CN202985755U - Concrete-brick steam curing frame - Google Patents

Concrete-brick steam curing frame Download PDF

Info

Publication number
CN202985755U
CN202985755U CN 201320020832 CN201320020832U CN202985755U CN 202985755 U CN202985755 U CN 202985755U CN 201320020832 CN201320020832 CN 201320020832 CN 201320020832 U CN201320020832 U CN 201320020832U CN 202985755 U CN202985755 U CN 202985755U
Authority
CN
China
Prior art keywords
concrete
brick
bracing frame
steam curing
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320020832
Other languages
Chinese (zh)
Inventor
施华东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320020832 priority Critical patent/CN202985755U/en
Application granted granted Critical
Publication of CN202985755U publication Critical patent/CN202985755U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The utility model discloses a concrete-brick steam curing frame. The concrete-brick steam curing frame comprises concrete bricks (1), an upper supporting plate (4) and a plurality of layers of lower supporting plates (6), wherein the concrete bricks (1) formed through a brick making machine are evenly arranged on the upper supporting plate (4) and the lower supporting plates (6), ventilation ducts (2) with a certain separation distance are evenly arranged among the concrete bricks in the longitudinal direction and the transverse direction, the upper supporting plate (4) and the lower supporting plates (6) where the concrete bricks (1) are evenly arranged are mutually overlapped in a supporting mode, supporting frames (3) are arranged at four corners of each layer of lower supporting plate (6) and are arranged in the intersection positions of the ventilation ducts (2) in the longitudinal direction and the transverse direction, and the upper supporting plate (4) and the lower supporting plates (6) are correspondingly arranged on the supporting frames (3) at the lower layer, so that interlayers (5) are arranged between the upper supporting plate (4) and the concrete bricks (1) at the lower layer, and between the lower supporting plates (6) and the lower supporting plates (6). By means of the structure, the concrete-brick steam curing frame has the advantages of being reasonable in structure, convenient to operate and use, stable and reliable in vertical overlapping, good in curing effect, short in curing time, and the like.

Description

Concrete brick steam curing frame
Technical field
The utility model relates to a kind of concrete brick production auxiliary equipment, and particularly a kind of concrete brick is deposited into carried out steamed concrete brick steam curing frame in maintenance kiln.
Background technology
Fragment of brick is indispensable construction material in building trade, and the fragment of brick that uses at present mainly contains clay brick and concrete brick.Clay brick is owing to needing mass energy in sintering procedure, contaminated environment not only, and occupy a large amount of land resource causes many good farmlands not cultivate, for this reason country's relevant policies and rules of having put into effect restriction clay brick production and having encouraged to produce concrete brick.Concrete brick does not occupy cultivated land again owing to both there is no environmental pollution, and the instead of clay brick, obtain more and more extensive use in building trade just gradually.
Also need carry out late maintaining after the concrete brick moulding, the quality of maintenance work directly affects the mechanical property of fragment of brick, the early stage general natural curing of adopting, natural curing is exactly adobe to be moved to the place stack, and maintenance just can reach requirement of strength through long time, in this process, need to water water-wet, the deficiency of its existence is that the concrete brick quality is affected by temperature height, moistening degree, and product quality can't guarantee, and the time is long, efficient is low, deficiency in economic performance.In order to shorten curing time, guarantee product quality, avoid occurring contraction fissure, general employing steam curing after concrete brick moulding at present, steam curing evenly is placed on adobe on supporting plate exactly, then asks layer by layer stacked group to become nursing frame to put into maintenance kiln and carry out steam curing.But existing nursing frame has the following disadvantages: the one, the upper strata supporting plate directly is placed in the adobe of lower floor, bottom which floor adobe sometimes compressive deformation, break or broken; The 2nd, can only maintenance in the steam curing process to the surrounding of adobe, can not maintenance to the front of adobe, not only extended the steam curing time, and reduced efficient, improved maintenance cost.For this reason, many manufacturers develop and study, but not yet have so far desirable product to emerge.
Summary of the invention
For overcoming existing concrete brick steam curing frame above shortcomings, the purpose of this utility model be to provide a kind of simple and reasonable, easy for operation, stack the concrete brick steam curing frame reliable and stable, that maintenance effect good, curing time is short up and down.
the utility model solves the problems of the technologies described above the technical scheme that adopts, it comprises the concrete fragment of brick, mounting plate and multilayer bottom plate, the concrete fragment of brick of brickmaking machine moulding is placed on uniformly, on bottom plate, evenly keep the ventilating duct of a determining deviation between concrete fragment of brick vertical and horizontal, mounting plate and the multilayer bottom plate of evenly placing the concrete fragment of brick hold in the palm folded mutually, four jiaos at every layer of bottom plate all are placed with bracing frame, bracing frame is placed on the infall of concrete fragment of brick vertical and horizontal ventilating duct, mounting plate and bottom plate correspondence are placed on the lower layer support frame, make between the concrete fragment of brick of mounting plate and bottom plate and lower floor and be provided with the folder dead level.
Described bracing frame is the cross bracing frame.
Described bracing frame is I-shaped bracing frame.
Described bracing frame is T-shaped bracing frame.
After adopting said structure, have the following advantages compared with the prior art and effect: the one, because mounting plate and bottom plate correspondence are placed on the lower layer support frame, the upper strata supporting plate directly is not pressed in the adobe of lower floor, so can reduce the adobe breakage, improves yield rate.The 2nd, owing to being provided with the folder dead level between supporting plate and adobe, steam to the surrounding of adobe, can also carry out maintenance except maintenance from the front of adobe, can improve maintenance effect, shortens curing time.
Description of drawings
Fig. 1 is schematic perspective view of the present utility model.
Fig. 2 is decomposition texture schematic diagram of the present utility model.
Fig. 3 is the first structural representation of the utility model bracing frame.
Fig. 4 is the second structural representation of the utility model bracing frame.
Fig. 5 is the third structural representation of the utility model bracing frame.
1 concrete fragment of brick wherein, 2 ventilating ducts, 3 bracing frames, 4 mounting plates, 5 folder dead levels, 6 bottom plates, 7 cross bracing frames, 8 I-shaped bracing frames, 9 T-shaped bracing frames.
The specific embodiment
illustrated in figures 1 and 2, specific embodiments for a kind of concrete brick steam curing of the utility model frame, it comprises concrete fragment of brick 1, mounting plate 4 and multilayer bottom plate 6, the concrete fragment of brick 1 of brickmaking machine moulding is placed on uniformly, bottom plate 4, on 6, evenly keep the ventilating duct 2 of a determining deviation between concrete fragment of brick 1 vertical and horizontal, mounting plate 4 and the multilayer bottom plate 6 of evenly placing concrete fragment of brick 1 hold in the palm folded mutually, four jiaos at every layer of bottom plate 6 all are placed with bracing frame 3, bracing frame 3 is placed on the infall of concrete fragment of brick 1 vertical and horizontal ventilating duct 2, mounting plate 4 and bottom plate 6 correspondences are placed on lower layer support frame 3, make and be provided with folder dead level 5 between the concrete fragment of brick 1 of mounting plate 4 and bottom plate 6 and lower floor.
Figure 3 shows that the first embodiment of the utility model bracing frame 3, described bracing frame 3 is cross bracing frame 7.Figure 4 shows that the second embodiment of the utility model bracing frame 3, described bracing frame 3 is I-shaped bracing frame 8.Figure 5 shows that the third embodiment of the utility model bracing frame 3, described bracing frame 3 is T-shaped bracing frame 9.Above three kinds of bracing frames 3 neither can affect carrying in transport process, can reach again the effect of steady support, can because of bracing frame 3 overturnings, not damage lower-layer concrete fragment of brick 1 by pressure.
The above is specific embodiment of the utility model; be not that the utility model is made any pro forma restriction; do not breaking away from the technical solution of the utility model basis, the simple modification of having done, equivalent variations or modification all fall into protection domain of the present utility model.

Claims (4)

1. concrete brick steam curing frame, comprise concrete fragment of brick (1), mounting plate (4) and multilayer bottom plate (6), the concrete fragment of brick (1) of brickmaking machine moulding is placed on uniformly, bottom plate (4, 6) on, evenly keep the ventilating duct (2) of a determining deviation between concrete fragment of brick (1) vertical and horizontal, mounting plate (4) and the multilayer bottom plate (6) of evenly placing concrete fragment of brick (1) hold in the palm folded mutually, it is characterized in that: four jiaos at every layer of bottom plate (6) all are placed with bracing frame (3), bracing frame (3) is placed on the infall of concrete fragment of brick (1) vertical and horizontal ventilating duct (2), mounting plate (4) and bottom plate (6) correspondence are placed on lower layer support frame (3), make and be provided with folder dead level (5) between the concrete fragment of brick (1) of mounting plate (4) and bottom plate (6) and lower floor.
2. concrete brick steam curing frame according to claim 1, it is characterized in that: described bracing frame (3) is cross bracing frame (7).
3. concrete brick steam curing frame according to claim 1, it is characterized in that: described bracing frame (3) is I-shaped bracing frame (8).
4. concrete brick steam curing frame according to claim 1, it is characterized in that: described bracing frame (3) is T-shaped bracing frame (9).
CN 201320020832 2013-01-16 2013-01-16 Concrete-brick steam curing frame Expired - Fee Related CN202985755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320020832 CN202985755U (en) 2013-01-16 2013-01-16 Concrete-brick steam curing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320020832 CN202985755U (en) 2013-01-16 2013-01-16 Concrete-brick steam curing frame

Publications (1)

Publication Number Publication Date
CN202985755U true CN202985755U (en) 2013-06-12

Family

ID=48556972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320020832 Expired - Fee Related CN202985755U (en) 2013-01-16 2013-01-16 Concrete-brick steam curing frame

Country Status (1)

Country Link
CN (1) CN202985755U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108839220A (en) * 2018-09-10 2018-11-20 张家港市华孚实业有限公司 A kind of maintenance pallet of expanded perlite thermal-nsulation plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108839220A (en) * 2018-09-10 2018-11-20 张家港市华孚实业有限公司 A kind of maintenance pallet of expanded perlite thermal-nsulation plate

Similar Documents

Publication Publication Date Title
CN204059760U (en) A kind of square steel post post core self-compacting concrete pouring construction structure
CN106272951A (en) Assembling die precast concrete wall panel technology
CN202985755U (en) Concrete-brick steam curing frame
CN203440947U (en) Flexible connecting structure for integration part between reinforced concrete wall and brick wall
CN202343799U (en) Moulding fixture for beams and wallboards made from composite material
CN103469961A (en) CL grid plate production method
CN102493592A (en) Self-insulation building block with skin
CN204471567U (en) A kind of manual base plate module of mould casing component
CN204418452U (en) A kind of precast floor slab cracking-proof structure
CN203654882U (en) Prefabricated concrete combined temporary wall
CN203270913U (en) Composite self-insulation concrete building block
CN203361579U (en) Mold for laying and fixing of opening of ceramic tile
CN207211467U (en) A kind of combined type floor support plate constructing structure for steel building
CN204310512U (en) A kind of haydite block Lift-slab machine
CN204199477U (en) Heat-preserving building wall
CN205205701U (en) Template system is contained in shrink movable type side
CN203888004U (en) Rectangular block brick die
CN102198692A (en) Die for production of three-row-hole recycled concrete
CN104089174A (en) Hollow board
CN203230055U (en) Composite heat insulating board
CN204676880U (en) A kind of super thick wall form ruggedized construction
CN204059727U (en) A kind of high-strength heat preservation autoclaved aerated building block
CN203317529U (en) Concrete test block maintenance frame
CN205012547U (en) Concrete composite self -insulation building block
CN203961108U (en) Duplex brick

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130612

Termination date: 20150116

EXPY Termination of patent right or utility model