CN202975131U - High-voltage electrical inspection and phase verification mechanism of switch cabinet intelligent operation display device - Google Patents

High-voltage electrical inspection and phase verification mechanism of switch cabinet intelligent operation display device Download PDF

Info

Publication number
CN202975131U
CN202975131U CN 201220738420 CN201220738420U CN202975131U CN 202975131 U CN202975131 U CN 202975131U CN 201220738420 CN201220738420 CN 201220738420 CN 201220738420 U CN201220738420 U CN 201220738420U CN 202975131 U CN202975131 U CN 202975131U
Authority
CN
China
Prior art keywords
phase
electrical inspection
high voltage
verification
switch cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220738420
Other languages
Chinese (zh)
Inventor
郭明皇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HONCEN TECHNOLOGY Co Ltd
Original Assignee
HANGZHOU HONCEN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HONCEN TECHNOLOGY Co Ltd filed Critical HANGZHOU HONCEN TECHNOLOGY Co Ltd
Priority to CN 201220738420 priority Critical patent/CN202975131U/en
Application granted granted Critical
Publication of CN202975131U publication Critical patent/CN202975131U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

A high-voltage electrical inspection and phase verification mechanism of a switch cabinet intelligent operation display device comprises A-phase, B-phase and C-phase high voltage input ends, A-phase, B-phase and C-phase external electrical inspection and phase verification holes, as well as A-phase, B-phase and C-phase high voltage electrification indicator lights. The high-voltage electrical inspection and phase verification mechanism is characterized in that the high-voltage electrical inspection and phase verification mechanism also comprises an input end of a grounding wire and an external electrical inspection and phase verification hole of the grounding wire. Compared with traditional products, according to the high-voltage electrical inspection and phase verification mechanism of the utility model, the grounding electrical inspection hole is added, such that convenience in electrical inspection and phase verification is greatly improved. In usage process, it is not required to open a switch cabinet door or for a user to find an effective grounding point; through an electroscope and the four electrical inspection and phase verification holes, electrical inspection and phase verification can be completed conveniently. In actual operation, the electroscope can be adopted to directly perform secondary electrical inspection and phase verification on the electrical inspection and phase verification holes, and therefore, safety accidents can be prevented.

Description

The high voltage testing nuclear phase mechanism of the aobvious device of Intelligent switch cabinet behaviour
Technical field
The utility model relates to the aobvious device of a kind of Intelligent switch cabinet behaviour, the high voltage testing nuclear phase mechanism of the aobvious device of especially a kind of Intelligent switch cabinet behaviour.
Background technology
At present the aobvious device of a lot of Intelligent switch cabinets behaviour is provided with the pilot lamp that joins with high-pressure side (A, B, C), and three electrical verification nuclear phase holes.When high-pressure side was charged, the pilot lamp of corresponding phase was bright, thereby illustrated that this phase is charged; Yet when luminous indicating lamp broke down, although high-pressure side is charged, the pilot lamp of corresponding phase did not show, can cause security incident.Be head it off, a lot of products have increased by 3 electrical verification nuclear phase holes, and the electroscope by the outside carries out the secondary electrical verification to electrical verification nuclear phase hole to be confirmed, has increased greatly the reliability of electrical verification, the generation of having stopped security incident.In addition, if the user scene is dual power supply, can also realize nuclear phase by electrical verification nuclear phase hole, greatly facilitate the user.Yet, this present series products all only has three electrical verification nuclear phase holes that represent A, B, C three-phase electricity, because the aobvious device of Intelligent switch cabinet behaviour belongs to cabinet dress instrument, so the user is when carrying out the electrical verification nuclear phase by electrical verification nuclear phase hole, need to open switch cubicle or find a ground terminal nearby toward contact, use very inconvenient.
The utility model content
The utility model mainly solves the problem of the aobvious device electrical verification nuclear phase inconvenience of existing Intelligent switch cabinet behaviour, and a kind of Intelligent switch cabinet behaviour is provided the high voltage testing nuclear phase mechanism of aobvious device, does not need to open cabinet door and can complete easily electrical verification nuclear phase function.
Above-mentioned technical matters of the present utility model is mainly solved by following technical proposals:
The high voltage testing nuclear phase mechanism of the aobvious device of a kind of Intelligent switch cabinet behaviour comprises: A phase, B phase, C phase high voltage input terminal, the external electrical verification nuclear phase hole of A phase, B phase, C phase, and the electrification in high voltage pilot lamp of A phase, B phase, C phase; It is characterized in that: the external electrical verification nuclear phase hole that also comprises input end and the ground wire of ground wire.
Further, the external electrical verification nuclear phase hole connection electrical circuit inspection of described A phase, B phase, C phase, the electrification in high voltage pilot lamp of A phase, B phase, C phase is connected in parallel in electrical circuit inspection.
The beneficial effects of the utility model are: do not need to open cabinet door in the utility model use procedure, or do not need the user to seek effective earth point, can complete easily electrical verification nuclear phase function by electroscope and four electrical verification nuclear phase holes.
Description of drawings
Fig. 1 is the circuit theory diagrams of the utility model embodiment high voltage testing nuclear phase part;
Fig. 2 is the external structure schematic diagram of the utility model embodiment high voltage testing nuclear phase part; Wherein: 1-A phase high voltage input terminal, 2-B phase high voltage input terminal, 3-C phase high voltage input terminal, the input end of 4-ground wire, the mutually external electrical verification nuclear phase of 5-A hole, the mutually external electrical verification nuclear phase of 6-B hole, the mutually external electrical verification nuclear phase of 7-C hole, the external electrical verification nuclear phase hole of 8-ground wire, 9-A phase electrification in high voltage pilot lamp, 10-B phase electrification in high voltage pilot lamp, 11-C phase electrification in high voltage pilot lamp.
Embodiment
Below in conjunction with embodiment and accompanying drawing, the technical solution of the utility model is done further specific description.
The high voltage testing nuclear phase mechanism of the aobvious device of the utility model Intelligent switch cabinet behaviour mainly solves the problem of the aobvious device electrical verification nuclear phase inconvenience of existing Intelligent switch cabinet behaviour, and a kind of Intelligent switch cabinet behaviour is provided the high voltage testing nuclear phase mechanism of aobvious device.
As shown in Figure 2, the high voltage testing nuclear phase mechanism of the aobvious device of a kind of Intelligent switch cabinet behaviour, comprise: A phase high voltage input terminal 1, B phase high voltage input terminal 2, C phase high voltage input terminal 3, the mutually external electrical verification nuclear phase of A hole 5, the mutually external electrical verification nuclear phase of B hole 6, the mutually external electrical verification nuclear phase of C hole 7, and A phase electrification in high voltage pilot lamp 9, B phase electrification in high voltage pilot lamp 10, C phase electrification in high voltage pilot lamp 11;
The external electrical verification nuclear phase hole 8 that also comprises the input end 4 of ground wire and ground wire.
As shown in Figure 1, the electrical circuit inspection that described A phase high voltage input terminal 1, B phase high voltage input terminal 2, C phase high voltage input terminal 3 electrical verification nuclear phase mutually external with A hole 5, the mutually external electrical verification nuclear phase of B hole 6, the mutually external electrical verification nuclear phase of C hole 7 connects respectively separately is in the electrical circuit inspection that described A phase electrification in high voltage pilot lamp 9, B phase electrification in high voltage pilot lamp 10, C phase electrification in high voltage pilot lamp 11 are connected in parallel on separately.
The utility model is compared traditional product, has added ground connection electrical verification hole, has greatly improved the convenience of electrical verification nuclear phase operation.Do not need to open cabinet door in use procedure, or do not need the user to seek effective earth point, can complete easily electrical verification nuclear phase function by electroscope and four electrical verification nuclear phase holes.In actual motion, can use electroscope directly to carry out secondary electrical verification and nuclear phase to the electrical verification hole, thus the generation of having stopped security incident.
To one skilled in the art, can be expressly understood very much specific embodiment by above explanation.The utility model does not limit therewith, and is all according to technological thought of the present utility model, and the difference of doing on the technical scheme basis changes, within all falling into protection domain of the present utility model.

Claims (2)

1. an Intelligent switch cabinet is grasped the high voltage testing nuclear phase mechanism that shows device, comprising:
A phase, B phase, C phase high voltage input terminal (1,2,3), the external electrical verification nuclear phase hole (5,6,7) of A phase, B phase, C phase, and the electrification in high voltage pilot lamp (9,10,11) of A phase, B phase, C phase; It is characterized in that: the external electrical verification nuclear phase hole (8) that also comprises input end (4) and the ground wire of ground wire.
2. Intelligent switch cabinet behaviour as claimed in claim 1 shows the high voltage testing nuclear phase mechanism of device, it is characterized in that: the external electrical verification nuclear phase hole (5,6,7) of described A phase, B phase, C phase connects electrical circuit inspection, and the electrification in high voltage pilot lamp of A phase, B phase, C phase (9,10,11) is connected in parallel in electrical circuit inspection.
CN 201220738420 2012-12-26 2012-12-26 High-voltage electrical inspection and phase verification mechanism of switch cabinet intelligent operation display device Expired - Lifetime CN202975131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220738420 CN202975131U (en) 2012-12-26 2012-12-26 High-voltage electrical inspection and phase verification mechanism of switch cabinet intelligent operation display device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220738420 CN202975131U (en) 2012-12-26 2012-12-26 High-voltage electrical inspection and phase verification mechanism of switch cabinet intelligent operation display device

Publications (1)

Publication Number Publication Date
CN202975131U true CN202975131U (en) 2013-06-05

Family

ID=48516189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220738420 Expired - Lifetime CN202975131U (en) 2012-12-26 2012-12-26 High-voltage electrical inspection and phase verification mechanism of switch cabinet intelligent operation display device

Country Status (1)

Country Link
CN (1) CN202975131U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103364648A (en) * 2013-07-17 2013-10-23 燕开电气股份有限公司 Nuclear phase device and electroscope used in cooperation with nuclear phase device
CN110887990A (en) * 2019-12-09 2020-03-17 郑州固峰电力器材有限公司 Electric power high-voltage ring main unit electricity testing device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103364648A (en) * 2013-07-17 2013-10-23 燕开电气股份有限公司 Nuclear phase device and electroscope used in cooperation with nuclear phase device
CN110887990A (en) * 2019-12-09 2020-03-17 郑州固峰电力器材有限公司 Electric power high-voltage ring main unit electricity testing device and method

Similar Documents

Publication Publication Date Title
CN103630734B (en) A kind of full voltage all-loop self-inspection condensing type electroscope
CN202975131U (en) High-voltage electrical inspection and phase verification mechanism of switch cabinet intelligent operation display device
CN202084950U (en) Device for detecting generation of island in micro power grid system
CN202976623U (en) Simulation demonstration device used for training remote electrical load control
CN204012294U (en) Rural low voltage network comprehensive distribution box
CN204028210U (en) The two electroscope of ac high-voltage
CN103217652A (en) Large-current surge testing device
CN202854216U (en) Intelligent combined electroscope
CN102253273A (en) High-voltage electrified display with electricity checking and phase detection functions
CN204214921U (en) Anti-electricity-theft Domestic electric meter
CN201887568U (en) Self-power taking digital wireless fault indicator
CN201570797U (en) High-voltage power supply and low-voltage measuring combined switch cabinet
CN202102044U (en) High-voltage electrified display with electricity testing phasing function
CN103487635A (en) High voltage induction wireless electrified indicating device
CN205178472U (en) Earth -free power supply system of neutral point with ground connection protect function
CN204089145U (en) A kind of enclosed cable feeder pillar
CN203932795U (en) A kind of intelligent and safe electronic box
CN204129085U (en) Loaded termination control system
CN203084064U (en) Multifunctional electroscope
CN203465325U (en) Antimagnetic high-voltage electricity metering box
CN202333891U (en) Transformer substation direct current storage battery online test and nuclear capacity discharge device
CN202363748U (en) Fuse installing structure used in low voltage power distribution cabinet
CN203180318U (en) Distribution transformer comprehensive power distribution cabinet
CN202351334U (en) Multifunctional comprehensive testing table
CN203191418U (en) High voltage metering device