CN203008929U CN 201220730174 CN201220730174U CN203008929U CN 203008929 U CN203008929 U CN 203008929U CN 201220730174 CN201220730174 CN 201220730174 CN 201220730174 U CN201220730174 U CN 201220730174U CN 203008929 U CN203008929 U CN 203008929U
Authority
CN
China
Prior art keywords
section
arch
lining
subway
lining structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220730174
Other languages
Chinese (zh)
Inventor
裴利华
石太伟
林东
杨均
周华龙
曾新平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN 201220730174 priority Critical patent/CN203008929U/en
Application granted granted Critical
Publication of CN203008929U publication Critical patent/CN203008929U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a subway double-line undermining method tunnel lining structure which comprises an arch crown and an arch bottom, wherein the arch crown and the arch bottom are connected in an end-to-end mode, the cross section of the arch crown is in a semicircle shape, the cross section of the arch bottom is in a semi-oval shape, and both the arch crown and the arch bottom are a composite type lining which is formed by a preliminary bracing and a secondary lining. Due to the fact that structural styles of the cross section of the tunnel lining are optimized, structural stress of an operation period is improved, the lining structure can bear water and soil load and other additional loads, the size of the cross section of the structure can be reduced as much as possible, the quantity of reinforcement of the lining structure can be decreased, and construction cost is reduced.

Description

Subway two-wire hidden construction process tunnel lining structure
Technical field
The utility model relates to tunnel-like, refers to particularly a kind of subway two-wire hidden construction process tunnel lining structure.
Background technology
Subway tunnel must first excavate out corresponding space when construction, then build therein lining cutting.Following characteristics are arranged: 1. be subjected to the impact of engineering geology and hydrogeological conditions larger during constructing tunnel; 2. work under hard conditions, work plane is few and narrow, poor working environment; 3. hidden construction process Construction on Ground impact is less, but embeddingly may cause land subsidence when more shallow; 4. there are a large amount of roach, rubble to deal carefully with.
The selection of job practices should be take geology, landform and ambient conditions and buried depth as Main Basis, and wherein having material to job practices is buried depth.Embedding more shallow engineering is first dug foundation ditch or trench from ground during construction, build backfill again after lining cutting, Here it is cut and cover method.
After buried depth surpassed certain limit, cut and cover method was no longer applicable, and will use hidden construction process instead.Hidden construction process is under given conditions, does not excavate ground, all at the underground method for tunnel construction that excavates and build liner structure.Hidden construction process mainly comprises: drilling and blasting method, shield method, tunnel boring machine method, shallow burial hidden digging, pipe jacking method, immersed tunnelling method etc.Wherein especially use comparatively extensive with shallow burial hidden digging and shield method.
Subway two-wire hidden construction process tunnel adopts the u-shaped cross-section structural shape usually, and this section vault is comprised of multi-section circular arc, and section is more flat, under the water and soil load action, can cause operation phase structure stress unfavorable.If satisfy the requirement of structure stress, general increasing cross dimensions and the increasing structural reinforcement of needing.Do like this, not only can increase difficulty of construction, and can increase construction costs.
Summary of the invention
The purpose of this utility model will overcome the existing deficiency of prior art exactly, and the subway two-wire hidden construction process tunnel lining structure that a kind of structure stress is even, construction costs is lower is provided.
For achieving the above object, the subway two-wire hidden construction process tunnel lining structure that the utility model is designed comprises end to end vault and encircles at the end that the section of vault is semicircle, the section at the arch end is half elliptic, and vault and the arch end consist of composite lining by preliminary bracing and secondary lining.
In such scheme, also be provided with mid-board in the tunnel.Like this, tunnel lining structure is stressed more firm.
Preferably, the semicircular diameter of vault section equals to encircle the half elliptic major axis of end section.Like this, satisfying under the structure stress requirement, the structure section size is minimum, and the liner structure quantity of reinforcement is minimum.
The beneficial effects of the utility model are: by optimizing the tunnel lining section configuration, improve operation phase structure stress, both guaranteed that liner structure can bear the effect of water and soil load and other imposed load, reduce as far as possible again the structure section size and reduce the liner structure quantity of reinforcement, reduce construction costs.Form of fracture of the present utility model can be widely used in subway two-wire hidden construction process tunnel structure.
Description of drawings
Fig. 1 is the structural representation that subway two-wire hidden construction process tunnel lining structure is installed.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Subway two-wire hidden construction process tunnel lining structure as shown in Figure 1 comprises end to end vault 1 and encircles at the end 2, also is provided with mid-board 5 in the tunnel.The section of vault 1 is semicircle, and the section that encircles the end 2 is half elliptic.The semicircular diameter of vault 1 section equals the half elliptic major axis of 2 sections at the bottom of described arch.Vault 1 and the arch end 2, consist of composite linings by preliminary bracing 3 and secondary lining 4.
During the construction of subway two-wire bored tunnel, first During Initial Stage Construction supporting 3; When possessing the execution conditions of secondary lining 4, carry out Second Lining Construction, fill at the bottom of the secondary liner structure at the construction arch end 2 and tunnel, then utilize the secondary liner structure of formwork jumbo construction vault 1; When Second Lining Construction is completed or possess the condition of construction mid-board 5, carry out mid-board 5 constructions.
The utility model is by optimizing tunnel lining section structure and secondary liner structure form, improve operation phase structure stress, both guaranteed that liner structure can bear the effect of water and soil load and other imposed load, reduce as far as possible again the structure section size and reduce the liner structure quantity of reinforcement, reduce construction costs.Form of fracture of the present utility model can be widely used in subway two-wire hidden construction process tunnel structure.

Claims (3)

1. subway two-wire hidden construction process tunnel lining structure, comprise end to end vault (1) and encircle at the end (2), it is characterized in that: the section of described vault (1) is for semicircle, at the bottom of described arch, the section of (2) is half elliptic, and described vault (1) and the arch end (2) consist of composite lining by preliminary bracing (3) and secondary lining (4).
2. subway two-wire hidden construction process tunnel lining structure according to claim 1, is characterized in that: also be provided with mid-board (5) in described tunnel.
3. subway two-wire hidden construction process tunnel lining structure according to claim 1, is characterized in that: the half elliptic major axis of (2) section at the bottom of the semicircular diameter of described vault (1) section equals described arch.
CN 201220730174 2012-12-26 2012-12-26 Subway double-line undermining method tunnel lining structure Expired - Lifetime CN203008929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220730174 CN203008929U (en) 2012-12-26 2012-12-26 Subway double-line undermining method tunnel lining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220730174 CN203008929U (en) 2012-12-26 2012-12-26 Subway double-line undermining method tunnel lining structure

Publications (1)

Publication Number Publication Date
CN203008929U true CN203008929U (en) 2013-06-19

Family

ID=48600535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220730174 Expired - Lifetime CN203008929U (en) 2012-12-26 2012-12-26 Subway double-line undermining method tunnel lining structure

Country Status (1)

Country Link
CN (1) CN203008929U (en)

Similar Documents

Publication Publication Date Title
CN110219654B (en) Advanced construction method for side pilot tunnel of mud-rock arch tunnel
CN103758123B (en) The construction method of manually digging hole filling pile retaining wall lining
CN101775988B (en) Method for constructing from inclined shaft to main tunnel in weak surrounding rock
CN102182472B (en) Backfill repairing method for tunnel collapse cavity
CN104763433A (en) Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum
CN104074529A (en) A continuous double-shell reinforcement method for deep roadways and chambers
CN105298499A (en) Excavation deviation processing method of raise-boring machine for deep vertical shaft
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN102660955B (en) Quick construction method for foundation pit slope support
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN105822311A (en) In-situ extension construction structure and method for extra-large-section tunnel with opening formed inside to enlarge working face
CN102606168A (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN102182464A (en) Construction structure and construction method of channel structure
CN105041327B (en) Bored tunnel is counter to dig shield method of reseptance
CN109853399A (en) Big section for arch bridge tilts tunnel type skewback structure and its construction method
JP2010255237A (en) Method and structure for tunnel reinforcement
CN105909262B (en) A kind of bored tunnel driving method
CN103939115B (en) A kind of method of half shallow mining method hangar tunnel and structure
CN102733390A (en) Method for removing underground waste anchor cable/anchor rod
CN204311456U (en) Foundation ditch strengthening structure
KR20110019674A (en) G.w foundation reinforcement method
CN204099720U (en) The protective housing that under soil stone combination geological condition, artificial pipe jacking construction method is used
CN105545315A (en) Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN205778882U (en) Inside opening increases the Super-large-section tunnel enlarging constructing structure in situ of the scope of operation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180521

Address after: 650206 Kunming, Guandu, Yunnan province Guandu town Guangfu Road 5349, Yinhai Cherry Blossom happiness square F

Co-patentee after: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY SIYUAN GROUP SOUTHWEST SURVEY AND DESIGN Co.,Ltd.

Address before: 430063 No. 745, Ping Yuan Road, Yangyuan, Wuchang, Wuhan, Hubei

Patentee before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130619