board is plugged in machine is installed in by bolt on the mount pad of facility stand, the lead sealing tamper of management side, and mount pad welding or bolt connect stand, and chain passes module, drives sprocket rotation.Be shaped on the gray encoding dish of particular design on the chain sprocket, can differentiate the toothed disc relatively rotation place, some groups of infrared photoelectric sensors are installed in Gray's code-disc both sides, side emission infrared light, and the infrared signal that opposite side launches by the induction opposite is identified the position signalling of sprocket wheel.The direction of motion and the stroke of chain can be judged by the signal Changing Pattern of every group of photoelectric sensor by system, and the monitoring band drain inserts the degree of depth on ground.
The monitoring primary module from the working condition of direction identification module and the plug in machine of stroke sensing module judgement plastic draining board, is identified the course of work by each module of wired connection automatically, and the each parameters of operation process of band drain of inserting of record is in order to inquire about.System is provided with the automatic fault recognition system simultaneously, but the quality of the sensor of self-checking system, and the working condition of judge plugging in machine in the course of the work, if it is undesired to monitor system works, system carries out sound and light alarm.The monitoring primary module regularly or by instruction to central computer by uploading record data with GSM or GPRS wireless remote transmission equipment wireless.
The installation of system is very simple, as long as mount pad welding or bolt are connected in the stand, then system is connected with mount pad with bolt, does not change and inserts the original constructing structure of machine, keeps original form of construction work, does not influence constructor's operating habit.
The enforcement of native system, improved the scientific and technological management level, can effectively raise labour productivity, greatly reduce human factor to the influence of engineering quality control, make management can maintain strict control over gate of the quality monitoring, understand construction quality and the progress of engineering in real time, fully understand the practice of construction ability of construction party exactly, the behavior cost that construction party may be practised fraud is higher than construction cost, thereby stops cheating, greatly improve management benefit, also provide reference for later bid and tender for construction project work.Really accomplish to want benefit to management, want benefit to technology, management and technology go out the level of benefit.
Quick raising along with China's economic development and scientific and technological level, enforcement when the Big Dipper 2 signal communication navigation systems of China, positioning function is expanded on basis at native system, can monitor the particular location of inserting point, using native system just can carry out perfect fully to the construction quality management of plugging in machine, when the time comes, site administrator's telemanagement will be accomplished really not have, and all quality index of the machine of inserting construction will be controlled all by engineering management side.
Embodiment 2:
Plastic draining board board-plugging device construction remote monitoring register system, the different stroke detection modules that only are with embodiment 1: as Fig. 5, shown in Figure 6, the trip detection module 9 comprises the box body B16 that is installed in the stand 2, chain 10 passes from box body B16, the photoelectric sensor assembly B17 that crosses quantity and direction for detection of chain 10 links is installed in the box body B16, and chain locating wheel 18.
It is emphasized that: above only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any simple modification, equivalent variations and modification that above embodiment does.

Claims (6)

1. plastic draining board board-plugging device construction remote monitoring register system, comprise construction board (1), stand (2) and plate (3), the chain (10) that is driven by chain power set (5) is installed in the stand (2), chain (10) is fixedlyed connected with plate (3), it is characterized in that, also comprise:
Direction identification module (8) for detection of stand operative orientation state;
Stroke detection module (9) for detection of chain (10) direction of motion and stroke;
For the monitoring primary module (7) that the information that obtains is analyzed, differentiated and records, monitoring primary module (7) is connected with stroke detection module (9) with direction identification module (8) and obtains information from these two modules, and monitoring primary module (7) is connected with Surveillance center by remote-transmission module.
2. plastic draining board board-plugging device construction remote monitoring register system according to claim 1 is characterized in that described direction identification module (8) is for being installed in the vertical detection instrument (15) in the stand (2).
3. plastic draining board board-plugging device according to claim 1 construction remote monitoring register system, it is characterized in that, described stroke detection module (9) comprises the sprocket wheel (13) that is installed in the stand (2), sprocket wheel (13) is provided with coding structure with described chain (10) interlock transmission and sprocket wheel (13) card, and sprocket wheel (13) both sides are equipped with the photoelectric sensor assembly A(12 that described coding structure is detected).
4. plastic draining board board-plugging device according to claim 3 construction remote monitoring register system, it is characterized in that, described sprocket wheel (13) and photoelectric sensor assembly A(12) be installed in box body A(11) in, box body A(11) top is equipped with rain-proof shed (14).
5. plastic draining board board-plugging device according to claim 1 construction remote monitoring register system, it is characterized in that, described stroke detection module (9) comprises the box body B(16 that is installed in the stand (2)), chain (10) is from box body B(16) pass box body B(16) in the photoelectric sensor assembly B(17 that crosses quantity and direction for detection of chain (10) links is installed).
6. plastic draining board board-plugging device construction remote monitoring register system according to claim 1 is characterized in that described remote-transmission module is GSM or GPRS wireless remote transmission equipment.
CN 201220652965 2012-11-29 2012-11-29 Remote monitoring and recording system for construction of plastic drainage plate spile machine Expired - Fee Related CN203049632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220652965 CN203049632U (en) 2012-11-29 2012-11-29 Remote monitoring and recording system for construction of plastic drainage plate spile machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220652965 CN203049632U (en) 2012-11-29 2012-11-29 Remote monitoring and recording system for construction of plastic drainage plate spile machine

Publications (1)

Publication Number Publication Date
CN203049632U true CN203049632U (en) 2013-07-10

Family

ID=48732603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220652965 Expired - Fee Related CN203049632U (en) 2012-11-29 2012-11-29 Remote monitoring and recording system for construction of plastic drainage plate spile machine

Country Status (1)

Country Link
CN (1) CN203049632U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759540A (en) * 2016-12-26 2017-05-31 天津港航工程有限公司 Soft soil foundation Plastic Drain Slab Construction depth remote detecting system and its detection method
CN107630476A (en) * 2017-10-11 2018-01-26 杭州长杰科技有限公司 A kind of drain bar construction note system
CN112915453A (en) * 2021-02-18 2021-06-08 中建八局第一建设有限公司 Fire hose water pressure monitoring system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759540A (en) * 2016-12-26 2017-05-31 天津港航工程有限公司 Soft soil foundation Plastic Drain Slab Construction depth remote detecting system and its detection method
CN107630476A (en) * 2017-10-11 2018-01-26 杭州长杰科技有限公司 A kind of drain bar construction note system
CN112915453A (en) * 2021-02-18 2021-06-08 中建八局第一建设有限公司 Fire hose water pressure monitoring system and method
CN112915453B (en) * 2021-02-18 2022-05-24 中建八局第一建设有限公司 Fire hose water pressure monitoring system and method

Similar Documents

Publication Publication Date Title
CN111126838B (en) Intelligent engineering management system
CN201993108U (en) On-line intelligent monitoring system of tailing pond
CN206768889U (en) A kind of subway foundation pit automates DEFORMATION MONITORING SYSTEM
CN208225263U (en) A kind of safety monitoring slope acquisition system based on Internet of Things big data
CN103016063B (en) Monitoring system for construction safety
CN103257644A (en) Method for online monitoring of tailings pond safe state
CN106840265B (en) Scaffold safety early warning system
CN201251564Y (en) Device for monitoring stability of roof strata or concrete structure of well in real-time
CN106089304A (en) A kind of based on stratum construction multifunctional electric control early warning communication system
CN215909901U (en) Multi-data mixed high slope monitoring and early warning device
CN101363824A (en) Device for real time monitoring mine roof rock formation or concrete structure stability
CN102251510A (en) Detection system for tamping settlement of heavy tamping machine
CN203049632U (en) Remote monitoring and recording system for construction of plastic drainage plate spile machine
CN110929182A (en) Intelligent sand production monitoring device and monitoring method thereof
CN110821560A (en) Tunnel inspection system
CN202885783U (en) Stroke detection module of plastic drainage plate insertion machine construction remote monitoring and recording system
CN103778683A (en) Electronic inspection system for tunnel structure and using method thereof
CN113936228A (en) High slope monitoring and early warning system based on unmanned aerial vehicle data check
CN203132755U (en) Wireless intelligent online pull-monitoring system
CN115640925A (en) Wisdom building site management system
CN112556760A (en) Bridge crack monitoring system
CN113569428A (en) Tunnel abnormity detection method, device and system
CN106759540B (en) Soft soil foundation Plastic Drain Slab Construction depth remote detecting system and its detection method
CN208183704U (en) The safety pre-warning system in tunnel portal slope construction stage
CN104563087A (en) Dynamic compactor and method for automatically monitoring dynamic compaction construction effectiveness

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130710