CN202988575U - Double-cable bivalve anti-leakage grab bucket - Google Patents

Double-cable bivalve anti-leakage grab bucket Download PDF

Info

Publication number
CN202988575U
CN202988575U CN 201220635580 CN201220635580U CN202988575U CN 202988575 U CN202988575 U CN 202988575U CN 201220635580 CN201220635580 CN 201220635580 CN 201220635580 U CN201220635580 U CN 201220635580U CN 202988575 U CN202988575 U CN 202988575U
Authority
CN
China
Prior art keywords
bucket body
support post
swing arm
grab bucket
little
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220635580
Other languages
Chinese (zh)
Inventor
金福民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU COOPERATES PORT MACHINERY MANUFACTURE CO Ltd
Original Assignee
JIANGSU COOPERATES PORT MACHINERY MANUFACTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU COOPERATES PORT MACHINERY MANUFACTURE CO Ltd filed Critical JIANGSU COOPERATES PORT MACHINERY MANUFACTURE CO Ltd
Priority to CN 201220635580 priority Critical patent/CN202988575U/en
Application granted granted Critical
Publication of CN202988575U publication Critical patent/CN202988575U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a double-cable bivalve anti-leakage grab bucket. The double-cable bivalve anti-leakage grab bucket comprises an upper connecting body, a left swing arm, a right swing arm, a small grab bucket body, a big grab bucket body, a support part, a left support post connected to the sidewall of the small grab bucket body, and a right support post connected to the sidewall of the big grab bucket body, wherein when both the small grab bucket body and the big grab bucket body are in an open state, the left support post and the right support post are pushed against each other tightly. By utilizing the left support post, the right swing arm, and the left support post and the right support post which are pushed against each other tightly to support the big grab bucket body and the small grab bucket body, the double-cable bivalve anti-leakage grab bucket prevents a pulling rope from being always in a tensile state, and prolongs the service life of the pulling rope.

Description

A kind of pair of rope bivalve Leakage-proof Clamshell
Technical field
the utility model relates to a kind of pair of rope bivalve Leakage-proof Clamshell.
Background technology
grab bucket at present all utilizes the rope of winding on assembly pulley to control opening and closure of bucket body, keep its pulling force in open configuration mainly keep left right swing arm and rope, therefore rope can be always in tensioning state, if things go on like this can cause damage to rope, shorten the service life of rope.
The utility model content
the utility model purpose is to provide a kind of two rope bivalve Leakage-proof Clamshells of long service life.
in order to achieve the above object, the technical scheme that the utility model adopts is: a kind of pair of rope bivalve Leakage-proof Clamshell, it comprises the upper connector that the hoist cable with lifting appliance is fixedly connected, that be symmetrically set and end all rotates and is connected with upper connector sidewall left swing arm and right swing arm, the little bucket body that rotates and be connected with left swing arm the other end, the large bucket body that rotates and be connected with the other end of right swing arm, the center hinge that connects little bucket body and large bucket body, assembly pulley, the rope of winding on assembly pulley, described little bucket body is provided with a plurality of outer tooth engaged with the sidewall outside face of large bucket body phase interlock, described large bucket body is provided with a plurality of internal gearing teeth with the side wall inner surfaces of little bucket body phase interlock, when large bucket body during with little bucket body phase interlock, described internal gearing tooth and outer tooth engaged are meshed, it also comprises the left support post be connected on little bucket body sidewall, be connected to the right support post on large bucket body sidewall, when little bucket body and large bucket body when closed left support post and right support post mutually away from, when little bucket body and large bucket body during in open configuration, left support post and right support post push against mutually.
optimize, it also comprises lower connector, and described assembly pulley comprises top sheave and lower sheave, and described lower sheave and center hinge are rotationally connected with respectively on lower connector, and described top sheave rotates and is connected with upper connector.
further, described top sheave and upper connector rotate and are connected and are positioned in the middle of left swing arm and right swing arm, and the rotating shaft of described top sheave parallels with the rotating shaft of left swing arm.
owing to adopting technique scheme, the utlity model has following advantage: on little bucket body and large bucket body, left support post and right support post are set respectively, when grab bucket is not used, little bucket body and large bucket body are dropped to left support post and the right support post position that offsets, the left support post and the right support post that utilize left support post, right swing arm and mutually push against support large and small bucket body, prevent that rope from, always in extended state, having extended the service life of rope.
The accompanying drawing explanation
the structural representation that accompanying drawing 1 is the utility model size bucket body phase closure state;
the structural representation that accompanying drawing 2 is the utility model size bucket body open configuration;
the front view that accompanying drawing 3 is large bucket body;
the front view that accompanying drawing 4 is little bucket body;
wherein: 1, upper connector; 2, left swing arm; 3, right swing arm; 4, little bucket body; 5, large bucket body; 6, center hinge; 8, lower connector; 41, outer tooth engaged; 51, internal gearing tooth; 71, top sheave; 72, lower sheave; 73, rope; 91, left support post; 92, right support post.
The specific embodiment
below in conjunction with accompanying drawing, the preferred specific embodiment of the utility model is described.
as Fig. 1, shown in 2, two rope bivalve Leakage-proof Clamshells comprise the upper connector 1 that the hoist cable with lifting appliance is fixedly connected, left swing arm 2 and right swing arm 3 that end rotates and is connected with upper connector 1 sidewall respectively, the little bucket body 4 that rotates and be connected with left swing arm 2 the other end, the large bucket body 5 that rotates and be connected with the other end of right swing arm 3, the center hinge 6 that connects little bucket body 4 and large bucket body 5, be connected to the left support post 91 on little bucket body 4 sidewalls, be connected to the right support post 92 on large bucket body 5 sidewalls, for lifting the assembly pulley of little bucket body 4 and large bucket body 5, the rope 73 of winding on assembly pulley, lower connector 8.
when little bucket body 4 and large bucket body 5 during in closure state, left support post 91 and right support post 92 mutually away from; When little bucket body 4 and large bucket body 5, during in open configuration, left support post 91 pushes against mutually with right support post 92.Utilize left swing arm 2, right swing arm 3, the left support post 91 pushed against and right support post 92 that little bucket body 4 and large bucket body 5 is fixing, the replacement rope is carried 73 and is drawn little bucket body 4 and large bucket body 5, prevent that rope 73 is always in extended state, extended the service life of rope 73.
described lower connector 8 is connected lower sheave 72, connection center hinge 6, described lower connector 8 is set on lower sheave 72 and lower sheave 72 is connected with rotating on lower connector 8, and described center hinge 6 is located on lower connector 8 and is connected with rotating on lower connector 8.
for making the bucket body balance, described top sheave 71 and upper connector 1 rotate and are connected and are positioned in the middle of left swing arm 2 and right swing arm 3.
described little bucket body 4 is provided with a plurality of outer tooth engaged 41 with the sidewall outside face of large bucket body 5 phase interlocks, described large bucket body 5 is provided with a plurality of internal gearing teeth 51 with the side wall inner surfaces of little bucket body 4 phase interlocks, when large bucket body 5 during with little bucket body 4 phase interlock, between two adjacent outer tooth engaged 41, an internal gearing tooth 51 is arranged, an outer tooth engaged 41 is arranged between two adjacent internal gearing teeth 51, so just can prevent that the goods in grab bucket from spilling from the gap between large and small bucket body (5,4) by actv., reduce grab bucket and cause the waste of goods in the transporting cargo process.
above-described embodiment is only explanation technical conceive of the present utility model and characteristics, and its purpose is to allow the person skilled in the art can understand content of the present utility model and implement according to this, can not limit protection domain of the present utility model with this.All equivalences of doing according to the utility model spirit change or modify, within all should being encompassed in protection domain of the present utility model.

Claims (3)

1. a two rope bivalve Leakage-proof Clamshell, it comprises the upper connector (1) that the hoist cable with lifting appliance is fixedly connected, that be symmetrically set and end all rotates and is connected with upper connector (1) sidewall left swing arm (2) and right swing arm (3), the little bucket body (4) that rotates and be connected with left swing arm (2) the other end, the large bucket body (5) that rotates and be connected with the other end of right swing arm (3), the center hinge (6) that connects little bucket body (4) and large bucket body (5), assembly pulley, the rope (73) of winding on assembly pulley, described little bucket body (4) is provided with a plurality of outer tooth engaged (41) with the sidewall outside face of large bucket body (5) phase interlock, described large bucket body (5) is provided with a plurality of internal gearing teeth (51) with the side wall inner surfaces of little bucket body (4) phase interlock, when large bucket body (5) during with little bucket body (4) phase interlock, described internal gearing tooth (51) and outer tooth engaged (41) are meshed, it is characterized in that: it also comprises the left support post (91) be connected on little bucket body (4) sidewall, be connected to the right support post (92) on large bucket body (5) sidewall, when little bucket body (4) and large bucket body (5) when closed left support post (91) and right support post (92) mutually away from, when little bucket body (4) and large bucket body (5) during in open configuration, left support post (91) pushes against mutually with right support post (92).
2. according to claim 1 pair of rope bivalve Leakage-proof Clamshell, it is characterized in that: it also comprises lower connector (8), described assembly pulley comprises top sheave (71) and lower sheave (72), described lower sheave (72) is rotationally connected with respectively lower connector (8) above with center hinge (6), and described top sheave (71) rotates and is connected with upper connector (1).
3. according to claim 2 pair of rope bivalve Leakage-proof Clamshell, it is characterized in that: described top sheave (71) rotates and is connected and is positioned at left swing arm (2) and right swing arm (3) centre with upper connector (1), and the rotating shaft of described top sheave (71) parallels with the rotating shaft of left swing arm (2).
CN 201220635580 2012-11-27 2012-11-27 Double-cable bivalve anti-leakage grab bucket Withdrawn - After Issue CN202988575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220635580 CN202988575U (en) 2012-11-27 2012-11-27 Double-cable bivalve anti-leakage grab bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220635580 CN202988575U (en) 2012-11-27 2012-11-27 Double-cable bivalve anti-leakage grab bucket

Publications (1)

Publication Number Publication Date
CN202988575U true CN202988575U (en) 2013-06-12

Family

ID=48559774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220635580 Withdrawn - After Issue CN202988575U (en) 2012-11-27 2012-11-27 Double-cable bivalve anti-leakage grab bucket

Country Status (1)

Country Link
CN (1) CN202988575U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102942138A (en) * 2012-11-27 2013-02-27 江苏振东港口机械制造有限公司 Double-rope and bivalve leakage-proof grab bucket
CN103466441A (en) * 2013-09-27 2013-12-25 无锡市新华起重工具有限公司 High-leakproofness leakage-proof hopper body

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102942138A (en) * 2012-11-27 2013-02-27 江苏振东港口机械制造有限公司 Double-rope and bivalve leakage-proof grab bucket
CN103466441A (en) * 2013-09-27 2013-12-25 无锡市新华起重工具有限公司 High-leakproofness leakage-proof hopper body
CN103466441B (en) * 2013-09-27 2015-12-30 无锡市新华起重工具有限公司 The anti-infundibular body of high leakproofness

Similar Documents

Publication Publication Date Title
CN203946450U (en) A kind of self-unloading lift van
CN202988575U (en) Double-cable bivalve anti-leakage grab bucket
CN201907918U (en) Steel wire rope balancing frame of four-rope crane
CN203612833U (en) Grab bucket crane and grab bucket rotation prevention device thereof
CN102644301B (en) Translation-type flat-digging grab bucket
CN204569164U (en) A kind of multi-clove type Leakage-proof Clamshell
CN202575785U (en) Portal crane and four-connecting-rod system thereof
CN102942138A (en) Double-rope and bivalve leakage-proof grab bucket
CN201605085U (en) Wire groove hoisting tool for subway
CN211619781U (en) Explosion-proof electric telescopic rotary container spreader
CN209815508U (en) Multi-petal asynchronous grab bucket for crane
CN205294623U (en) Be used for steel pipe hoist and mount cable spare
CN204416919U (en) A kind of lifting device
CN204980847U (en) A hoist for major axis class article
CN201419977Y (en) Wire cable space fixer
CN204038829U (en) The anti-steel rope suspending apparatus of a kind of hoisting rope
CN207918282U (en) Has the lifting trolley from dedusting function of drying
CN208932812U (en) A kind of four rope grab
CN202346548U (en) Counterweight with guiding device for compensation chain
CN203033662U (en) Shear mode leakage-proof grab bucket
CN205170180U (en) Dredge grab bucket device
CN203273171U (en) Observation window of dumping pipeline of shield spiral conveyor
CN203889871U (en) Shackle
CN202610858U (en) Translational flat excavation grab bucket
CN205114127U (en) Automatic open and merge material jar at end

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130612

Effective date of abandoning: 20160629

C25 Abandonment of patent right or utility model to avoid double patenting