CN203034795U - Plate and strip combined type stand wall formwork - Google Patents

Plate and strip combined type stand wall formwork Download PDF

Info

Publication number
CN203034795U
CN203034795U CN 201320051761 CN201320051761U CN203034795U CN 203034795 U CN203034795 U CN 203034795U CN 201320051761 CN201320051761 CN 201320051761 CN 201320051761 U CN201320051761 U CN 201320051761U CN 203034795 U CN203034795 U CN 203034795U
Authority
CN
China
Prior art keywords
template
connecting hole
plate
strip
combined type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320051761
Other languages
Chinese (zh)
Inventor
张嘉敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd filed Critical ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd
Priority to CN 201320051761 priority Critical patent/CN203034795U/en
Application granted granted Critical
Publication of CN203034795U publication Critical patent/CN203034795U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a plate and strip combined type stand wall formwork. The plate and strip combined type stand wall formwork comprises plate-type formworks and strip-type formworks, the plate-type formworks and the strip-type formworks are arranged in sequence and at intervals in a combined mode, wherein no connecting hole is formed in the plate-type formworks, and a row of connecting holes are formed in each strip-type formwork in a small-spacing mode. Due to the adoption of the structure arrangement, the condition that extra holes are formed due to the fact that the plate and strip combined type stand wall formwork can not be installed corresponding to pull screw rods does not occur, the service life of the formwork can be effectively prolonged, and assembling speed of the formworks is improved.

Description

Strip combined type wall template
Technical field
The utility model relates to the locating template that a kind of concrete wall is built usefulness, is specially a kind of strip combined type wall template.
Background technology
Building in the process of concrete wall, wait that the both sides of building wall all need arrange corresponding locating template, and simultaneously in order to guarantee the bonding strength of two side templates, avoid fried mould phenomenon to take place, generally corresponding Screw arbor with nut at both-ends need be set at interval between two side templates.
At this, thickness because of wall, height and length can change according to actual needs, make the Screw arbor with nut at both-ends spacing distance that arranges between template also need change accordingly according to actual needs, and there is very big problem in this for present formwork structure, because of in the assembling process of template, what generally follow is the principle of platelet behind the earlier big plate, its structure as shown in Figure 1, comprise large form 1 ', middle template 2 ' and little template 3 ', need carry out the planning of template when assembling in advance calculates, it is cumbersome to construct, and be provided with on each locating template for connect connecting hole 11 to pull bar ', at this, with the connecting hole on the cope match-plate pattern with the template moulding, spacing distance is bigger, and different size template 1 ', 2 ', 3 ' on connecting hole layout and spacing distance difference very big, this cause Screw arbor with nut at both-ends in the practice of construction arrange at interval with template on the connecting hole spacing be difficult to corresponding, the connecting hole spacing distance is bigger than normal or less than normal to be occurred often, just need additionally to get out in template the connecting hole at required interval this moment, the connecting hole of Huo Deing not only can cause damage to template itself like this, the periphery of this connecting hole does not have the reinforcing rib setting yet simultaneously, the intensity of connecting hole itself is also very poor, the phenomenon of often bursting apart in the middle of reality is used.
The utility model content
At the problems referred to above, the utility model has designed a kind of strip combined type wall template, it is by making up the board-like template of the no connecting hole setting that arranges in regular turn at interval and forming with the belt template of a plurality of connecting holes, the spacing that arranges of Screw arbor with nut at both-ends be can adjust according to actual needs easily, calculating and assembling in the construction are very easy to.
At the problems referred to above, the utility model by the following technical solutions:
A kind of strip combined type wall template is characterized in that: comprise board-like template and belt template that space combination in regular turn arranges, wherein in the board-like template connecting hole is not set, then in closely spaced mode one row's connecting hole is set in the belt template.
Further, the spacing distance between the adjacent connecting hole of each of above-mentioned belt template equates.
Further, the spacing distance between the adjacent connecting hole of each of above-mentioned belt template is 5cm ~ 15cm.
Further, the distance of the optimal spacing between the adjacent connecting hole of each of above-mentioned belt template is 10cm.
Further, the width dimensions scope of above-mentioned board-like template is 40 cm ~ 100 cm.
The utility model in use, board-like template and the combination of belt template space arrange, because all templates only are made up of board-like template and the belt template of same size, in construction, need not to carry out the planning of metope size calculation and template, directly can carry out the combination of template installs, be very easy to construction, can effectively promote construction speed.
And the most important is, board-like template and the combination of belt template space arrange, and all connecting holes are all with being arranged on the belt template of arranging, and the spacing of each connecting hole equates and spacing distance is very little.Such topology layout for the adjustment of Screw arbor with nut at both-ends on the wall height, can be selected for use corresponding connecting hole that Screw arbor with nut at both-ends is installed and get final product according to the space requirement that arranges of Screw arbor with nut at both-ends in the practice of construction; And for the spacing distance adjustment of Screw arbor with nut at both-ends on the wall width, can select suitable board-like template width as required for use, with this spacing distance of adjusting connecting hole on the belt template of board-like template both sides, realize the spacing distance adjustment of Screw arbor with nut at both-ends on the wall width with this; Above gang form structure arranges, can not occur can effectively prolonging the application life of template because can't corresponding Screw arbor with nut at both-ends installation carrying out the situation of extra openings, and the effective assembling speed of climbing shuttering.
Description of drawings
The assembling schematic diagram of Fig. 1, existing wall template;
Fig. 2, assembling schematic diagram of the present utility model.
The specific embodiment
As shown in Figure 2, a kind of strip combined type wall template comprises board-like template 1 and belt template 2 that space combination in regular turn arranges, wherein in the board-like template 1 connecting hole is not set, then in closely spaced mode one row's connecting hole 21 is set in the belt template 2.
At this, be reply actual needs and convenient construction, the spacing distance between the adjacent connecting hole 21 of each of described belt template 2 equates, and the spacing distance scope between the adjacent connecting hole 21 is 5cm ~ 15cm.In practice, consider that the adjustment spacing of Screw arbor with nut at both-ends is generally the integral multiple of 10cm, the distance of the optimal spacing between each adjacent connecting hole 21 also is set to 10cm on the belt template 2 for this reason.
The width of described board-like template 1 is provided with a plurality of specifications, and its size range is 40 cm ~ 100 cm, selects the board-like template 1 of the specification that adapts in the middle of construction for use according to the spacing distance needs of Screw arbor with nut at both-ends on the wall width.
The utility model in use, board-like template 1 and the combination of belt template 2 spaces arrange, because all templates only are made up of board-like template 1 and the belt template 2 of same size, in construction, need not to carry out the planning of metope size calculation and template, directly can carry out the combination of template installs, be very easy to construction, can effectively promote construction speed.
And the most important is, board-like template 1 and the combination of belt template 2 spaces arrange, and all connecting holes 21 are all with being arranged on the belt template 2 of arranging, and the spacing of each connecting hole 21 equates and spacing distance is very little.Such topology layout provides great convenience for the setting of Screw arbor with nut at both-ends.
For the adjustment of Screw arbor with nut at both-ends on the wall height, can select for use corresponding connecting hole 21 that Screw arbor with nut at both-ends is installed and get final product according to the space requirement that arranges of Screw arbor with nut at both-ends in the practice of construction.And for the spacing distance adjustment of Screw arbor with nut at both-ends on the wall width, can select suitable board-like template 1 width as required for use, with this spacing distance of adjusting connecting hole 21 on the belt template 2 of board-like template 1 both sides, realize the spacing distance adjustment of Screw arbor with nut at both-ends on the wall width with this.
Above gang form structure arranges, and can not occur can effectively prolonging the application life of template, the assembling speed of climbing shuttering because can't corresponding Screw arbor with nut at both-ends being installed by the situation of carrying out extra openings.
The utility model structure is not only applicable to plastic formwork, is equally applicable to wooden form or metal form.
The above, it only is preferred embodiments of the present utility model, be not that the utility model is done any pro forma restriction, every foundation know-why of the present utility model still belongs in the scope of technical solutions of the utility model any simple modification, equivalent variations or modification that above embodiment does.

Claims (5)

1. a strip combined type wall template is characterized in that: comprise board-like template and belt template that space combination in regular turn arranges, wherein in the board-like template connecting hole is not set, then in closely spaced mode one row's connecting hole is set in the belt template.
2. strip combined type wall template as claimed in claim 1 is characterized in that: the spacing distance between the adjacent connecting hole of each of described belt template equates.
3. strip combined type wall template as claimed in claim 2, it is characterized in that: the spacing distance between the adjacent connecting hole of each of described belt template is 5cm ~ 15cm.
4. strip combined type wall template as claimed in claim 2 is characterized in that: the optimal spacing distance between the adjacent connecting hole of each of described belt template is 10cm.
5. as the described strip combined type of the arbitrary claim of claim 1-4 wall template, it is characterized in that: the width dimensions scope of described board-like template is 40 cm ~ 100 cm.
CN 201320051761 2013-01-30 2013-01-30 Plate and strip combined type stand wall formwork Expired - Lifetime CN203034795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320051761 CN203034795U (en) 2013-01-30 2013-01-30 Plate and strip combined type stand wall formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320051761 CN203034795U (en) 2013-01-30 2013-01-30 Plate and strip combined type stand wall formwork

Publications (1)

Publication Number Publication Date
CN203034795U true CN203034795U (en) 2013-07-03

Family

ID=48686929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320051761 Expired - Lifetime CN203034795U (en) 2013-01-30 2013-01-30 Plate and strip combined type stand wall formwork

Country Status (1)

Country Link
CN (1) CN203034795U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818843A (en) * 2015-04-20 2015-08-05 常州展华机器人有限公司 Large-scale shear wall drilling-free mounting template and use method
CN110295738A (en) * 2019-06-21 2019-10-01 中国一冶集团有限公司 Shear wall formwork structure and construction method
CN110388054A (en) * 2018-04-17 2019-10-29 江苏南通二建集团有限公司 One kind exempting from aperture building engineering structure template system and construction technology
CN110629788A (en) * 2019-09-20 2019-12-31 中国五冶集团有限公司 Installation method for pre-buried channel of comprehensive pipe gallery
CN111236623A (en) * 2020-01-17 2020-06-05 中国十七冶集团有限公司 Novel construction method for formwork reinforcement system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818843A (en) * 2015-04-20 2015-08-05 常州展华机器人有限公司 Large-scale shear wall drilling-free mounting template and use method
CN110388054A (en) * 2018-04-17 2019-10-29 江苏南通二建集团有限公司 One kind exempting from aperture building engineering structure template system and construction technology
CN110295738A (en) * 2019-06-21 2019-10-01 中国一冶集团有限公司 Shear wall formwork structure and construction method
CN110629788A (en) * 2019-09-20 2019-12-31 中国五冶集团有限公司 Installation method for pre-buried channel of comprehensive pipe gallery
CN111236623A (en) * 2020-01-17 2020-06-05 中国十七冶集团有限公司 Novel construction method for formwork reinforcement system

Similar Documents

Publication Publication Date Title
CN203034795U (en) Plate and strip combined type stand wall formwork
CN103029204B (en) Modularized side form for prefabricating superimposed sheet
CN206396939U (en) A kind of greening wall of live 3D printing
CN103465344A (en) Method for utilizing battery mould to manufacture zipper-type building wall board
CN104018622A (en) Reinforcement mesh easy to automatically produce for shear wall, production method of reinforcement mesh and formed shear wall
CN204174634U (en) A kind of wind-driven generator tower frame foundation structure
CN204402028U (en) Bayonet type stair construction gang form
CN203022338U (en) Concrete vertical wall pouring positioning template
CN203613717U (en) Steel reinforced beam column made of H-shaped section steel
CN102121308A (en) Template for buildings
CN203441099U (en) Molding device for frame column molding template
CN103206081B (en) Clamping fastening devices and clamping construction method
CN205637305U (en) Building block material unit and butt -joint structural thereof
CN203867048U (en) Window hole insulating and shaping module for energy-saving building
CN203626235U (en) Ribbed floor forming template, extension arm type template, edge mold and corner mold thereof
CN203028604U (en) Changeable antique shelf
CN203514680U (en) Slant wood-plastic side fascia
CN202416885U (en) Grating plate mounting spacing controller
CN204644850U (en) A kind of interchange steel bridge
CN203394026U (en) Combined building template
CN204914144U (en) Antidetonation light weight wallboard mould
CN103526879A (en) Concrete prefabricated part
CN204510790U (en) A kind of aluminum alloy building template of corner within the walls
CN203409759U (en) Movable sample plate for producing blind hole type shells
CN203684504U (en) Cross heat-preservation wall member

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Plate and strip combined type stand wall formwork

Effective date of registration: 20200521

Granted publication date: 20130703

Pledgee: Zhejiang Taizhou Huangyan Rural Commercial Bank Co.,Ltd.

Pledgor: ZHEJIANG KAIXIONG TECHNOLOGY Co.,Ltd.

Registration number: Y2020330000256

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130703