CN203008929U - Subway double-line undermining method tunnel lining structure - Google Patents
Subway double-line undermining method tunnel lining structure Download PDFInfo
- Publication number
- CN203008929U CN203008929U CN 201220730174 CN201220730174U CN203008929U CN 203008929 U CN203008929 U CN 203008929U CN 201220730174 CN201220730174 CN 201220730174 CN 201220730174 U CN201220730174 U CN 201220730174U CN 203008929 U CN203008929 U CN 203008929U
- Authority
- CN
- China
- Prior art keywords
- section
- arch
- lining
- subway
- lining structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220730174 CN203008929U (en) | 2012-12-26 | 2012-12-26 | Subway double-line undermining method tunnel lining structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220730174 CN203008929U (en) | 2012-12-26 | 2012-12-26 | Subway double-line undermining method tunnel lining structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203008929U true CN203008929U (en) | 2013-06-19 |
Family
ID=48600535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220730174 Expired - Lifetime CN203008929U (en) | 2012-12-26 | 2012-12-26 | Subway double-line undermining method tunnel lining structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203008929U (en) |
-
2012
- 2012-12-26 CN CN 201220730174 patent/CN203008929U/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110219654B (en) | Advanced construction method for side pilot tunnel of mud-rock arch tunnel | |
CN103758123B (en) | The construction method of manually digging hole filling pile retaining wall lining | |
CN101775988B (en) | Method for constructing from inclined shaft to main tunnel in weak surrounding rock | |
CN102182472B (en) | Backfill repairing method for tunnel collapse cavity | |
CN104763433A (en) | Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum | |
CN104074529A (en) | A continuous double-shell reinforcement method for deep roadways and chambers | |
CN105298499A (en) | Excavation deviation processing method of raise-boring machine for deep vertical shaft | |
CN105041333A (en) | Method for treating tunnel collapse through dugand covered method | |
CN102660955B (en) | Quick construction method for foundation pit slope support | |
CN102505704A (en) | Large open caisson construction method in soft geological shaft | |
CN105822311A (en) | In-situ extension construction structure and method for extra-large-section tunnel with opening formed inside to enlarge working face | |
CN102606168A (en) | Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation | |
CN208965598U (en) | The Anti-seeping technology structure of grout curtain and underground chamber intersection area | |
CN102182464A (en) | Construction structure and construction method of channel structure | |
CN105041327B (en) | Bored tunnel is counter to dig shield method of reseptance | |
CN109853399A (en) | Big section for arch bridge tilts tunnel type skewback structure and its construction method | |
JP2010255237A (en) | Method and structure for tunnel reinforcement | |
CN105909262B (en) | A kind of bored tunnel driving method | |
CN103939115B (en) | A kind of method of half shallow mining method hangar tunnel and structure | |
CN102733390A (en) | Method for removing underground waste anchor cable/anchor rod | |
CN204311456U (en) | Foundation ditch strengthening structure | |
KR20110019674A (en) | G.w foundation reinforcement method | |
CN204099720U (en) | The protective housing that under soil stone combination geological condition, artificial pipe jacking construction method is used | |
CN105545315A (en) | Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction | |
CN205778882U (en) | Inside opening increases the Super-large-section tunnel enlarging constructing structure in situ of the scope of operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180521 Address after: 650206 Kunming, Guandu, Yunnan province Guandu town Guangfu Road 5349, Yinhai Cherry Blossom happiness square F Co-patentee after: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd. Patentee after: CHINA RAILWAY SIYUAN GROUP SOUTHWEST SURVEY AND DESIGN Co.,Ltd. Address before: 430063 No. 745, Ping Yuan Road, Yangyuan, Wuchang, Wuhan, Hubei Patentee before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130619 |