CN203036115U - Pipeline - Google Patents

Pipeline Download PDF

Info

Publication number
CN203036115U
CN203036115U CN 201320003541 CN201320003541U CN203036115U CN 203036115 U CN203036115 U CN 203036115U CN 201320003541 CN201320003541 CN 201320003541 CN 201320003541 U CN201320003541 U CN 201320003541U CN 203036115 U CN203036115 U CN 203036115U
Authority
CN
China
Prior art keywords
pipeline
pipe section
connecting band
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320003541
Other languages
Chinese (zh)
Inventor
唐菊娣
王亚辉
陈新风
付明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jiang Han Technology Co., Ltd.
Original Assignee
SICHUAN JIANGHAN INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN JIANGHAN INDUSTRIAL Co Ltd filed Critical SICHUAN JIANGHAN INDUSTRIAL Co Ltd
Priority to CN 201320003541 priority Critical patent/CN203036115U/en
Application granted granted Critical
Publication of CN203036115U publication Critical patent/CN203036115U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a pipeline. The pipeline at least comprises a first pipeline section and a second pipeline section which are connected with each other and a polythene (PE) connecting band which is adhered to the inner surfaces of the first pipeline section and the second pipeline section by expanded polystyrene, so that the first pipeline section is connected with the second pipeline section. According to the pipeline, special electrifying equipment is not required, so that heavy work of carrying and the like is eliminated, the pipeline sections are convenient and easy to connect, and the obtained pipeline has high performance of sealing and water prevention.

Description

Pipeline
Technical field
The utility model relates to a kind of pipeline.
Background technique
Existing pipeline, especially large diameter plastic pipe is widely used in municipal engineering, hydraulic engineering.Because these plastic pipes are generally used for materials such as long-distance transportation water, whole plastic pipe is formed by connecting by a plurality of pipe sections usually.
At present, adopt Electric thermal smelting belt to connect in the joint of two pipe sections usually.During connection, with the back alignment that finishes of the internal surface of two pipe sections cleaning, Electric thermal smelting belt is attached to the internal surface of pipe section.Be provided with the electronics silk in the Electric thermal smelting belt, adopt energising equipment to connect Electric thermal smelting belt, make the Electric thermal smelting belt fusing, and keeping two pipe sections that it is compressed, after curing after a while, two pipe sections can link together.
The defective of this pipeline and attaching method thereof is that at the on-the-spot energising equipment that needs special use of the connection of pipeline, its volume is bigger, carrying inconvenience.
The model utility content
The technical problems to be solved in the utility model is, needs special-purpose energising equipment to connect, carry the defective of inconvenience at pipeline in the prior art, and a kind of pipeline is provided, and does not need extra energising equipment.
The technological scheme that its technical problem that solves the utility model adopts is: construct a kind of pipeline, at least comprise interconnective first pipe section and second pipe section, thereby described pipeline comprises also by foamed glue and is bonded in the PE connecting band that the internal surface of described first, second pipe section links together first, second pipe section.
According to pipeline described in the utility model, described pipeline also comprises for the link on the auxiliary inwall that described PE connecting band is fixed to described first, second pipe section.
According to pipeline described in the utility model, described link is tapping screw.
According to pipeline described in the utility model, described link is with equidistant arrangement.
According to pipeline described in the utility model, the two ends of described PE connecting band are welded on described first, second side opposite by the PE scolder respectively.
Implement pipeline of the present utility model, have following beneficial effect: pipeline of the present utility model does not need special-purpose energising equipment, has exempted hard works such as carrying, and the connection between each pipe section is very convenient, easy to operate, and the pipeline that obtains has good water-tight performance.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples, in the accompanying drawing:
Fig. 1 is the partial sectional view of pipeline in the utility model;
Fig. 2 is the A portion enlarged view of Fig. 1.
Embodiment
In order to make the purpose of this utility model, technological scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explaining the utility model, and be not used in restriction the utility model.
Fig. 1 is the partial sectional view of pipeline in the utility model; Fig. 2 is the A portion enlarged view of Fig. 1.As depicted in figs. 1 and 2, pipeline 100 of the present utility model comprises interconnective first pipe section 101 and second pipe section 102 at least, only shows two pipe sections in the drawings, but can comprise plural pipe section in other embodiments.Each pipe section 101,102 internal diameter are identical, can be plastic pipe or the multiple tube that accompanies steel band, but the internal surface of each pipe section are plastic interior surfaces.
The internal surface of first, second pipe section 101,102 adjacent end portion forms join domain 103 jointly.For fear of Temperature Influence, between first, second pipe section 101,102 adjacent end portion, reserve the flexible gap that is not less than 30mm.Thereby pipeline 100 also comprise by foamed glue 104 be bonded in the PE(polyethylene that first, second pipe section 101,102 internal surface link together two pipe sections 101,102) connecting band 105.This PE connecting band 105 is annular perpendicular to pipeline 100 axial cross sections.According to the caliber of pipeline 100, can select the PE connecting band 105 of different size specification.When bonding, at the join domain 103 spray foamed glues 104 of first, second pipe section 101,102 internal surfaces, afterwards PE connecting band 105 held round and is fitted on the internal surface that is sprayed with foamed glue 104 earlier.
Pipeline 100 also comprises for auxiliary PE connecting band 105 is fixed to link 106 on first, second pipe section 101,102 inwalls, and this link 106 can be tapping screw, and its quantity is a plurality of, equidistantly to be arranged on the PE connecting band 105.
Because pipeline 100 is usually used in carrying liquid such as potable water, these liquid inevitably can be interior to exosmosis from pipeline 100.When liquid infiltrated into foamed glue 104 by the gap between for example link 106 and the PE connecting band 105, foamed glue 104 meeting imbibitions were fully filled the gap, thereby are strengthened the water-proof performance of pipeline 100.
Between the two ends of PE connecting band 105 and first, second pipe section 101,102 internal surfaces, may there be small gap, in order to strengthen waterproof, the two ends of PE connecting band 105 are welded on first, second pipe section 101,102 internal surface by PE scolder 107 respectively.
The below connecting means of explanation pipeline 100 of the present utility model.This connecting means mainly may further comprise the steps:
Inspection before S0, the connection, check earlier whether first, second pipe section 101,102 tubing inner and outer surface be smooth, have or not breakage, no concave-convex or steel band exposed (for the multiple tube that accompanies steel band) are arranged, if there is steel band exposed, whether repair welding is smooth then to prevent the exposed PE scolder of steel band.First, second pipe section 101, foreign material in 102 are removed, cleaned first, second pipe section 101,102 pipe end join domain;
S1, first, second pipe section 101,102 pipe end are aligned, make both axis straight and be located along the same line, and reserve the flexible gap that is not less than 30mm.
S2, at first, second pipe section 101,102 internal surface mark foamed glue spray regime terminated line, this foamed glue spray regime is advisable than the little 15-20mm of lay length of actual PE connecting band 105, to reserve the follow-up welding job district that PE connecting band 105 is welded.Afterwards, use the foam gun through cleaning that foamed glue 104 is injected in join domain with first, second pipe section 101,102 internal surfaces equably along circumferencial direction, spray regime must not surpass foamed glue spray regime terminated line.In the practice of construction process, can regulate the flow control valve of foam gun as required, thereby adjust the colloid flow of foamed glue.
S3, use supporting facility hold round PE connecting band 105 and exert pressure, make it be fitted in first, second pipe section 101 that sprays foamed glue 104, the join domain 103 of 102 internal surfaces, use rubber mallet to knock the internal surface of PE connecting band 105, knock the dynamics appropriateness, assurance PE connecting band 105 is evenly fitted with foamed glue 104, thereby first, second pipe section 101,102 is linked together.PE connecting band 105 and foamed glue 104 bonding operates in 20 minutes and finishes with interior, can't fit after foamed glue 104 dry tack frees avoiding.
S4, with predetermined spacing, adopt link 106 with PE connecting band 105 along circumferencial direction locking and be fixed on first, second pipe section 101,102 internal surfaces.In order to improve speed of application and to reduce labor intensity, be under the situation of tapping screw at link 106, can adopt electric screwdriver or criticize surely, operation tool such as square pneumatic screwdriver tightens tapping screw.Because first, second pipe section 101,102 internal surfaces are frosting, PE connecting band 105 is the PE material, the gear control of operation tool is preferably controlled low and middle-grade, the moment of torsion of adjusting screw gradually then as initial value with 1.5-1.6Nm is to desired value, to prevent first, second pipe section 101,102 or PE connecting band 105 crackings and link 106 sliding teeth.
S5, with miniature extruder or EVA welding gun, use the PE scolder that circumference soldering and sealing is carried out with first, second pipe section 101,102 inwall joints in the end of PE connecting band 105 to seal.Finish first, second pipe section 101,102 connection.
Compared with prior art, pipeline 100 of the present utility model does not need special-purpose energising equipment, has exempted hard works such as carrying, and the connection between each pipe section is very convenient, and is easy to operate, and the pipeline 100 that obtains has good water-tight performance.
The above only is preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of within spirit of the present utility model and principle, doing, be equal to and replace and improvement etc., all should be included within the protection domain of the present utility model.

Claims (5)

1. pipeline, at least comprise interconnective first pipe section and second pipe section, it is characterized in that, thereby described pipeline also comprises by foamed glue and is bonded in the PE connecting band that the internal surface of described first, second pipe section links together first, second pipe section.
2. pipeline according to claim 1 is characterized in that, described pipeline also comprises for the link on the auxiliary inwall that described PE connecting band is fixed to described first, second pipe section.
3. pipeline according to claim 2 is characterized in that, described link is tapping screw.
4. according to claim 2 or 3 described pipelines, it is characterized in that described link is with equidistant arrangement.
5. pipeline according to claim 1 is characterized in that, the two ends of described PE connecting band are welded on described first, second side opposite by the PE scolder respectively.
CN 201320003541 2013-01-06 2013-01-06 Pipeline Expired - Fee Related CN203036115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320003541 CN203036115U (en) 2013-01-06 2013-01-06 Pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320003541 CN203036115U (en) 2013-01-06 2013-01-06 Pipeline

Publications (1)

Publication Number Publication Date
CN203036115U true CN203036115U (en) 2013-07-03

Family

ID=48688244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320003541 Expired - Fee Related CN203036115U (en) 2013-01-06 2013-01-06 Pipeline

Country Status (1)

Country Link
CN (1) CN203036115U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912742A (en) * 2013-01-06 2014-07-09 四川江瀚工业股份有限公司 Pipe and connection method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912742A (en) * 2013-01-06 2014-07-09 四川江瀚工业股份有限公司 Pipe and connection method thereof
CN103912742B (en) * 2013-01-06 2018-04-20 四川江瀚工业股份有限公司 Pipeline and attaching method thereof

Similar Documents

Publication Publication Date Title
CN207316296U (en) Universal adjustment connecting tube for building water supply and drainage
CN104633377B (en) A kind of high-pressure glass fiber pipeline is installed and pipe breakage maintenance unit and process
US20030155768A1 (en) Plastic pipe adhesive joint
CN203036115U (en) Pipeline
CN107387922A (en) A kind of seal for pipe joints connector
US6604761B1 (en) Coupling device for two pipes made of composite material based on a thermoplastic
CN103912742A (en) Pipe and connection method thereof
CN203628139U (en) High-pressure fiberglass pipeline installing and damage maintenance device
CN103395210A (en) Production method for rubber-plastic subsea pipeline and connection structure for same
TW200744827A (en) Welding method for plastic joint, and junction part structure of plastic joint
CN202972267U (en) Pipeline screw thread-free telescoping connecting pipe joint member
CN211010200U (en) Novel PPR pipe joint
CN209743849U (en) Connecting pipe fitting for plastic glass pipe
CN206550874U (en) It is a kind of to be used to adjust helping for sand valve to blow device
CN208417963U (en) Adjustable elbow repairing device
KR101281507B1 (en) Tube for inhibiting corrosion of pipe connecting portion
CN205298859U (en) Compound pipe of steel skeleton PE plastics
CN201277409Y (en) Butt joint used for plastic pipe
CN110657288A (en) Metal-plastic composite pipe system and manufacturing method thereof
CN104696550A (en) Multi-purpose composite pipeline connecting component with bypass
CN203641722U (en) In-line plastic joint
CN208919539U (en) A kind of pipeline patching device
CN104653923A (en) Quick pipe joint
CN210179147U (en) Epoxy glass fiber reinforced plastic pipeline joint
CN204805837U (en) Connecting device is moulded to steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SICHUAN JIANGHAN TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: SICHUAN JIANGHAN INDUSTRIAL CO., LTD.

Effective date: 20140519

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 611830 CHENGDU, SICHUAN PROVINCE TO: 611800 CHENGDU, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140519

Address after: 611800, No. 4, Zijin Road, Dujiangyan Economic Development Zone, Dujiangyan, Sichuan, Chengdu, Sichuan

Patentee after: Sichuan Jiang Han Technology Co., Ltd.

Address before: 611830 Jiang Han Industrial Park, Chengdu, Sichuan, Dujiangyan

Patentee before: SICHUAN JIANGHAN INDUSTRIAL CO., LTD.

PP01 Preservation of patent right

Effective date of registration: 20140711

Granted publication date: 20130703

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20150111

Granted publication date: 20130703

RINS Preservation of patent right or utility model and its discharge
PP01 Preservation of patent right

Effective date of registration: 20160616

Granted publication date: 20130703

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20161216

Granted publication date: 20130703

PD01 Discharge of preservation of patent
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20170106