CN203011141U - Novel reactor core testing furnace - Google Patents

Novel reactor core testing furnace Download PDF

Info

Publication number
CN203011141U
CN203011141U CN 201220726770 CN201220726770U CN203011141U CN 203011141 U CN203011141 U CN 203011141U CN 201220726770 CN201220726770 CN 201220726770 CN 201220726770 U CN201220726770 U CN 201220726770U CN 203011141 U CN203011141 U CN 203011141U
Authority
CN
China
Prior art keywords
reactor core
hearth
burner hearth
furnace
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220726770
Other languages
Chinese (zh)
Inventor
孙再洪
韩敏芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Hua Tsing Power Sci & Tech Co Ltd
Original Assignee
Suzhou Hua Tsing Power Sci & Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hua Tsing Power Sci & Tech Co Ltd filed Critical Suzhou Hua Tsing Power Sci & Tech Co Ltd
Priority to CN 201220726770 priority Critical patent/CN203011141U/en
Application granted granted Critical
Publication of CN203011141U publication Critical patent/CN203011141U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a novel reactor core testing furnace which comprises a support and a hearth. The hearth is mounted on the support and is divided into two opposite halves, the two halves of the hearth are mounted on guide rails of the support by pulleys, and a hollow cavity is formed after the hearth is closed. The novel reactor core testing furnace has the advantages that the hearth is of the oppositely divided structure, the two halves of the hearth can be conveniently pulled towards two sides along the guide rails by the aid of the pulleys arranged on the lower side of the hearth, operators can simultaneously operate the novel reactor core testing furnace in front of the furnace and behind the furnace after the hearth is opened, operation space is effectively expanded for the operators, damage to a reactor core due to narrow space or frequent movement is prevented, and the work efficiency is improved.

Description

Novel reactor core test furnace
Technical field
The utility model relates to a kind of testing equipment, particularly a kind of novel reactor core test furnace.
Background technology
The reactor core test furnace is the device of measuring fuel battery performance, mainly comprises burner hearth, pressue device, aerating system and temperature program(me) initialization system.
As shown in Figure 1, the fire door 11 of the reactor core test furnace of prior art is the angle open type, namely by hinge or hinge, fire door 11 sides are positioned on burner hearth 12, thereby can only unidirectional unlatching fire door 11, the operating space is comparatively narrow and small, putting into and all comparatively inconvenience of the correction of taking-up and test process of reactor core 13 is easily to battery cause damage (such as cracked etc.).Therefore, how to improve the operating space of reactor core test furnace, improve test accuracy and the security of battery reactor core, become the problem that needs solution.
The utility model content
For solving the problems of the technologies described above, the utility model provides a kind of novel reactor core test furnace, improving operating space and operation accuracy, security, and guarantees product quality.
For achieving the above object, the technical solution of the utility model is as follows:
A kind of novel reactor core test furnace comprises support and is arranged on burner hearth on described support that described burner hearth is divided into the two halves of splitting, and the described burner hearth of two halves all is arranged on the guide rail of described support by pulley; Form cavity after described burner hearth closure.
Pass through technique scheme, the novel reactor core test furnace that the utility model provides, it is set to opening structure by burner hearth, and by pulley is set to facilitate burner hearth to pull open to both sides along guide rail below burner hearth, burner hearth is opened rear operating personnel and can be operated simultaneously in the forward and backward side of stove, effectively enlarged operating personnel's operating space, avoided because narrow space or the frequent mobile infringement that brings to battery have improved operating efficiency.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, the below will do to introduce simply to the accompanying drawing of required use in embodiment or description of the Prior Art.
Fig. 1 is the fire door mounting structure schematic diagram of a kind of reactor core test furnace of prior art;
Fig. 2 is the structural representation of the burner hearth of the disclosed novel reactor core test furnace of embodiment when closed;
Fig. 3 is the structural representation of the burner hearth of the disclosed novel reactor core test furnace of embodiment when opening.
Numeral in figure:
11. fire door 12. burner hearth 13. reactor core 21. supports
22. burner hearth 23. pulley 24. guide rails
The specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described.
With reference to figure 2 and 3, the novel reactor core test furnace that the utility model provides, comprise support 21 and be arranged on burner hearth 22 on support 21, burner hearth 22 is divided into the two halves of splitting, two halves burner hearth 22 all is arranged on the guide rail 24 of support 21 by pulley 23, form cavity after burner hearth 22 is closed, reactor core 13 is placed in cavity.
the novel reactor core test furnace that the utility model provides, it is by being set to burner hearth 22 to opening structure, and by pulley 23 is set to facilitate burner hearth 22 to pull open to both sides along guide rail 24 below burner hearth 22, then after being positioned over reactor core 13 on support 21, can be wrapped in reactor core 13 in the cavity of burner hearth 22 by closed both sides burner hearth 22 and test, the burner hearth 22 of can opening to both sides after complete to be tested takes out or mobile reactor core 13 with convenient, and burner hearth 22 is opened rear operating personnel can be before stove, rear side operates simultaneously, effectively enlarged operating personnel's operating space, avoided because narrow space or the frequent mobile infringement that brings to reactor core, improved operating efficiency.
Multiple modification to these embodiment will be apparent concerning those skilled in the art, and General Principle as defined herein can be in the situation that do not break away from spirit or scope of the present utility model, realization in other embodiments.

Claims (1)

1. a novel reactor core test furnace, is characterized in that, comprises support and be arranged on burner hearth on described support, and described burner hearth is divided into the two halves of splitting, and the described burner hearth of two halves all is arranged on the guide rail of described support by pulley; Form cavity after described burner hearth closure.
CN 201220726770 2012-12-26 2012-12-26 Novel reactor core testing furnace Expired - Fee Related CN203011141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220726770 CN203011141U (en) 2012-12-26 2012-12-26 Novel reactor core testing furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220726770 CN203011141U (en) 2012-12-26 2012-12-26 Novel reactor core testing furnace

Publications (1)

Publication Number Publication Date
CN203011141U true CN203011141U (en) 2013-06-19

Family

ID=48602730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220726770 Expired - Fee Related CN203011141U (en) 2012-12-26 2012-12-26 Novel reactor core testing furnace

Country Status (1)

Country Link
CN (1) CN203011141U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108253791A (en) * 2018-03-21 2018-07-06 东莞深圳清华大学研究院创新中心 It is a kind of for test fuel cell to blow-on
CN108253791B (en) * 2018-03-21 2024-04-30 广东清大创新研究院有限公司 Split furnace for testing fuel cell

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108253791A (en) * 2018-03-21 2018-07-06 东莞深圳清华大学研究院创新中心 It is a kind of for test fuel cell to blow-on
CN108253791B (en) * 2018-03-21 2024-04-30 广东清大创新研究院有限公司 Split furnace for testing fuel cell

Similar Documents

Publication Publication Date Title
CN203449184U (en) Metallographic specimen clamp
CN203011141U (en) Novel reactor core testing furnace
CN204809670U (en) Put cabinet operation panel in can be convertible
CN201935573U (en) Opening device of furnace door
CN202734552U (en) Industrial furnace door with automatic uncovering function
CN203480089U (en) Four-point-fixed optical cable connection cabinet bottom seat door with latch
CN206071357U (en) A kind of type of push and pull up down door for ageing oven
CN203723225U (en) Hog house and high skylight device thereof
CN202989239U (en) Adjustable wind shield for austenite furnace opening
CN203434467U (en) Sun-shading rainproof power distribution cabinet
CN205384660U (en) Cubical switchboard computer door locking control device
CN202647842U (en) Two-door furnace door
CN216981220U (en) Capacitance compensation cabinet with reinforced transparent window
CN207052956U (en) A kind of packaging low-voltage electrical cabinet
CN205420484U (en) Modular heat treatment furnace insulated door
CN204514964U (en) A kind of automatic test tool frame
CN205178301U (en) Shutdown circuit breaker cabinet
CN203605709U (en) Protective device for lead smelting furnace
CN102943170B (en) Adjustable wind shielding plate for austenite furnace mouth
CN202993736U (en) Draw device for refrigerator drawer
CN203036731U (en) Automatic induction device
CN203462882U (en) Concealed-type hinge for environmental-control power distribution cabinet
CN202804011U (en) Protection mechanism of punching machine panel
CN203526022U (en) Hinged flip oven
CN202007689U (en) Unloading-type non-pressure air door

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130619

Termination date: 20141226

EXPY Termination of patent right or utility model