CN203011669U - A testing device used for researching an interference rule between marine stand pipes under a top tension effect - Google Patents

A testing device used for researching an interference rule between marine stand pipes under a top tension effect Download PDF

Info

Publication number
CN203011669U
CN203011669U CN 201320020797 CN201320020797U CN203011669U CN 203011669 U CN203011669 U CN 203011669U CN 201320020797 CN201320020797 CN 201320020797 CN 201320020797 U CN201320020797 U CN 201320020797U CN 203011669 U CN203011669 U CN 203011669U
Authority
CN
China
Prior art keywords
articulated joint
support
testing device
base plate
hinge connectors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320020797
Other languages
Chinese (zh)
Inventor
郭海燕
王飞
李效民
孟凡顺
刘景伟
李莹
牛建杰
赵伟
殷文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ocean University of China
Original Assignee
Ocean University of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ocean University of China filed Critical Ocean University of China
Priority to CN 201320020797 priority Critical patent/CN203011669U/en
Application granted granted Critical
Publication of CN203011669U publication Critical patent/CN203011669U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model relates to a testing device used for researching an interference rule between marine stand pipes under a top tension effect. The testing device mainly comprises a support, stand pipe models, hinge connectors, and pulleys. The pulleys are fixed on the top of the support. The hinge connectors comprise top hinge connectors and bottom hinge connectors. The bottoms of the stand pipe models are connected with the bottom hinge connectors. The tops of the stand pipe models are connected with the top hinge connectors. Screw columns are mounted on the top plates of the top hinge connector. The testing device is characterized in that preformed holes are disposed on the top and the base plate of the support, that the top of the screw column passes through the preformed hole on the top of the support and is connected with a steel strand, that the steel strand is wound on the pulleys and is connected with a counterweight, that the bottom hinge connectors are fixed on the base plate of the support through screw columns and the preformed holes on the base plate. The testing device is capable of effectively achieving hinge connection and applying top tension and is capable of well simulating an engineering reality by changing the arranging manner and the distance of the stand pipe models in a marine stand pipe interference rule test. Therefore, accurate test data and a conclusion are obtained.

Description

A kind of test unit for research top tension force effect Ocean standpipe interference law
Technical field
The utility model belongs to marine riser facility laying technology field, is specifically related to a kind of test unit for research marine riser interference law.
Background technology
Marine riser is the main web member between ocean platform and subsea wellheads, is mainly used in transporting fluid, and guiding probing or oil well overhaul instrument and pipeline enter oil well etc.As a kind of contact channel in sea and seabed, can be used for fixed platform, floating platform and probing boats and ships etc.Pipeline between each ocean platform and subsea wellheads is all numerous, generally has multiple arrangement form, as in tandem, arrange and interlaced arrangement etc. shoulder to shoulder, when having circulation out-of-date, standpipe can be subject to the impact of other standpipe wake flows, and the interference between standpipe occurs.Due to the existence of interfering, make the form that comes off of kinematic behavior, dynamic response and the whirlpool of standpipe compare all with single standpipe larger variation can occur.And marine riser is mostly for delivery of combustible and explosive articles such as oil, rock gases, in case failure will cause serious environmental pollution and secondary disaster.Therefore, marine riser is carried out the experimental study of interference law, seem extremely necessary.
In the working condition of reality, the upper end of marine riser is connected with the slippage joint of platform or bottom of ship, the lower end is connected with subsea wellheads by universal joint, when platform or boats and ships move under wave action, standpipe has enough degree of freedom to move thereupon, and at platform or boats and ships, its length occurs to change when vertically shaking.Meanwhile, marine riser or the important component part of mooring system can be used as the support active redundancy pipeline.Therefore, when the interference test of carrying out marine riser, connected mode and top tension force are two factors must considering.
But interfere in test at the marine riser that carries out at present, often well model engineering is actual, makes the conclusion that draws not have cogency.The problem that exists in process of the test mainly contains: stem joint mostly is fixed, is not hinged; Though standpipe is tensioning state, can not adjusts and measure the size of top tension force; With in once testing, do not have or seldom study for spacing and the arrangement mode of standpipe.
The utility model content
The purpose of this utility model is to overcome above shortcomings in existing experimental technique, and a kind of device that more meets the interference test of marine riser working condition is provided, thereby has improved the accuracy that marine riser is interfered test.
A kind of test unit for research top tension force effect Ocean standpipe interference law mainly comprises support, riser model, articulated joint and pulley; Pulley is fixed in the top of support; Articulated joint comprises articulated joint and lower articulated joint, and the lower end of riser model is connected with lower articulated joint, and the upper end of riser model connects upper articulated joint; On the top board of upper articulated joint, double-screw bolt is installed, it is characterized in that: be respectively arranged with preformed hole on the top of support and base plate, the preformed hole that a top of the trellis is passed in the upper end of double-screw bolt connects steel strand wires, and steel strand wires are walked around pulley and are connected with balancing weight; Lower articulated joint is fixed on the base plate of support by the preformed hole on screw and base plate.
Through verification experimental verification, that device of the present utility model can be realized effectively is hinged, apply top tension force, and can be by arrangement mode and the spacing of change riser model in the test of marine riser interference law, well model engineering is actual, thereby draws test figure and conclusion accurately.
Description of drawings
Fig. 1 is the front view of the test unit of the marine riser interference law under research of the present utility model top tension force effect;
Fig. 2 is the stereographic map of Fig. 1;
Fig. 3 is the stereo amplification figure of upper articulated joint in Fig. 1.
Embodiment
Embodiment 1 as shown in Figure 1, a kind of test unit for research top tension force effect Ocean standpipe interference law mainly comprises support 2, riser model 5, pulley 1 and articulated joint; Pulley 1 is fixed in the top of support 2; Articulated joint comprises articulated joint 4 and lower articulated joint 6; The lower end of riser model 5 is connected with lower articulated joint 6, and the upper end of riser model 5 connects upper articulated joint 5; On the top board 14 of upper articulated joint 4, double-screw bolt is installed, the screw thread specification of double-screw bolt and the perforate on top board 14 match, and tighten and make its end to expose the bottom surface of top board 14, then select the nut of appropriate size again to tighten.
As shown in Figure 2, be provided with preformed hole on the top of support 2 and base plate 7, be respectively vertical preformed hole 11 and horizontal preformed hole 12.
The preformed hole at support 2 tops is passed in the upper end of double-screw bolt, curves crotch, is connected with an end of steel strand wires; Steel strand wires are walked around pulley, and the other end is connected with balancing weight 3.
As shown in Figure 2, the structure of lower articulated joint 6 and upper articulated joint 4 are just the same, during installation, upper articulated joint 4 are inverted, and are lower articulated joint 6; Pass preformed hole on the support base plate and the perforate on lower articulated joint top board with screw, lower articulated joint 6 is fixed on the base plate of support.
Riser model 5 refers to generally select steel pipe, copper pipe and pvc pipe etc. according to the material of experiment condition and the determined suitable simulation vortex-induced vibration of marine riser rule of scale model; The two ends of this riser model 5 are connected with the standpipe connecting hole of upper articulated joint 4, lower articulated joint 6 respectively.
Described pulley is 4, and pulley 1a, 1b are one group, and pulley 1c, 1d are one group; These two groups of pulleys respectively with riser model 5b and 5a, and articulated joint consists of two systems that apply top tension force.
As shown in Figure 3, upper articulated joint comprises footstock part, bearing cross and base portion; Footstock partly comprises top board 14, bearing seat I15 and bearing 18; Top board 14 center perforates are also ploughed silk, and during test, connecting stud also applies pulling force in the top, thereby realize applying the function of top tension force; Bearing seat I15 top is connected with top board 14, and the bottom perforate is also established draw-in groove, embeds bearing 18;
The bearing cross comprises bearing bracket stand I16 and bearing bracket stand II17; The two ends of bearing bracket stand I16, bearing bracket stand II17 are slightly thinner than center section, can just pass bearing; Center section overstriking and the perforate of bearing bracket stand I make bearing bracket stand II17 just pass and to block, and consist of " ten " font; Bearing bracket stand I16 is connected with bearing seat II19, and bearing bracket stand II17 is connected with bearing seat I15; The major function of bearing cross is to make the footstock part can rotate freely with base portion, thereby realizes hinged function fully.
Base portion comprises base 20, bearing seat II19 and bearing 18; Bearing seat II19 bottom is connected with base 20, and the top perforate is also established draw-in groove, embeds bearing 18; The function of bearing seat II19 is identical with the function of bearing seat I15; Open pipe connecting hole 21 in the bottom surface of base 20 and plough silk; Standpipe connecting hole 21 is connected with the riser model 5 of selecting.
The test unit of the research top tension force effect that the is used for Ocean standpipe interference law of embodiment 2 the present embodiment, basic identical with the apparatus structure of embodiment 1, difference only is: lower articulated joint 6 does not comprise top board 14, directly the screw of the bearing seat I15 of lower articulated joint and the preformed hole on the support base plate is fixed together with screw.Adopt this kind mode, can make lower articulated joint more firm with being connected of support.
As shown in Figure 2, adopt the test unit of above-described embodiment 1 when carrying out marine riser interference experimental study, need to use respectively at the two ends of riser model articulated joint 4 and lower articulated joint 6, and lower articulated joint 6 is fixed on the base plate 7 of test bracket.By constantly applying the top tension force of known dimensions, change the size of outflow and spacing and the arrangement mode of riser model, use the method for testing of strainometer and grating fibers, the interference law of marine riser is studied.
1, according to testing requirements and model scale, select suitable riser model (as copper pipe), then plough silk in its end, two ends, make its screw thread can be respectively match and tighten with the screw thread of the standpipe connecting hole 21 of upper articulated joint 4 and lower articulated joint 6;
2, according to the result of numerical simulation, locate along riser model with regard to the key point of signals collecting, evenly paste foil gauge along 90 ° of directions, and lead-in wire is connected with signal pickup assemblies such as dynamic resistance strain instruments;
3, the screw thread specification of double-screw bolt with to conform to the perforate of top board 14, tighten and make its end to expose the bottom surface of top board 14, then select the nut of appropriate size again to tighten; The upper end of double-screw bolt is passed respectively vertical preformed hole 11, the horizontal preformed hole 12 of a top of the trellis and curved crotch, be connected with an end of steel strand wires; Steel strand wires are walked around pulley, and the other end is connected with balancing weight;
4, according to the result of numerical simulation, in the upper end of outflow incoming flow direction, locate and lay doppler flowmeter, be used for the flow velocity of the real time measure outflow;
5, system assembles complete after, according to test condition, system debugs to signal acquiring system, top tension force application system, outflow mensuration.After each system works is normal, apply outflow.After treating that outflow is stable, add or reduce the balancing weight of known weight, can reach the effect that applies top tension force.
6, after the test under corresponding levels outflow condition is completed, according to the measurement result of doppler flowmeter, regulate the outflow flow velocity to next stage, then change top tension force, follow this workflow, until the interference off-test of this spacing and arrangement mode.
7, the spacing between longitudinally preformed hole 11 change riser model 5a, 5b, the position of moving respectively pulley 1b and 1c according to the position of riser model, follow procedures 5 and 6 flow process, complete the interference test of riser model longitudinal arrangement successively.
8, along the horizontal spacing between preformed hole 12 change riser model 5a, 5b, the position of moving respectively pulley 1a and 1b according to the position of riser model, follow procedures 5 and 6 flow process, complete the interference test that standpipe is arranged shoulder to shoulder successively.
9, the data that test gathered are processed, and the rule that the marine riser under the different outflows of research and top tension force effect is interfered test is reached a conclusion.
In whole system, because plurality of positions need to be boxed out, ploughed silk and complement one another, when testing preparation, need to according to test condition, need be designed for uniformity and process the size of perforate and the specification of screw thread in advance, to reach good test effect.

Claims (1)

1. a test unit of studying top tension force effect Ocean standpipe interference law, mainly comprise support, riser model, articulated joint and pulley; Pulley is fixed in the top of support; Articulated joint comprises articulated joint and lower articulated joint, and the lower end of riser model is connected with lower articulated joint, and the upper end of riser model connects upper articulated joint; On the top board of upper articulated joint, double-screw bolt is installed, it is characterized in that: be respectively arranged with preformed hole on the top of support and base plate, the preformed hole that a top of the trellis is passed in the upper end of double-screw bolt connects steel strand wires, and steel strand wires are walked around pulley and are connected with balancing weight; Lower articulated joint is fixed on the base plate of support by the preformed hole on screw and base plate.
CN 201320020797 2013-01-05 2013-01-05 A testing device used for researching an interference rule between marine stand pipes under a top tension effect Expired - Fee Related CN203011669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320020797 CN203011669U (en) 2013-01-05 2013-01-05 A testing device used for researching an interference rule between marine stand pipes under a top tension effect

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320020797 CN203011669U (en) 2013-01-05 2013-01-05 A testing device used for researching an interference rule between marine stand pipes under a top tension effect

Publications (1)

Publication Number Publication Date
CN203011669U true CN203011669U (en) 2013-06-19

Family

ID=48603252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320020797 Expired - Fee Related CN203011669U (en) 2013-01-05 2013-01-05 A testing device used for researching an interference rule between marine stand pipes under a top tension effect

Country Status (1)

Country Link
CN (1) CN203011669U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103105281A (en) * 2013-01-05 2013-05-15 中国海洋大学 Test device used for researching marine riser interference laws under top tension ratio effect
CN104062092A (en) * 2014-07-09 2014-09-24 中国船舶重工集团公司第七○二研究所 Measurement mechanism in ship model spiral arm tests
CN107560811A (en) * 2017-08-16 2018-01-09 中国海洋石油总公司 A kind of double standpipe vortex-induced vibration research experiment vertical tube fixing devices

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103105281A (en) * 2013-01-05 2013-05-15 中国海洋大学 Test device used for researching marine riser interference laws under top tension ratio effect
CN104062092A (en) * 2014-07-09 2014-09-24 中国船舶重工集团公司第七○二研究所 Measurement mechanism in ship model spiral arm tests
CN104062092B (en) * 2014-07-09 2016-08-24 中国船舶重工集团公司第七○二研究所 Measuring mechanism in ship model rotating arm experiment
CN107560811A (en) * 2017-08-16 2018-01-09 中国海洋石油总公司 A kind of double standpipe vortex-induced vibration research experiment vertical tube fixing devices

Similar Documents

Publication Publication Date Title
CN202033164U (en) Testing device capable of simulating uniform-flow vortex-induced vibration of submarine pipeline
CN102607787A (en) Method for testing influences of internal flow to dynamic property of marine risers
CN102147321A (en) Uniform flow vortex-induced vibration simulation tester for seabed pipeline
US9476292B2 (en) Deepwater drilling condition based marine riser mechanical behavior test simulation system and test method
CN103105281A (en) Test device used for researching marine riser interference laws under top tension ratio effect
EP2886788A2 (en) Riser fatigue monitoring
CN102620898A (en) System for applying internal flow and top tension force in marine riser vortex induced vibration test
CN103674479B (en) Non-smooth surface fluid friction resistance measurement device and method of testing
CN209623995U (en) A kind of anchoring system simulator of towing basin
CN105222969B (en) Inclination angle ladder incoming marine riser vortex swashs ginseng and swashs coupled vibrations experimental rig
CN203011669U (en) A testing device used for researching an interference rule between marine stand pipes under a top tension effect
CN110031166A (en) Uniform flow and platform move lower marine riser well head system bridge response to forced vibration device
CN105203297B (en) The vortex vibration testing device of marine riser beam space arrangement can be changed
CN202599635U (en) System for applying internal flow and top tension in marine riser vortex-induced vibration test
Tan et al. Numerical calculation model investigation on response for connector assembly of a free-standing hybrid riser with experimental validation
CN104990686A (en) Testing apparatus of multi-span submarine pipeline vortex-induced vibration on vertical uniform incoming flow condition
CN205175639U (en) Single riser vortex -induced vibration testing device of even incoming flow condition deep sea tensioning formula in inclination
CN104359700B (en) FPSO (Floating Production Storage and Offloading System) crude oil transportation system coupling property testing method
CN105067210B (en) The stepped inlet flow conditions deep-sea tensioned risers beam vortex vibration testing device in inclination angle
CN110031169A (en) Simulate two-tube interference dynamic response experimental provision under oblique uniform flow effect
CN105973553B (en) A kind of experimental system of the soil body-seabed multispan pipeline-ocean current multi- scenarios method effect
CN105203280A (en) Testing device for local flow rate increasing vertical incoming flow multi-span seabed pipeline vortex-induced vibration
CN105203283B (en) Variable vortex vibration testing device is arranged in local velocity increase vertical tube space
Ba Analysis of mooring and steel catenary risers system in ultra deepwater
Xiao et al. Experimental and numerical investigation on hydrodynamic behavior of a long curved pipeline system with multiple floating bodies in immersion construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130619

Termination date: 20140105