CN202975769U - Intelligent electric power control device of rock transporting and discharging system - Google Patents
Intelligent electric power control device of rock transporting and discharging system Download PDFInfo
- Publication number
- CN202975769U CN202975769U CN201220701299XU CN201220701299U CN202975769U CN 202975769 U CN202975769 U CN 202975769U CN 201220701299X U CN201220701299X U CN 201220701299XU CN 201220701299 U CN201220701299 U CN 201220701299U CN 202975769 U CN202975769 U CN 202975769U
- Authority
- CN
- China
- Prior art keywords
- unit
- subsystem
- electric power
- communication subsystem
- control device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model relates to the technical field of electric power system network online intelligent fault diagnosing and controlling, in particular to an intelligent electric power control device of a rock transporting and discharging system. The intelligent electric power control device comprises a collection subsystem, a communication subsystem and a centralized control subsystem, the collection subsystem comprises a on-site equipment unit and a data collection control unit connected with the on-site equipment unit, the centralized control subsystem comprises a data processing and analyzing system, an operating state control unit, a display unit and a storage unit, the data collection control unit is connected with the communication subsystem, and the data processing and analyzing unit, the operating state control unit, the display unit and the storage unit are respectively connected with the communication subsystem. Maintenance schemes or precautionary measures of equipment are determined by extracting state information of current, voltage and the like during operating of the on-site equipment and performing data analysis and processing to tested signals, occurrence of major malignant accidents can be effectively prevented, and industrial production efficiency is improved.
Description
Technical field
The utility model relates to the technical field of power system network on-line intelligent fault diagnosis and control, is specifically related to a kind of rock fortune heat-extraction system electric intelligent control device.
Background technology
In the various device of the rock in mine fortune heat-extraction system electric power, mechanical, electric or other reasons often causes the faults such as the overcurrent, overvoltage of electromagnetism station bus, causes the fault of the instantaneous shutdown in electromagnetism station.Cause the stoppage in transit of whole production line, bring larger loss for normal production.
Summary of the invention
The utility model is to provide a kind of rock fortune heat-extraction system electric intelligent control device; can find as soon as possible degradation phenomena and the failure symptom of plant equipment; take effective prevention and control measure; make equipment recover normal operating condition; the loss that minimizing brings because of shutdown, the effective rate of utilization of raising equipment.
The purpose of this utility model realizes by following technical proposals:
rock fortune heat-extraction system electric intelligent control device of the present utility model, it is characterized in that comprising acquisition subsystem, communication subsystem and collection control subsystem, described acquisition subsystem comprises the data acquisition control unit that the field apparatus unit is connected with field apparatus unit therewith, described collection control subsystem comprises the Data Management Analysis unit, the running status control module, display unit and storage unit, described data acquisition control unit is connected with described communication subsystem, described Data Management Analysis unit, the running status control module, display unit is connected with storage unit with described communication subsystem and is connected.
The beneficial effects of the utility model are:
1) the utility model is by status informations such as the electric current in extraction field apparatus operation journey, voltages, measured signal is carried out data analysis and processing, and in conjunction with the historical summary of diagnosis object, fault category and mechanism of production are carried out Discern and judge, and then the maintenance program of definite equipment or the precautionary measures, can effectively prevent the generation of great serious accident, improve industrial efficient;
2) the utility model can be made resolution to state and the development trend of equipment, prevents the generation of great serious accident, improves industrial efficient.This method has higher level at aspects such as system's formation, control methods, and establishes reliable basis for promoting the use of the occasions such as other factories and miness.
Description of drawings
Fig. 1 is structured flowchart of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, rock fortune heat-extraction system electric intelligent control device of the present utility model comprises acquisition subsystem, communication subsystem and collection control subsystem; Described acquisition subsystem comprises the data acquisition control unit that the field apparatus unit is connected with field apparatus unit therewith, and it controls the power equipment in whole rock fortune heat-extraction system workshop, and the data of each device context ruuning situation of real time record; Described data acquisition control unit is connected with communication subsystem, each device context ruuning situation data of its collection site unit record, and send these data to communication subsystem; Described collection control subsystem comprises Data Management Analysis unit, running status control module, display unit and storage unit; Described Data Management Analysis unit is connected with described communication subsystem, the data of each device context ruuning situation that its received communication subsystem transmits, and data are processed and are analyzed, and will process and analysis result information send the running status control module to; Described running status control module is connected with described communication subsystem, the object information that it transmits according to the Data Management Analysis unit, send the steering order to the field apparatus running status, and passing to the data acquisition control unit by communication subsystem, the data acquisition control unit is controlled the running status of field apparatus according to the steering order that receives; Described display unit is connected with described communication subsystem, and it shows each device context ruuning situation data that transmitted by communication subsystem; Described storage unit is connected with described communication subsystem, each device context ruuning situation data that its storage is transmitted by communication subsystem.
Electric intelligent control device of the present utility model uses modern measure and diagnostic techniques; by status informations such as the electric current in extraction plant equipment operation journey, voltages; institute's measurement information is carried out data analysis and processing; and in conjunction with the historical summary of diagnosis object; fault category and mechanism of production are carried out Discern and judge; and then can find as soon as possible degradation phenomena and the failure symptom of plant equipment; take effective prevention and control measure; make equipment recover normal operating condition; the loss that minimizing brings because of shutdown, the effective rate of utilization of raising equipment.
Claims (1)
1. a rock is transported heat-extraction system electric intelligent control device, it is characterized in that comprising acquisition subsystem, communication subsystem and collection control subsystem, described acquisition subsystem comprises the data acquisition control unit that the field apparatus unit is connected with field apparatus unit therewith, described collection control subsystem comprises the Data Management Analysis unit, the running status control module, display unit and storage unit, described data acquisition control unit is connected with described communication subsystem, described Data Management Analysis unit, the running status control module, display unit is connected with storage unit with described communication subsystem and is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220701299XU CN202975769U (en) | 2012-12-18 | 2012-12-18 | Intelligent electric power control device of rock transporting and discharging system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220701299XU CN202975769U (en) | 2012-12-18 | 2012-12-18 | Intelligent electric power control device of rock transporting and discharging system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202975769U true CN202975769U (en) | 2013-06-05 |
Family
ID=48516822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220701299XU Expired - Lifetime CN202975769U (en) | 2012-12-18 | 2012-12-18 | Intelligent electric power control device of rock transporting and discharging system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202975769U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109426302A (en) * | 2017-08-30 | 2019-03-05 | 西门子(中国)有限公司 | A kind of data analysis equipment and method |
-
2012
- 2012-12-18 CN CN201220701299XU patent/CN202975769U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109426302A (en) * | 2017-08-30 | 2019-03-05 | 西门子(中国)有限公司 | A kind of data analysis equipment and method |
CN109426302B (en) * | 2017-08-30 | 2022-05-20 | 西门子(中国)有限公司 | Data analysis equipment and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104932485A (en) | Railway track switch point machine fault prediction system and method | |
CN103901882A (en) | Online monitoring fault diagnosis system and method of train power system | |
CN203643834U (en) | Fault diagnosis system of mining main ventilator | |
CN103901330A (en) | Partial discharge on-line monitoring method for XLPE cable | |
CN103559648A (en) | Grid equipment state inspection and evaluation training system | |
CN103618297A (en) | High-efficiency and high-reliability fault processing method aiming at complex power distribution network | |
CN101702008B (en) | Portable electric machine fault on-line diagnostic device | |
CN202524167U (en) | A state detection and intelligent control device for high-voltage circuit breaker | |
CN104931836A (en) | Power grid monitoring and early warning system | |
CN106602731A (en) | Electric power equipment state monitoring diagnosis system based on cloud end | |
CN113098132A (en) | Improved machine learning fault diagnosis system based on group intelligent optimization | |
CN205594104U (en) | Transmission line monitoring facilities remote intelligent diagnostic device | |
CN103163402A (en) | Relaying protection equipment state monitoring device and monitoring method based on secondary circuit | |
CN104101381A (en) | Online monitoring system of mining high voltage distribution device | |
CN202975769U (en) | Intelligent electric power control device of rock transporting and discharging system | |
CN203452792U (en) | Real-time monitoring and intelligent evaluation system for health degree of electric traction coal cutter | |
CN103398745A (en) | Failure diagnosis system for frequency converter of coal winning machine | |
CN102736598A (en) | Safety monitoring device for chemical production | |
CN107342627B (en) | On-line equipment monitoring device of power distribution station and use method | |
CN205958680U (en) | A vibration monitoring devices for diagnosing transformer trouble | |
CN103663029A (en) | Elevator remote monitoring and debugging system | |
CN104101814A (en) | Line fault accurate location method based on distribution automation system | |
CN204101623U (en) | Intelligence monitoring of stray current sensor | |
CN105929745A (en) | Cable trench environment monitoring system | |
CN204594613U (en) | For the online pressure monitoring device of transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong Patentee after: ANSTEEL GROUP MINING Co.,Ltd. Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong Patentee before: Ansteel Group Mining Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130605 |