CN203013078U - Simulation training device for practical operation and construction of high pressure cable of power system - Google Patents
Simulation training device for practical operation and construction of high pressure cable of power system Download PDFInfo
- Publication number
- CN203013078U CN203013078U CN 201220632094 CN201220632094U CN203013078U CN 203013078 U CN203013078 U CN 203013078U CN 201220632094 CN201220632094 CN 201220632094 CN 201220632094 U CN201220632094 U CN 201220632094U CN 203013078 U CN203013078 U CN 203013078U
- Authority
- CN
- China
- Prior art keywords
- switch
- training device
- tension cable
- simulation training
- practical operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012549 training Methods 0.000 title claims abstract description 33
- 238000004088 simulation Methods 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 238000002955 isolation Methods 0.000 claims description 6
- 239000007787 solid Substances 0.000 abstract 1
- 230000009897 systematic effect Effects 0.000 abstract 1
- 238000013461 design Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000002474 experimental method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
Images
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The utility model discloses a power system training tool, specifically to a simulation training device for practical operation and construction of high pressure cables of a power system. The simulation training device comprises two switch cabinets (1), a work bench (2) between the two switch cabinets (1), knife cabinets (3) arranged on the bottom of the switch cabinets (1), and a simulation cable trench (4) arranged on the bottom of the work bench (2). The simulation training device is high in simulation degree. Based on actual equipment and combining training requirements, the simulation training device is designed to provide practical operation and simulation training for operators. Systematic, safe, convenient and highly simulative practice operation can be carried out by employees, which lays solid foundation for future on-site operation.
Description
Technical field
The utility model relates to a kind of Power system tranining instrument, is specifically related to the practical operation of a kind of electric system high-tension cable and construction simulation training device.
Background technology
Development along with the city, the application of electric system cable is more and more general, scale is increasing, the personnel that cable design, construction and operation are engaged in electric system also constantly increase, these personnel are trained targetedly very urgent, but in a lot of field of power owing to not having too much equipment or conciliation to carry out on-site training on the spot, therefore need to be in the mode of chamber by experiment to staffs training.But the experimental tool in the laboratory is all the principle of explaining electric equipment mostly at present, not specific aim training stronger, system makes the employee very limited in nonlocal practical operation experience, not only causes inefficiency, error rate is high, and has very large personal safety hidden danger.
The utility model content
The purpose of this utility model is to provide the practical operation of a kind of electric system high-tension cable and construction simulation training device, has solved at present to be used for the relatively poor problem of the staffs training specific aim of field of power.
for solving above-mentioned technical matters, the utility model is by the following technical solutions: the practical operation of a kind of electric system high-tension cable and construction simulation training device, comprise two switch cubicles, be provided with a worktable between two switch cubicles, the bottom of described switch cubicle is provided with the disconnecting link cabinet, the bottom of described worktable is provided with a dummycable ditch, be provided with auxiliary reclay in described switch cubicle, the experimental tool that power change-over switch and high-tension cable form, be provided with isolation switch in described disconnecting link cabinet, be provided with the high-tension cable passage in described dummycable ditch, described high-tension cable is connected with the high-tension cable passage by isolation switch, the shop front of described switch cubicle is provided with switch deciliter button, electromagnetic lock and electrification display.
Further technical scheme is that coil, electromagnetic lock and the electrification display of above-mentioned auxiliary reclay is parallel with one another under the alternating voltage of 220V, described switch deciliter button is connected with the coil of auxiliary reclay, and the first normally opened contact of auxiliary reclay is in parallel with the X button in switch deciliter button, the second normally opened contact of auxiliary reclay is connected with electromagnetic lock, and the 3rd normally opened contact of auxiliary reclay is connected with electrification display.
Further technical scheme is that the rear portion of above-mentioned worktable is erect the working rules panel is arranged.
Compared with prior art, the beneficial effects of the utility model are: highly anti-true, practical operation and construction simulation training device design in conjunction with the requirement of training take physical device as the basis, can realize the operation training to personnel, to workmen's simulation training; Can allow the employee receive simulated effect system, high and comparatively safe practice easily, for formal operation is on the spot later on taken a firm foundation.
Description of drawings
Fig. 1 is the structural representation of the utility model electric system high-tension cable practical operation and an embodiment of construction simulation training device.
Fig. 2 is switch cubicle in Fig. 1, disconnecting link cabinet and dummycable ditch open mode structural representation.
Fig. 3 is the circuit connection diagram of the utility model electric system high-tension cable practical operation and another embodiment of construction simulation training device.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explaining the utility model, and be not used in restriction the utility model.
Fig. 1 and Fig. 2 show an embodiment of the utility model electric system high-tension cable practical operation and construction simulation training device: the practical operation of a kind of electric system high-tension cable and construction simulation training device, comprise two switch cubicles 1, be provided with a worktable 2 between two switch cubicles 1, the bottom of described switch cubicle 1 is provided with disconnecting link cabinet 3, the bottom of described worktable 2 is provided with a dummycable ditch 4, be provided with auxiliary reclay 5 in described switch cubicle 1, the experimental tool that power change-over switch 6 and high-tension cable 8 form, be provided with isolation switch 9 in described disconnecting link cabinet 3, be provided with the high-tension cable path 10 in described dummycable ditch 4, described high-tension cable 8 is connected with the high-tension cable path 10 by isolation switch 9, the shop front of described switch cubicle 1 is provided with switch deciliter button 11, electromagnetic lock 12 and electrification display 13.
Fig. 3 shows a preferred embodiment of the utility model electric system high-tension cable practical operation and construction simulation training device, the coil of auxiliary reclay 5, electromagnetic lock 12 and electrification display 13 are parallel with one another under the alternating voltage of 220V, connect with the coil of auxiliary reclay 5 in the contact 111 that opens of described switch deciliter button 11, and the first normally opened contact 51 of auxiliary reclay 5 is in parallel with the pass closed contact 112 in switch deciliter button 11, the second normally opened contact 52 of auxiliary reclay 5 is connected with electromagnetic lock 12, the 3rd normally opened contact 53 of auxiliary reclay 5 is connected with electrification display 13.
According to a preferred embodiment of the utility model electric system high-tension cable practical operation and construction simulation training device, erect at the rear portion of worktable 2 working rules panel 14.Although this is the simulation training device, but use press to remain belongs to high voltage, and the danger that careless manipulation also can occur getting an electric shock is so be necessary to arrange working rules panel 14 on worktable 2, faulty operation is avoided in the place that reminding employees should be noted that.
The utility model can be realized following each experiment:
Cable system practical operation training: correctly divide, close isolating switch, disconnector; Judge whether reliable disjunction of switch according to electrification display, open and close the ring main unit door; Correct use electroscope self-checking electrical equipment intact, with electroscope detect on power frequency high voltage generator electroscope intact, electroscope is identified true no-voltage on cable end; Correctly install the cable type ground wire on cable end, guarantee personnel's safety.
Cable construction operation training: the title and conforming to that work ticket is write that should check in detail the cable marker board before work; Confirm isolating switch, disconnector open position, and hang " No switching on, circuit have the people to work " nameplate, confirm that grounding switch (ground wire) at closing position, correctly arranges fence.
The searching and cut-off training of failure cable: confirm that breaking point conscientiously examines the Actual path that cut-offs cable, determine the identification breaking point of cable according to the actual conditions of reconfiguration cable.
Although with reference to a plurality of explanatory embodiment of the present utility model, the utility model is described here, but, should be appreciated that, those skilled in the art can design a lot of other modification and embodiments, and these are revised and within embodiment will drop on the disclosed principle scope and spirit of the application.More particularly, in the scope of, accompanying drawing open in the application and claim, can carry out multiple modification and improvement to building block and/or the layout of subject combination layout.Except modification that building block and/or layout are carried out with improving, to those skilled in the art, other purposes will be also obvious.
Claims (3)
1. electric system high-tension cable practical operation and construction simulation training device, it is characterized in that: comprise two switch cubicles (1), be provided with a worktable (2) between two switch cubicles (1), the bottom of described switch cubicle (1) is provided with disconnecting link cabinet (3), the bottom of described worktable (2) is provided with a dummycable ditch (4), be provided with auxiliary reclay (5) in described switch cubicle (1), the experimental tool that power change-over switch (6) and high-tension cable (8) form, be provided with isolation switch (9) in described disconnecting link cabinet (3), be provided with high-tension cable passage (10) in described dummycable ditch (4), described high-tension cable (8) is connected with high-tension cable passage (10) by isolation switch (9), the shop front of described switch cubicle (1) is provided with switch deciliter button (11), electromagnetic lock (12) and electrification display (13).
2. electric system high-tension cable according to claim 1 practical operation and construction simulation training device, it is characterized in that: the coil of described auxiliary reclay (5), electromagnetic lock (12) and electrification display (13) are parallel with one another under the alternating voltage of 220V, connect with the coil of auxiliary reclay (5) in the contact (111) that opens of described switch deciliter button (11), and first normally opened contact (51) of auxiliary reclay (5) is in parallel with the pass closed contact (112) in switch deciliter button (11), second normally opened contact (52) of auxiliary reclay (5) is connected with electromagnetic lock (12), the 3rd normally opened contact (53) of auxiliary reclay (5) is connected with electrification display (13).
3. electric system high-tension cable according to claim 1 practical operation and construction simulation training device is characterized in that: erect at the rear portion of described worktable (2) working rules panel (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220632094 CN203013078U (en) | 2012-11-27 | 2012-11-27 | Simulation training device for practical operation and construction of high pressure cable of power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220632094 CN203013078U (en) | 2012-11-27 | 2012-11-27 | Simulation training device for practical operation and construction of high pressure cable of power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203013078U true CN203013078U (en) | 2013-06-19 |
Family
ID=48604650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220632094 Expired - Lifetime CN203013078U (en) | 2012-11-27 | 2012-11-27 | Simulation training device for practical operation and construction of high pressure cable of power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203013078U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105243938A (en) * | 2015-11-05 | 2016-01-13 | 国网福建省电力有限公司 | Switch cabinet test system and test method |
CN110456158A (en) * | 2019-09-16 | 2019-11-15 | 国网河南省电力公司平顶山供电公司 | A kind of method for preventing induced electricity from hurting sb.'s feelings when measurement circuit power frequency parameter |
-
2012
- 2012-11-27 CN CN 201220632094 patent/CN203013078U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105243938A (en) * | 2015-11-05 | 2016-01-13 | 国网福建省电力有限公司 | Switch cabinet test system and test method |
CN110456158A (en) * | 2019-09-16 | 2019-11-15 | 国网河南省电力公司平顶山供电公司 | A kind of method for preventing induced electricity from hurting sb.'s feelings when measurement circuit power frequency parameter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205139322U (en) | Handcart -type circuit breaker analogue test appearance | |
CN203013078U (en) | Simulation training device for practical operation and construction of high pressure cable of power system | |
CN103840559A (en) | Looped network outdoor station fault simulator and fault simulation method thereof | |
CN108089144A (en) | Electronic current mutual inductor field calibration system and method | |
CN204046179U (en) | A kind of intelligent Coal Mine Power Distribution System comprehensive experimental device | |
CN104867387B (en) | A kind of experimental teaching unit for being used to simulate the Principles of Relay Protection that rail hands over electric power system | |
CN104092226B (en) | Intelligent Coal Mine Power Distribution System comprehensive experimental device | |
CN103345872A (en) | Residual current action protecting system practical training device | |
CN204359903U (en) | A kind of control cables Insulation test auxiliary tank | |
CN204167723U (en) | Based on the high-tension switch cabinet of electrification indicating circuit | |
CN106199300A (en) | A kind of method of testing of low current neutral grounding system fault route selecting device | |
CN206292365U (en) | Relay protection operation case actuating of relay characteristic tester and its automatic wire-changing device | |
CN102856113A (en) | Electric locking circuit of maintenance backdoor of high-voltage power distribution cabinet | |
CN102707117A (en) | Relaying multifunctional tester | |
CN202171890U (en) | Relay protection test simulation apparatus | |
CN103197127A (en) | Grounding step voltage detecting method and grounding step voltage detecting device of high-voltage equipment of switch gear room of converting station | |
CN203164278U (en) | Transformer substation switch chamber high-voltage equipment grounding step voltage detecting device | |
CN104299356A (en) | Portable electric power test personal safety protection system | |
CN204203383U (en) | Testing apparatus | |
CN103077644A (en) | Split-phase breaker hydraulic operation mechanism training device | |
CN209472274U (en) | A kind of pull-out type low-voltage metering mechanism and low-voltage metering cabinet | |
CN205091986U (en) | Cubical switchboard testing system | |
CN203589490U (en) | Electric control cabinet interlocking board and electric control cabinet | |
CN207184040U (en) | A kind of protection device of EPS emergency power supply cabinets master row insulating trouble accumulator electric leakage | |
CN206293667U (en) | Become the anti-error isolating device of electric terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130619 |