CN202969346U - 水工大坝心墙变形监测结构 - Google Patents
水工大坝心墙变形监测结构 Download PDFInfo
- Publication number
- CN202969346U CN202969346U CN 201220667810 CN201220667810U CN202969346U CN 202969346 U CN202969346 U CN 202969346U CN 201220667810 CN201220667810 CN 201220667810 CN 201220667810 U CN201220667810 U CN 201220667810U CN 202969346 U CN202969346 U CN 202969346U
- Authority
- CN
- China
- Prior art keywords
- core wall
- displacement meter
- strain displacement
- water conservancy
- concrete core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 13
- 238000006073 displacement reaction Methods 0.000 claims abstract description 41
- 230000007704 transition Effects 0.000 claims abstract description 14
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 7
- 239000004927 clay Substances 0.000 claims description 9
- 229910001220 stainless steel Inorganic materials 0.000 claims description 9
- 239000010935 stainless steel Substances 0.000 claims description 9
- 230000004888 barrier function Effects 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 7
- 230000001427 coherent effect Effects 0.000 abstract description 2
- 238000004873 anchoring Methods 0.000 abstract 6
- 230000003044 adaptive effect Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000005192 partition Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220667810 CN202969346U (zh) | 2012-12-07 | 2012-12-07 | 水工大坝心墙变形监测结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220667810 CN202969346U (zh) | 2012-12-07 | 2012-12-07 | 水工大坝心墙变形监测结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202969346U true CN202969346U (zh) | 2013-06-05 |
Family
ID=48510440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220667810 Expired - Lifetime CN202969346U (zh) | 2012-12-07 | 2012-12-07 | 水工大坝心墙变形监测结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202969346U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102967292A (zh) * | 2012-12-07 | 2013-03-13 | 中国水电顾问集团贵阳勘测设计研究院 | 沥青混凝土心墙挠度的监测方法及结构 |
-
2012
- 2012-12-07 CN CN 201220667810 patent/CN202969346U/zh not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102967292A (zh) * | 2012-12-07 | 2013-03-13 | 中国水电顾问集团贵阳勘测设计研究院 | 沥青混凝土心墙挠度的监测方法及结构 |
CN102967292B (zh) * | 2012-12-07 | 2015-12-30 | 中国水电顾问集团贵阳勘测设计研究院 | 沥青混凝土心墙挠度的监测方法及结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107460898A (zh) | 一种沉入式桥梁桩基冲刷实时监测系统及其监测方法 | |
CN103215974B (zh) | 基于分布式光纤传感技术的基桩挠度量测方法 | |
CN207244680U (zh) | 一种沉入式桥梁桩基冲刷实时监测系统 | |
CN103643668B (zh) | 一种建筑工程基坑监测的方法 | |
CN107131862A (zh) | 一种堆石坝面板变形监测装置及施工方法 | |
CN103940490A (zh) | 平膜压力变送器监测水下混凝土液面高度的装置及方法 | |
CN107794882B (zh) | 一种便于大面积渗漏检测的土工膜及其渗漏检测方法 | |
CN103233432B (zh) | 贝雷梁反吊支撑体系及其施工方法 | |
Che et al. | Field investigation on the mechanical performance of corrugated steel utility tunnel (CSUT) | |
CN204007574U (zh) | 一种泥沙淤积厚度测量装置 | |
CN104595728A (zh) | 一种地下管道接口渗漏的预警监测系统及其工作方法 | |
CN105157999A (zh) | 基于分布式光纤传感技术桩完整性和横向位移的评估方法 | |
CN103868638B (zh) | 冻胀力测量装置及其测量方法 | |
CN109520471B (zh) | 光纤单孔分层沉降监测装置及其监测方法 | |
CN102967292B (zh) | 沥青混凝土心墙挠度的监测方法及结构 | |
CN202969346U (zh) | 水工大坝心墙变形监测结构 | |
Xue et al. | Study on the Life‐Cycle Health Monitoring Technology of Water‐Rich Loess Tunnel | |
CN115450267B (zh) | 一种土石坝沉降管接力安装埋设结构及其方法 | |
CN204963778U (zh) | 一种混凝土坝与土石坝连接结构界面变形监测仪器 | |
Kalisz et al. | Impact of mining exploitation on pipelines | |
CN206944978U (zh) | 一种堆石坝面板变形监测装置 | |
CN209084162U (zh) | 一种大型地下管道镇墩 | |
CN105136015B (zh) | 一种混凝土坝与土石坝连接结构界面变形监测仪器及方法 | |
CN204534141U (zh) | 一种地下管道接口渗漏的预警监测系统 | |
CN215804549U (zh) | 一种地铁长壁杯形水平冻结的冻胀力监测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R Free format text: FORMER NAME: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD. Owner name: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD. Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP |
|
CP01 | Change in the name or title of a patent holder |
Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd. Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee before: HydroChina Guiyang Engineering Corp. Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee after: POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang Patentee before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd. |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20130605 Effective date of abandoning: 20151230 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20130605 Effective date of abandoning: 20151230 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |