CN203034367U - Cable follow up device of flexibility compensation device of bridge cable - Google Patents

Cable follow up device of flexibility compensation device of bridge cable Download PDF

Info

Publication number
CN203034367U
CN203034367U CN 201320016254 CN201320016254U CN203034367U CN 203034367 U CN203034367 U CN 203034367U CN 201320016254 CN201320016254 CN 201320016254 CN 201320016254 U CN201320016254 U CN 201320016254U CN 203034367 U CN203034367 U CN 203034367U
Authority
CN
China
Prior art keywords
cable
parallel
limit row
bar
parallelogram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320016254
Other languages
Chinese (zh)
Inventor
王和平
林冶
黄春辉
陈红勇
陈声佩
宋发兴
李庆先
王日恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Hongyong
FUJIAN AGRICULTURAL MECHANIZATION INSTITUTE
Huang Chunhui
Wang Heping
Fujian Yongfu Power Engineering Co Ltd
Original Assignee
FUJIAN YONG FU PROJECT CONSULTANT Co Ltd
FUJIAN AGRICULTURAL MECHANIZATION INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN YONG FU PROJECT CONSULTANT Co Ltd, FUJIAN AGRICULTURAL MECHANIZATION INSTITUTE filed Critical FUJIAN YONG FU PROJECT CONSULTANT Co Ltd
Priority to CN 201320016254 priority Critical patent/CN203034367U/en
Application granted granted Critical
Publication of CN203034367U publication Critical patent/CN203034367U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a cable follow up device of a flexibility compensation device of a bridge cable. The device consists of parallelogram four-rod mechanisms, wherein the parallelogram four-rod mechanisms which are arranged symmetrically form a cable fixing frame, and a cable is fixed on the cable fixing frame to move with the parallelogram four-rod mechanisms. The device is simple in structure, convenient to install, reliable and capable of achieving whole compensation.

Description

A kind of cable hunting gear of the cable flexible compensation device of passing a bridge
Technical field
The utility model relates to a kind of gap bridge cable flexible compensation device, particularly a kind of cable hunting gear of the cable flexible compensation device of passing a bridge.
Background technology
The residing environment temperature of bridge with and load external conditions such as an operation of getting on the bus, wind, earthquake, can make the railway carriage or compartment beam of bridge produce flexible and distortion, thereby make the cable on the bridge that is laid in also and then produce dilatation.If cable flexible do not absorbed and compensate, cable will produce bending or bear excessive tension force because of excessive bending.This situation repeated multiple times takes place, and will cause cable to rupture.Therefore need compensate the flexible of cable, the compensation of adopting is at present mainly adopted snake laying stretching with the reply bridge with cable at bridge, its specific practice is: adopt big horizontal snake laying in the middle of the bridge, the device of the flexible compensation that is used for absorbing the cable telescopic variation is installed on the bridge expanssion joint both sides.But adopt horizontal snake laying compensation, compensation rate is limited on the one hand, on the other hand because the railway carriage or compartment beam of bridge is not only producing flexible and distortion along the pontic horizontal direction, and can make dislocation or the knuckle that produces vertical direction between the beam railway carriage or compartment, so the level compensation fundamentally solves the flexible problem of cable; Simultaneously, that existing gap bridge power cable flexible compensation device is installed is comparatively complicated, it is bigger to take the bridge installing space, and difficulty is bigger during the cable laying construction.
The utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art part, and provides a kind of can stretching to cable to carry out the cable hunting gear of a kind of cable flexible compensation device of passing a bridge comprehensive compensation, simple in structure.
A kind of cable hunting gear of the cable flexible compensation device of passing a bridge, include the parallelogram four-bar mechanism of two twenty percents, one cover, the parallel four limit row four-bar mechanisms of every suit include tandem two groups parallel four limit row four-bar mechanisms, the parallelogram four-bar mechanism of each group includes a pair of parallel four limit row four-bar mechanisms of the motion unanimity of symmetric arrays, the plane of movement of parallelogram four-bar mechanism is along the trend of track, arrange and be articulated in the same side of coaster or holder before and after two side links of each parallel four limit row four-bar mechanism, the motion that parallel four limit row four-bar mechanisms in one cover are done in opposite directions or deviated from mutually, parallel four limit row four-bar mechanisms, the two adjacent side links of group stretch out before and after in one cover, the extension of front and back group two symmetries is hinged on the same turning cylinder, described extension pin joint is higher than parallel four limit row four-bar mechanism connecting rods, described turning cylinder extends arrangement along the cross-sectional direction of track, described cable hunting gear also includes the fixed mount for the attached cable anchor clamps, this fixed mount is arranged along the track cross-section direction, be provided with the fixing hole that is used for fixing a plurality of cable cleats of many groups on fixed mount along the place of trend of track cross-section, described fixed mount is arranged at the pin joint place that parallel four limit row four-bar mechanisms are not done side link and the connecting rod of extension.
The cable hunting gear of the gap bridge cable flexible compensation device of this structure, in use, remaining all is hinged on the coaster with the form of front and back except not organizing with the parallelogram four-bar mechanism, described coaster refers to the dolly along track travel, when group does not then link on holder, and with cable be fixed in this device on, when the external condition of extraneous bridge changes, traction drives parallel four limit row four-bar mechanism motions, thereby the cable accompany movement that drives on it compensates accordingly.This cable hunting gear has simple in structurely, and maintenance maintenance is convenient, compensates accurate advantage.
In sum, the utility model following advantage compared to existing technology:
The cable hunting gear of gap bridge cable flexible compensation device of the present utility model has simple in structurely, easy for installation, and the reliability height can be realized the advantage of comprehensive compensation.
Description of drawings
Fig. 1 is the structural representation of the cable hunting gear of gap bridge cable flexible compensation device of the present utility model.
Fig. 2 is the structural representation of fixed mount.
Label declaration 1 parallel four limit row four-bar mechanisms, 11 side links, 12 connecting rods, 13 fixed mounts.
The specific embodiment
Be described in more detail below in conjunction with the utility model of embodiment.
Embodiment 1
A kind of cable hunting gear of the cable flexible compensation device of passing a bridge, include the parallelogram four-bar mechanism 1 of two twenty percents, one cover, the parallel four limit row four-bar mechanisms of every suit include tandem two groups parallel four limit row four-bar mechanisms, the parallelogram four-bar mechanism of each group includes a pair of parallel four limit row four-bar mechanisms of the motion unanimity of symmetric arrays, the plane of movement of parallelogram four-bar mechanism is along the trend of track, the same side of coaster or holder is arranged and be articulated in two side links, 11 front and back of each parallel four limit row four-bar mechanism, the motion that parallel four limit row four-bar mechanisms in one cover are done in opposite directions or deviated from mutually, parallel four limit row four-bar mechanisms, the two adjacent side links of group stretch out before and after in one cover, the extension of front and back group two symmetries is hinged on the same turning cylinder, described extension pin joint is higher than parallel four limit row four-bar mechanism connecting rods 12, described turning cylinder extends arrangement along the cross-sectional direction of track, described cable hunting gear also includes the fixed mount 13 for the attached cable anchor clamps, this fixed mount is arranged along the track cross-section direction, be provided with the fixing hole that is used for fixing a plurality of cable cleats of many groups on fixed mount along the place of trend of track cross-section, described fixed mount is arranged at the pin joint place that parallel four limit row four-bar mechanisms are not done side link and the connecting rod of extension.
It is same as the prior art that present embodiment is not stated part.

Claims (1)

1. cable hunting gear of cable flexible compensation device of passing a bridge, it is characterized in that: the parallelogram four-bar mechanism that includes two twenty percents, one cover, the parallel four limit row four-bar mechanisms of every suit include tandem two groups parallel four limit row four-bar mechanisms, the parallelogram four-bar mechanism of each group includes a pair of parallel four limit row four-bar mechanisms of the motion unanimity of symmetric arrays, the plane of movement of parallelogram four-bar mechanism is along the trend of track, arrange and be articulated in the same side of coaster or holder before and after two side links of each parallel four limit row four-bar mechanism, the motion that parallel four limit row four-bar mechanisms in one cover are done in opposite directions or deviated from mutually, parallel four limit row four-bar mechanisms, the two adjacent side links of group stretch out before and after in one cover, the extension of front and back group two symmetries is hinged on the same turning cylinder, described extension pin joint is higher than parallel four limit row four-bar mechanism connecting rods, described turning cylinder extends arrangement along the cross-sectional direction of track, described cable hunting gear also includes the fixed mount for the attached cable anchor clamps, this fixed mount is arranged along the track cross-section direction, be provided with the fixing hole that is used for fixing a plurality of cable cleats of many groups on fixed mount along the place of trend of track cross-section, described fixed mount is arranged at the pin joint place that parallel four limit row four-bar mechanisms are not done side link and the connecting rod of extension.
CN 201320016254 2013-01-14 2013-01-14 Cable follow up device of flexibility compensation device of bridge cable Expired - Fee Related CN203034367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320016254 CN203034367U (en) 2013-01-14 2013-01-14 Cable follow up device of flexibility compensation device of bridge cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320016254 CN203034367U (en) 2013-01-14 2013-01-14 Cable follow up device of flexibility compensation device of bridge cable

Publications (1)

Publication Number Publication Date
CN203034367U true CN203034367U (en) 2013-07-03

Family

ID=48686503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320016254 Expired - Fee Related CN203034367U (en) 2013-01-14 2013-01-14 Cable follow up device of flexibility compensation device of bridge cable

Country Status (1)

Country Link
CN (1) CN203034367U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105755955A (en) * 2016-04-25 2016-07-13 辽宁昊轩环保设备有限公司 Unidirectional expansion type horizontal rotating cable expansion device
CN108385518A (en) * 2018-03-13 2018-08-10 浙江华云电力工程设计咨询有限公司 One kind becoming expansion compensation device and its construction method with bridge cable is differential

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105755955A (en) * 2016-04-25 2016-07-13 辽宁昊轩环保设备有限公司 Unidirectional expansion type horizontal rotating cable expansion device
CN108385518A (en) * 2018-03-13 2018-08-10 浙江华云电力工程设计咨询有限公司 One kind becoming expansion compensation device and its construction method with bridge cable is differential
CN108385518B (en) * 2018-03-13 2023-09-08 浙江华云电力工程设计咨询有限公司 Bridge-following cable differential uniform-variation expansion compensation device and construction method thereof

Similar Documents

Publication Publication Date Title
CN103061257B (en) Bridge crossing cable expansion and contraction compensation device
CN103061256B (en) Bridge crossing cable expansion and contraction compensation device
CN103192842A (en) Side-rolling resisting device for magnetically levitated trains
CN203034367U (en) Cable follow up device of flexibility compensation device of bridge cable
CN102980807B (en) The load test approach of linear telescopic mechanism and device
CN203782554U (en) Compensation device for expansion joint of bridge cable
CN106098315A (en) A kind of power equipment installing mechanism
CN207234828U (en) A kind of anti-interference tele-control system host
CN205862937U (en) A kind of transformator installing mechanism
CN204008006U (en) A kind of pipeline internal force balance system
CN203034369U (en) Flexibility compensation device of bridge cable
CN203034364U (en) Flexibility compensation device of bridge cable
CN205509448U (en) Bridge cable telescoping device with drive bird function
CN202563799U (en) Device for subway pantograph simulation teaching
CN203511810U (en) Hydraulic telescopic caterpillar band under frame positioning structure
CN104929040A (en) Cable expansion and shrinkage device of cross-sea bridge
CN204150058U (en) A kind of low floor vehicle elastic hinge joint device that automatically can adjust rigidity
CN203034368U (en) Spring compensation device of flexibility compensation device of bridge cable
CN106057414B (en) A kind of transformer installing mechanism
CN203034365U (en) Lifting limiting mechanism of flexibility compensation device of bridge cable
CN201002530Y (en) Translation wrist arm supporting device
CN111424475B (en) Shock-absorbing device of aerial track structure
CN103243643A (en) Horizontal elastic damping device for bridge
CN204140741U (en) A kind of multidirectional damping heavier-duty laminated rubber spring
CN203958352U (en) A kind of driving cab rear suspension easy device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 350005 No. 61 middle 115, Gulou District, Fujian, Fuzhou

Patentee after: Fujian Agricultural Mechanization Institute

Patentee after: FUJIAN YONGFU POWER ENGINEERING CO., LTD.

Patentee after: Wang Heping

Patentee after: Huang Chunhui

Patentee after: Chen Hongyong

Address before: 350005 No. 61 middle 115, Gulou District, Fujian, Fuzhou

Patentee before: Fujian Agricultural Mechanization Institute

Patentee before: Fujian Yong Fu Project Consultant Co., Ltd.

Patentee before: Wang Heping

Patentee before: Huang Chunhui

Patentee before: Chen Hongyong

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20210114