CN203031203U CN 201320066334 CN201320066334U CN203031203U CN 203031203 U CN203031203 U CN 203031203U CN 201320066334 CN201320066334 CN 201320066334 CN 201320066334 U CN201320066334 U CN 201320066334U CN 203031203 U CN203031203 U CN 203031203U
Authority
CN
China
Prior art keywords
end plate
tower mast
pillar tower
pillar
right end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320066334
Other languages
Chinese (zh)
Inventor
魏可红
冯志刚
陈德刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Sunsing Metal Structure Group Co., Ltd.
Rui Nanjing Sanxin Machinery Equipment Manufacturing Co., Ltd of China
Original Assignee
HEBEI SUNSING METAL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI SUNSING METAL STRUCTURE CO Ltd filed Critical HEBEI SUNSING METAL STRUCTURE CO Ltd
Priority to CN 201320066334 priority Critical patent/CN203031203U/en
Application granted granted Critical
Publication of CN203031203U publication Critical patent/CN203031203U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of tower mast manufacturing machinery, and particularly relates to a three-pillar tower mast locating device. The technical scheme includes that the three-pillar tower mast locating device comprises a horizontal plane work platform, a left end plate and a right end plate are arranged at two ends of the work platform, one end plate is a fixed end plate, the other end plate can move through a control mechanism arranged on the end portion of the work platform, and three pairs of flange disc locating mechanisms are correspondingly arranged on the left end plate and the right end plate. According to the three-pillar tower mast locating device, locating of connecting flange discs which are used for forming three-pillar tower masts can be achieved, the connecting error between the connecting flange discs and the three-pillar tower mast can be largely lowered, interchange of the three-pillar tower masts forming a three-pillar tower can be achieved, quality parameters are ensured, and assembling efficiency is enabled to be greatly improved.

Description

A kind of three post tower mast positioners
Technical field
The utility model belongs to tower mast processing machinery technical field, relates in particular to a kind of three post tower mast positioners.
Background technology
Three post towers be by some sections as shown in Figure 1 three post tower masts of fixed length connect and compose.And each three post tower mast is made of the ring flange 4 of three pipes 1 that fixedly are triangular shape with the two ends welding that is connected stull 2 between these three pipes and diagonal brace 3 and each pipe.Wherein ring flange is connected to form three post towers for assembling between the three post tower masts.The preparation of present three post tower masts is the location of finishing three pipes, stull, diagonal brace and ring flanges by the mode of line, welding is fixing then, the uniformity of the depth of parallelism between three pipes of the very difficult assurance of the three post tower masts that utilize this mode to prepare, the position precision of ring flange and stull, diagonal brace.Therefore, not only mass parameter is difficult to guarantee but also the assembling difficulty is very big to utilize three relatively poor post tower masts of above-mentioned position precision and uniformity to assemble three post towers.
The utility model content
The purpose of this utility model just provides a kind of three post tower mast positioners that can guarantee that three pipes, stull, diagonal brace and ring flanges can accurately be located and uniformity is high.
For achieving the above object, the technical scheme that adopts of the utility model is:
A kind of three post tower mast positioners, structure comprises the horizontal plane workbench, is respectively arranged with left and right end plate at the two ends of this workbench, and wherein an end plate is fixed charge method end plate, and another end plate can move by the controlling organization that is arranged at the workbench end; Correspondence is provided with three pairs of ring flange detent mechanisms on described left and right end plate.
Constituting above-mentioned three post tower mast positioner additional technical features also comprises:
---described horizontal plane workbench is provided with described first member plate or right end plate displacement guide rail;
---described ring flange detent mechanism is fastener hole or the clamping mechanism corresponding with connecting hole on the ring flange.
A kind of three post tower mast positioners provided by the utility model compared with prior art, have the following advantages: one, this device constitutes by the horizontal plane workbench and at the left and right end plate that is arranged at two ends, this end plate is provided with three pairs of corresponding ring flange detent mechanisms, therefore can realize constituting the location of the mounting flange of three post tower masts, connecting error thus between the mounting flange of formed three post tower masts can reduce greatly; They are two years old, because the location can be realized by left and right end plate in three pipe positions that fixedly are triangular shape that constitute three post tower masts, therefore can improve three between pipe the depth of parallelism and the uniformity of stull, diagonal brace, therefore can realize constituting three post tower masts of three post towers exchange, guaranteed that mass parameter makes packaging efficiency improve greatly.
Description of drawings
Fig. 1 is the structural representation of three post tower masts;
Fig. 2 is the structural representation of three post tower mast positioners;
Fig. 3 is for constituting the structural representation of above-mentioned three post tower mast positioner end plates;
Fig. 4 is the tip plate configurations schematic diagram of above-mentioned tower mast positioner pipe location;
The specific embodiment
Be described in further detail below in conjunction with structure and the use principle of accompanying drawing to three post tower mast positioners provided by the utility model.
As shown in Figure 2, be the structural representation of three post tower mast positioners provided by the utility model.The structure of this device comprises the horizontal plane workbench 6 that is provided with guide rail 5, be respectively arranged with left and right end plate 7,8 at the two ends of this workbench, wherein right end plate is fixed charge method end plate, and first member plate can be implemented on the guide rail mobile by the screw mechanism 12 that is arranged at workbench 6 left parts; Correspondence is provided with three pairs of ring flange detent mechanisms 9 on left and right end plate 7,8, this ring flange detent mechanism 9 both can be corresponding 3-5 fastener holes 10 of the connecting hole with on the ring flange as shown in Figure 3, also can be the clamping mechanism that other can be fixing with ring flange.
When utilizing above-mentioned three post tower mast positioners to prepare three post tower masts, at first adjust left and right sides two end plates distance by screw mechanism, six ring flanges 9 are fixed on the left and right two end plates 7,8 by screw rod (or clamping mechanism) 11 respectively, pipe 1 cover with three formation three post tower masts is inserted on six ring flanges 9 (as shown in Figure 4) then, and carries out the fixedly welding between ring flange and pipe; And then constituting between three pipes of three post tower masts welding respectively fixedly stull 2 and diagonal brace 3.Thereby finish the preparation of three post tower masts.

Claims (3)

1. post tower mast positioner, it is characterized in that: structure comprises the horizontal plane workbench, be respectively arranged with left and right end plate at the two ends of this workbench, wherein an end plate is fixed charge method end plate, and another end plate can move by the controlling organization that is arranged at the workbench end; Correspondence is provided with three pairs of ring flange detent mechanisms on described left and right end plate.
2. a kind of three post tower mast positioners as claimed in claim 1, it is characterized in that: described horizontal plane workbench is provided with described first member plate or right end plate displacement guide rail.
3. a kind of three post tower mast positioners as claimed in claim 1 is characterized in that: described ring flange detent mechanism is fastener hole or the clamping mechanism corresponding with connecting hole on the ring flange.
CN 201320066334 2013-02-05 2013-02-05 Three-pillar tower mast locating device Expired - Fee Related CN203031203U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320066334 CN203031203U (en) 2013-02-05 2013-02-05 Three-pillar tower mast locating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320066334 CN203031203U (en) 2013-02-05 2013-02-05 Three-pillar tower mast locating device

Publications (1)

Publication Number Publication Date
CN203031203U true CN203031203U (en) 2013-07-03

Family

ID=48683345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320066334 Expired - Fee Related CN203031203U (en) 2013-02-05 2013-02-05 Three-pillar tower mast locating device

Country Status (1)

Country Link
CN (1) CN203031203U (en)

Similar Documents

Publication Publication Date Title
CN201685053U (en) Assembling device for welding combined components of angle-steel tower
CN203679545U (en) Automatic welding machine for numerical control radiator
CN104308666A (en) Machine tool machining center
CN203031203U (en) Three-pillar tower mast locating device
CN203282401U (en) Riveting jig
CN202591895U (en) Swinging and overlapping tool for supporting leg housing of automobile crane
CN203018276U (en) Alkaline battery sealing agent coating device
CN201815828U (en) Butt-welding tool set for engine room platform of wind power equipment
CN204449745U (en) A kind of wind-driven generator unit equipment kuppe fore-stock welding tooling
CN204019267U (en) A kind of machine tooling center
CN203471219U (en) Pipe tower tool
CN203621794U (en) Taper tower column and flange welding and positioning die
CN202639671U (en) Welding device for tower foot of transmission line iron tower
CN202726365U (en) Connecting lug installing and welding device for rack section of derrick
CN203380535U (en) Pipe tower flange plate pairing tool
CN203196829U (en) Adhesive dispensing unit in magnetic core assembling machine
CN202162480U (en) Accessory long hole tooling in wind power generation tower cylinder
CN201432253Y (en) Positioning device for steel storage tank assembly
CN203418256U (en) Centering, clamping and assembling integrated mechanism for H-type steel
CN204039506U (en) The positioning tool of building blocks screw rod when laser melting coating
CN203426578U (en) Multifunctional automatic welding device
CN204449735U (en) A kind of main platform carcasing in wind-driven generator unit equipment cabin frock
CN204448924U (en) A kind of wind-driven generator unit equipment cabin inner cable frame makes frock
CN204294683U (en) For processing the frock of steel tube tower cat ladder bearing
CN203806972U (en) Connection structure of crane beam and steel column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HEBEI SUNSING METAL STRUCTURE GROUP CO., LTD.

Free format text: FORMER NAME: HEBEI SUNSING METAL STRUCTURE CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 053500, Hengshui, Hebei province Jingxian County Guang Chuan Industrial Zone No. 28

Patentee after: Hebei Sunsing Metal Structure Group Co., Ltd.

Address before: 053500, Hengshui, Hebei province Jingxian County Guang Chuan Industrial Zone No. 28

Patentee before: Hebei Sunsing Metal Structure Co., Ltd.

ASS Succession or assignment of patent right

Owner name: NANJING GUORUI SANXIN MACHINERY MANUFACTURING CO.,

Effective date: 20140504

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140504

Address after: 053500, Hengshui, Hebei province Jingxian County Guang Chuan Industrial Zone No. 28

Patentee after: Hebei Sunsing Metal Structure Group Co., Ltd.

Patentee after: Rui Nanjing Sanxin Machinery Equipment Manufacturing Co., Ltd of China

Address before: 053500, Hengshui, Hebei province Jingxian County Guang Chuan Industrial Zone No. 28

Patentee before: Hebei Sunsing Metal Structure Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20180205