CN203010579U - Hybrid power boiler burning using coal water slurry and natural gas - Google Patents

Hybrid power boiler burning using coal water slurry and natural gas Download PDF

Info

Publication number
CN203010579U
CN203010579U CN 201220585260 CN201220585260U CN203010579U CN 203010579 U CN203010579 U CN 203010579U CN 201220585260 CN201220585260 CN 201220585260 CN 201220585260 U CN201220585260 U CN 201220585260U CN 203010579 U CN203010579 U CN 203010579U
Authority
CN
China
Prior art keywords
burner
water slurry
natural gas
boiler
coal water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220585260
Other languages
Chinese (zh)
Inventor
姜贵利
邴彩霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao sea heat energy Limited by Share Ltd
Original Assignee
Qingdao Haizhong Environmental Protection Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haizhong Environmental Protection Boiler Co Ltd filed Critical Qingdao Haizhong Environmental Protection Boiler Co Ltd
Priority to CN 201220585260 priority Critical patent/CN203010579U/en
Application granted granted Critical
Publication of CN203010579U publication Critical patent/CN203010579U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a hybrid power boiler burning using coal water slurry and natural gas. The hybrid power boiler comprises a boiler body, a coal water slurry burner, an arch-furnace wall and a convection bank, wherein a combustion chamber is arranged in the boiler body, and the arch-furnace wall and the convection bank are arranged at one side of the combustion chamber in the boiler body. The hybrid power boiler also comprises a fuel gas burner, wherein the fuel gas burner and the coal water slurry burner are respectively arranged on the front wall of the combustion chamber. Through the fuel gas burner, the defect that the existing boiler can only use the coal water slurry as a fuel is overcome, and the application range of the boiler is increased.

Description

The hybrid boiler of combusting coal water slurry and natural gas
Technical field
The utility model relates to boiler plant, relates in particular to a kind of combusting coal water slurry and natural gas hybrid boiler.
Background technology
At present, the operation principle of boiler normally by fuel in the combustion chamber of boiler internal combustion, with the heating liquid that holds in boiler.When needs provide power by boiler to the user, heating liquid is become steam, the driving power device running; When needs provided heat energy by boiler to the user, the liquid after heating or the vapor transmission of generation were carried out heat supply in heat supply pipeline.Water-coal-slurry is widely used in boiler as a kind of clean energy resource.Coal water slurry boiler of the prior art generally includes the parts such as burner, combustion chamber, smoke wall and heat-transfer surface, by burning in the combustion chamber that water-coal-slurry is injected to boiler, the liquid in the boiler heat exchange face is heated.Water coal slurry burner contains the igniter of light diesel fuel or combustion gas, to ensure normally catching fire of water-coal-slurry.As from the foregoing, the use water-coal-slurry that in prior art, boiler can only be single acts as a fuel, and by the metabolic water coal slurry, the liquid in boiler is heated.Therefore, in prior art, the scope of application of boiler is narrower.
Summary of the invention
Technical problem to be solved in the utility model is: a kind of combusting coal water slurry and natural gas hybrid boiler are provided, solve the narrower defective of the scope of application of boiler of the prior art, increase the scope of application of boiler.
The technical scheme that the utility model provides is, a kind of combusting coal water slurry and natural gas hybrid boiler, comprise body of heater, water coal slurry burner, smoke wall and convection bank, be provided with the combustion chamber in described body of heater, a side that is positioned at described combustion chamber in described body of heater is provided with described smoke wall and described convection bank, also comprises gas burner; Described gas burner and described water coal slurry burner are separately positioned on the front wall of described combustion chamber.
The hybrid boiler of combusting coal water slurry as above and natural gas, in order to put easily coal water slurry fired burner after lighting gas burner, described gas burner is arranged on the below of described coal water slurry fired burner.
The hybrid boiler of combusting coal water slurry as above and natural gas, in order to put more effective, more accurately coal water slurry fired burner, described gas burner center line should be parallel with described coal water slurry fired burner center line.
The hybrid boiler of combusting coal water slurry as above and natural gas, in order to facilitate to the gas burner transport gas, described gas burner inside is installed with the natural gas trunk line, described natural gas trunk line one end and outside natural gas line link together, and the other end is installed with the gas burner nozzle.
The hybrid boiler of combusting coal water slurry as above and natural gas, in order conveniently to light gas burner, described gas burner nozzle place is provided with igniter.
The combusting coal water slurry that the utility model provides and natural gas hybrid boiler, by add gas burner on the front wall of combustion chamber, make boiler from adopting single water-coal-slurry to act as a fuel, become simultaneously metabolic water coal slurry and coal gas or the Mobyneb boiler of metabolic water coal slurry or coal gas separately, increased the scope of application of boiler.By adding gas burner, solved the defective that existing boiler can only use water-coal-slurry to act as a fuel; By gas burner being arranged on the below of water coal slurry burner, can put easily coal water slurry fired burner after lighting gas burner; By making the gas burner center line parallel with the coal water slurry fired burner center line, can put more effective, more accurately coal water slurry fired burner; By in gas burner inside, the natural gas trunk line being set, can be easily to the gas burner transport gas; By at gas burner nozzle place set-point firearm, can light easily gas burner
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, the below will do one to the accompanying drawing of required use in embodiment or description of the Prior Art and introduce simply, apparently, accompanying drawing in the following describes is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the front view of the hybrid boiler embodiment of the utility model combusting coal water slurry and natural gas.
The specific embodiment
For the purpose, technical scheme and the advantage that make the utility model embodiment clearer, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1, the hybrid boiler of the present embodiment combusting coal water slurry and natural gas, comprise body of heater 1, water coal slurry burner 2, smoke wall 3 and convection bank 4, be provided with combustion chamber 5 in body of heater, a side that is positioned at combustion chamber 5 in body of heater 1 is provided with smoke wall 3 and convection bank 4, also comprise gas burner 6, gas burner 6 and water-coal-slurry combustion 2 burners are separately positioned on 5 front walls of combustion chamber.
Particularly, add gas burner 6 on the front wall of combustion chamber 5, make boiler from adopting single water-coal-slurry to act as a fuel, become simultaneously metabolic water coal slurry and coal gas or the Mobyneb boiler of metabolic water coal slurry or coal gas separately, increased the scope of application of boiler.
Further, gas burner 6 is arranged on the below of coal water slurry fired burner 2.Concrete, when water-coal-slurry and natural gas use simultaneously, light gas burner 6, when the temperature in combustion chamber 5 reaches 800 ℃ of left and right, because hot gas rises, this moment the nozzle (not illustrating) by coal water slurry fired burner 2 to the combustion chamber 5 injection water coal slurries, just can put combusting coal water slurry, thereby can realize 5 internal combustion water-coal-slurry and the natural gases in the combustion chamber; Gas burner 6 can also replace light diesel fuel or the gas ignition device in coal water slurry fired burner 2, thereby has simplified coal water slurry fired burner 2 structures.
Based on technique scheme, optional, the center line of gas burner 6 is parallel with the center line of coal water slurry fired burner 2.Concrete, make the center line of gas burner 6 parallel with coal water slurry fired burner 2 center lines, can make the nozzle (not illustrating) of the more close coal water slurry fired burner 2 of nozzle (not illustrating) of gas burner 6, thus more effective, put coal water slurry fired burner 2 more accurately.
Further, the inside of gas burner 6 is installed with natural gas trunk line (not illustrating), and natural gas trunk line one end and outside natural gas line link together, and the other end is installed with gas burner nozzle (not illustrating).Concrete, the natural gas trunk line the interior setting of gas burner 6 is connected with outside natural gas line can facilitate the conveying of natural gas, guarantees the normal operation of boiler.
Further, gas burner 6 nozzle places (not illustrating) are provided with igniter (not illustrating).Concrete, by set-point firearm (not illustrating), can light easily gas burner 6.
The hybrid boiler of the present embodiment combusting coal water slurry and natural gas by adding gas burner, has solved the defective that existing boiler can only use water-coal-slurry to act as a fuel; By gas burner being arranged on the below of water coal slurry burner, can put easily coal water slurry fired burner after lighting gas burner; By making the gas burner center line parallel with the coal water slurry fired burner center line, can put more effective, more accurately coal water slurry fired burner; By in gas burner inside, the natural gas trunk line being set, can be easily to the gas burner transport gas; By at gas burner nozzle place set-point firearm, can light easily gas burner.
It should be noted that at last: above embodiment only in order to the technical solution of the utility model to be described, is not intended to limit; Although with reference to previous embodiment, the utility model is had been described in detail, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution break away from the spirit and scope of each embodiment technical scheme of the utility model.

Claims (5)

1. the hybrid boiler of a combusting coal water slurry and natural gas, comprise body of heater, water coal slurry burner, smoke wall and convection bank, be provided with the combustion chamber in described body of heater, a side that is positioned at described combustion chamber in described body of heater is provided with described smoke wall and described convection bank, it is characterized in that, also comprise gas burner; Described gas burner and described water coal slurry burner are separately positioned on the front wall of described combustion chamber.
2. the hybrid boiler of combusting coal water slurry according to claim 1 and natural gas, is characterized in that, described gas burner is arranged on the below of described coal water slurry fired burner.
3. the hybrid boiler of combusting coal water slurry according to claim 1 and natural gas, is characterized in that, described gas burner center line is parallel with described coal water slurry fired burner center line.
4. the hybrid boiler of combusting coal water slurry according to claim 1 and natural gas, it is characterized in that, described gas burner inside is installed with the natural gas trunk line, and described natural gas trunk line one end and outside natural gas line link together, and the other end is installed with the gas burner nozzle.
5. the hybrid boiler of combusting coal water slurry according to claim 1 and natural gas, is characterized in that, described gas burner nozzle place is provided with igniter.
CN 201220585260 2012-11-08 2012-11-08 Hybrid power boiler burning using coal water slurry and natural gas Expired - Fee Related CN203010579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220585260 CN203010579U (en) 2012-11-08 2012-11-08 Hybrid power boiler burning using coal water slurry and natural gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220585260 CN203010579U (en) 2012-11-08 2012-11-08 Hybrid power boiler burning using coal water slurry and natural gas

Publications (1)

Publication Number Publication Date
CN203010579U true CN203010579U (en) 2013-06-19

Family

ID=48602168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220585260 Expired - Fee Related CN203010579U (en) 2012-11-08 2012-11-08 Hybrid power boiler burning using coal water slurry and natural gas

Country Status (1)

Country Link
CN (1) CN203010579U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109058978A (en) * 2018-09-29 2018-12-21 青岛特利尔环保股份有限公司 Double fuel boiler system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109058978A (en) * 2018-09-29 2018-12-21 青岛特利尔环保股份有限公司 Double fuel boiler system

Similar Documents

Publication Publication Date Title
CN108106008B (en) A kind of Multi-stage heating type heat conducting oil boiler and its method
CN103344036A (en) Biogas boiler combustion system
CN203010579U (en) Hybrid power boiler burning using coal water slurry and natural gas
CN102692073A (en) Smokeless hot-water boiler
KR20170023689A (en) Burner burner system using pyrolysis
CN206094067U (en) Biofuel oil burner
CN204268574U (en) The direct-fired warmer of bellows
KR100725329B1 (en) Ignition device for fuel combustion apparatus using steam
CN203893403U (en) Novel vertical pipeless alcohol-based fuel boiler
CN201909310U (en) Combined boiler of coal-burning and oil/ gas-burning boilers with double boiler barrel
CN203940608U (en) A kind of horizontal gas-fired boiler
CN204786411U (en) Biography fire system of gas electric fan heater
CN102032554B (en) Coal water slurry and coal water slurry powder combusting hybrid boiler
CN204611758U (en) A kind of gas burner
CN203893176U (en) Vaporizing device of alcohol-group fuel boiler
CN204026669U (en) Long flame burner
CN202868989U (en) Thermal oil furnace with common heat sources of high temperature flue gas and fuel gas
CN203836956U (en) Boiler combustion-supporting device
CN206905273U (en) A kind of anti-coking
CN205279041U (en) Small -size circulating fluidized bed boiler
CN202647730U (en) Water coke slurry combustion device
CN204943437U (en) Split steam boiler
CN2911520Y (en) High efficiency water circulation water heater using fuel and gas
CN206488312U (en) A kind of New-type boiler
CN201875691U (en) Hybrid power boiler for burning coal water slurry and industrial waste gas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: QINGDAO HAIZHONG HEAT ENERGY CO., LTD.

Free format text: FORMER NAME: QINGDAO HAIZHONG ENVIRONMENTAL PROTECTION BOILER CO., LTD.

CP03 Change of name, title or address

Address after: The 266314 Shandong Economic Zone City in Qingdao province Jiaozhou City Madian Jiaolai town blue manufacturing

Patentee after: Qingdao sea heat energy Limited by Share Ltd

Address before: Ma Dian Zhen Dong Xiao Tun Cun Jiaozhou, Shandong city of Qingdao province 266000

Patentee before: Qingdao Haizhong Environmental Protection Boiler Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130619

Termination date: 20141108

EXPY Termination of patent right or utility model