CN202964637U - Opening and marking device for ship side tube - Google Patents

Opening and marking device for ship side tube Download PDF

Info

Publication number
CN202964637U
CN202964637U CN 201220731809 CN201220731809U CN202964637U CN 202964637 U CN202964637 U CN 202964637U CN 201220731809 CN201220731809 CN 201220731809 CN 201220731809 U CN201220731809 U CN 201220731809U CN 202964637 U CN202964637 U CN 202964637U
Authority
CN
China
Prior art keywords
fixed
rod
support bar
laser pen
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220731809
Other languages
Chinese (zh)
Inventor
睢亮亮
马宁
张国福
于海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bohai Shipbuilding Heavy Industry Co Ltd
Original Assignee
Bohai Shipyard Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bohai Shipyard Group Co Ltd filed Critical Bohai Shipyard Group Co Ltd
Priority to CN 201220731809 priority Critical patent/CN202964637U/en
Application granted granted Critical
Publication of CN202964637U publication Critical patent/CN202964637U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides an opening and marking device for a ship side tube. A magnetic switch is mounted on a base, a goniometer is arranged on one side face of the base, a support rod is fixed on the base face on the position of the goniometer, a rotating rod is sleeved on the support rod, a watch hole is formed in the support rod, the rotating rod is fixed on the support rod through a locating gasket, one side of the rotating rod is connected with a transverse adjusting lever, a transverse adjusting tube is sleeved on the transverse adjusting lever, the transverse adjusting tube is fixed on the transverse adjusting lever through an adjusting screw rod, a marking needle seat is mounted on the end portion of the transverse tube through a locating screw, a marking needle penetrates through the marking needle seat, a laser pen seat is mounted on the support rod through a transition rod, and a laser pen is fixed on the laser pen seat through a lock screw. By means of the opening and marking device for the ship side tube, labor intensity and labor time are reduced, technology precision of tube opening is improved, and work efficiency is improved. The opening and marking device for the ship side tube is suitable for being used as a ship machining and marking tool.

Description

Boats and ships side of a ship side pipe perforate chalker
Technical field
The utility model provides the boats and ships side of a ship side pipe perforate chalker for the perforate of boats and ships side of a ship N-Side surf.
Background technology
In topside linear surface perforate process, the workmen slings pipeline with actual pipeline as a reference, repeatedly rules and cuts at the ship side panel.So not only lost time but also increased constructor's labour intensity.The trouble that actual heavy caliber pipeline is sling is exempted in the application of this device, solves the problem of the cutting of constantly ruling take actual pipeline as benchmark, and guarantees the perforate precision.
Summary of the invention
In order to overcome the shortcoming of existing chalker, the utility model provides boats and ships side of a ship side pipe perforate chalker.This device solves the technical problem of boats and ships side of a ship side pipe perforate line by by swingle, scriber and laser pen are installed on pedestal.
The technical scheme that the utility model technical solution problem adopts:
magnet contactor is housed on pedestal, be provided with bevel protractor on pedestal one side, be fixed with support bar on the seat surface of bevel protractor position, on support bar, cover has swingle, be provided with peep hole on support bar, by locating shim, swingle is fixed on support bar, a side at swingle is connected with the lateral adjustments bar, be set with the lateral adjustments pipe on the lateral adjustments bar, the lateral adjustments pipe is fixed on the lateral adjustments bar by adjusting screw(rod), end at the lateral adjustments pipe is equipped with the scriber seat by positioning screw, be installed with scriber in the scriber seat, by transiting rod, the laser pen stand is installed on support bar, be fixed with laser pen by tie down screw on the laser pen stand.
Good effect, the utility model can reduce workmen's labour intensity and the time, have increased the craft precision of pipeline perforate, have improved operating efficiency.Suitable to the use of hull processing scoring tool.
Description of drawings
Fig. 1 is the utility model structure chart
In figure, 1. pedestal, 2. magnet contactor, 3. bevel protractor, 4. peep hole, 5. swingle, 6. locating shim, 7. support bar, 8. lateral adjustments bar, 9. lateral adjustments pipe, 9.1. adjusting screw(rod), 10. positioning screw, 11. scriber, 12. scriber seats, 13. transiting rods, 14. the laser pen stand, 15. tie down screws, 16. laser pens.
The specific embodiment
According to the figure:
magnet contactor 2 is housed on pedestal 1, be provided with bevel protractor 3 on pedestal one side, be fixed with support bar 7 on the seat surface of bevel protractor position, on support bar, cover has swingle 5, be provided with peep hole 4 on support bar, by locating shim 6, swingle is fixed on support bar, a side at swingle is connected with lateral adjustments bar 8, be set with lateral adjustments pipe 9 on the lateral adjustments bar, the lateral adjustments pipe is fixed on the lateral adjustments bar by adjusting screw(rod) 9.1, end at the lateral adjustments pipe is equipped with scriber seat 12 by positioning screw 10, be installed with scriber 11 in the scriber seat, by transiting rod 13, laser pen stand 14 is installed on support bar, be fixed with laser pen 16 by tie down screw 15 on the laser pen stand.
Use of the present utility model:
According to side of a ship lateral line and the shape that is connected the setting-out pipeline, support bar is adjusted angle, if side of a ship lateral line has the camber requirement, then adjust transiting rod and laser pen stand, regulate with bevel protractor during adjustment.If being straight length, pipeline just transiting rod and laser pen stand furnishing and support bar are got final product on a horizontal line.Can see scale on pedestal upper angle chi by the peep hole on support bar.According to the radius of pipeline construction drawing upper pipeline, the distance at rotation lateral adjustments pipe and measurement and scriber seat center, center makes it identical with the pipeline radius.Close adjusting screw(rod).Rotation scriber seat makes scriber vertical with ship side, closes positioning screw.Blind plate be installed on the pipe flange that has installed that side of a ship side pipe connects and drawn the center on blind plate, opening the laser pen Emission Lasers and determine laser spots and blind plate center superposition.Hand-held lateral adjustments bar is done and is clockwise rotated, and scriber will move up and down along the fluctuating of hull, finally draws the ellipse that side of a ship side pipe intersects with it on hull.This device has reduced workmen's labour intensity and the time, has increased the craft precision of pipeline perforate, has improved operating efficiency.
Concrete steps:
(1), first determine perforate coordinate central point according to pipeline construction drawing or installation diagram before the installation.Central point determine can with drawing setting-out models coupling, fast and easy is accurate like this.
(2), according to side of a ship lateral line and the shape that is connected the setting-out pipeline, support bar 7 is adjusted angles, as side of a ship lateral line, the camber requirement is arranged, then adjusts transiting rod 13 and laser pen stand 14, regulate with bevel protractor during adjustment.As do not have, just with transiting rod 13 and laser pen stand 14 furnishings and support bar 7 on a horizontal line.Can see scale on bevel protractor 3 by peep hole 4.
(3), angle adjustment good after, the bottom pointer of support bar 7 is aligned in centre coordinate on topside.Magnet contactor 2 is opened, and at this moment pedestal 1 will be by magnetic attraction on side plate.
(4), unclamp adjusting screw(rod) 9.1, according to the radius of pipeline construction drawing upper pipeline, rotation lateral adjustments pipe 9 is also measured the distance at scriber seat center, support bar center, makes it identical with the pipeline radius.The locking adjusting screw(rod).Unclamp positioning screw 10 rotation scriber seats 12 and make scriber 11 vertical with ship side, locking positioning screw rod 10 can not move scriber seat 12.
(5), blind plate is installed on the setting-out pipe flange that side of a ship side pipe connects and is drawn the center on blind plate, open laser pen 16 Emission Lasers and determine laser spots and blind plate center superposition.
(6), hand-held swingle 5 does and clockwise rotates, scriber 11 will move up and down along the fluctuating of hull, finally draws the ellipse that side of a ship side pipe intersects with it on hull.
Advantage:
Floor installation magnetic devices, can directly be fixed on the topside hull during application, the used time closing switch can not taken away.Base and upper support bar have bevel protractor, can be according to the angular adjustment of side of a ship side pipe.Be provided with transiting rod and can simulate the pipeline of camber, at support bar end installation laser pen, be used for coordinating transition conduit and support bar to determine position of opening according to the principle of two one lines.Different according to pipeline diameter, device bumps against because of narrow space and Ship Structure when avoiding drawing pipe with small pipe diameter with adjustable lever.Scriber moves up and down, and avoids the conventional radial bar to move up and down along support bar and stuck situation generation occurs.

Claims (1)

1. boats and ships side of a ship side pipe perforate chalker, it is characterized in that: magnet contactor (2) is housed on pedestal (1), be provided with bevel protractor (3) on pedestal one side, be fixed with support bar (7) on the seat surface of bevel protractor position, on support bar, cover has swingle (5), be provided with peep hole (4) on support bar, by locating shim (6), swingle is fixed on support bar, a side at swingle is connected with lateral adjustments bar (8), be set with lateral adjustments pipe (9) on the lateral adjustments bar, the lateral adjustments pipe is fixed on the lateral adjustments bar by adjusting screw(rod) (9.1), end at the lateral adjustments pipe is equipped with scriber seat (12) by positioning screw (10), be installed with scriber (11) in the scriber seat, by transiting rod (13), laser pen stand (14) is installed on support bar, be fixed with laser pen (16) by tie down screw (15) on the laser pen stand.
CN 201220731809 2012-12-27 2012-12-27 Opening and marking device for ship side tube Expired - Fee Related CN202964637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220731809 CN202964637U (en) 2012-12-27 2012-12-27 Opening and marking device for ship side tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220731809 CN202964637U (en) 2012-12-27 2012-12-27 Opening and marking device for ship side tube

Publications (1)

Publication Number Publication Date
CN202964637U true CN202964637U (en) 2013-06-05

Family

ID=48505764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220731809 Expired - Fee Related CN202964637U (en) 2012-12-27 2012-12-27 Opening and marking device for ship side tube

Country Status (1)

Country Link
CN (1) CN202964637U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104070515A (en) * 2014-06-30 2014-10-01 中船黄埔文冲船舶有限公司 Hole opening tool for pipe holes on inclined wall of ship
CN104759644A (en) * 2015-03-18 2015-07-08 陕西国防工业职业技术学院 Laser tool checking instrument for numerical control lathe and tool checking method
CN107671828A (en) * 2017-11-08 2018-02-09 荆门天阁动力机械科技有限责任公司 Strange stone matches somebody with somebody seat line tool
CN108393858A (en) * 2018-03-27 2018-08-14 五冶集团上海有限公司 One kind is adjustable to be plan and its applies
CN108426514A (en) * 2016-02-02 2018-08-21 福建省马尾造船股份有限公司 A kind of determination rudder system of dependable performance comes about the equipment of angle
CN110202539A (en) * 2019-06-27 2019-09-06 中船黄埔文冲船舶有限公司 A kind of three-dimensional lineation device
CN110253522A (en) * 2019-07-23 2019-09-20 江南造船(集团)有限责任公司 A kind of curved surface lineation device peculiar to vessel
CN114029914A (en) * 2021-12-10 2022-02-11 湖南喜传天下家居有限公司 Parlor house beautifies with elliptical mirror marking device
CN114505838A (en) * 2021-12-08 2022-05-17 上海江南长兴造船有限责任公司 Anchor chain cylinder oblique cutting surface allowance cutting method
CN114589673A (en) * 2022-04-02 2022-06-07 广船国际有限公司 Method for processing scribing compass and rudder propeller flange base

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104070515A (en) * 2014-06-30 2014-10-01 中船黄埔文冲船舶有限公司 Hole opening tool for pipe holes on inclined wall of ship
CN104759644A (en) * 2015-03-18 2015-07-08 陕西国防工业职业技术学院 Laser tool checking instrument for numerical control lathe and tool checking method
CN108426514A (en) * 2016-02-02 2018-08-21 福建省马尾造船股份有限公司 A kind of determination rudder system of dependable performance comes about the equipment of angle
CN107671828B (en) * 2017-11-08 2020-04-14 荆门一天阁动力机械科技有限责任公司 Line drawing tool for peculiar stone matching seat
CN107671828A (en) * 2017-11-08 2018-02-09 荆门天阁动力机械科技有限责任公司 Strange stone matches somebody with somebody seat line tool
CN108393858A (en) * 2018-03-27 2018-08-14 五冶集团上海有限公司 One kind is adjustable to be plan and its applies
CN110202539A (en) * 2019-06-27 2019-09-06 中船黄埔文冲船舶有限公司 A kind of three-dimensional lineation device
CN110253522A (en) * 2019-07-23 2019-09-20 江南造船(集团)有限责任公司 A kind of curved surface lineation device peculiar to vessel
CN114505838A (en) * 2021-12-08 2022-05-17 上海江南长兴造船有限责任公司 Anchor chain cylinder oblique cutting surface allowance cutting method
CN114029914A (en) * 2021-12-10 2022-02-11 湖南喜传天下家居有限公司 Parlor house beautifies with elliptical mirror marking device
CN114029914B (en) * 2021-12-10 2024-03-05 湖南喜传天下家居有限公司 Elliptical mirror scribing device for living room home beautification
CN114589673A (en) * 2022-04-02 2022-06-07 广船国际有限公司 Method for processing scribing compass and rudder propeller flange base
CN114589673B (en) * 2022-04-02 2024-02-06 广船国际有限公司 Marking gauge and rudder propeller flange base processing method

Similar Documents

Publication Publication Date Title
CN202964637U (en) Opening and marking device for ship side tube
CN103056569B (en) Hole-opening cutting method for ship broadside pipes
CN103056911B (en) Boats and ships side of a ship side pipe curved surface perforate cutting method
CN103101612B (en) Rudder propeller substrate installation method
CN203811115U (en) Measurement tool for shafting alignment
CN203964806U (en) A kind of form and position tolerance pick-up unit
CN204785363U (en) Frock that theodolite was fixed and was adjusted in shipbuilding
CN204788890U (en) Full flow field velocity of flow measuring device of laboratory basin experiment
CN204085423U (en) A kind of space plane angle measurement mechanism
CN109986526B (en) Tapping frock of topside pipe mounting hole of boats and ships cabin
CN203109933U (en) Line drawing assisting device
CN203993865U (en) A kind of arbitrarily angled pipe communicated wire chalker
CN201471049U (en) Circle gas cutting device
CN202547630U (en) Device for measuring shape error of pressure vessel head
CN101793507B (en) Method for measuring linearity of rudder pintle and rudder lever of large-size vessel
CN104325453B (en) A kind of curved surface circular hole line boring device and method
CN204007608U (en) A kind of for controlling the level angle measurement mechanism of ship surface moulding bed angle of assembling
CN102506655B (en) Device for measuring and positioning fine-wire-drawing shaft holes of ship
CN205280009U (en) High accuracy detection system indexing means
CN209986933U (en) Hole opening tool for shipboard pipe mounting hole of ship engine room
CN104097196B (en) A kind of projection scribble method for large-scale diesel engine support
CN205448941U (en) Supplementary magnetism square that detects usefulness
CN202398923U (en) Gas cutting gauge capable of fixing scale at multiple positions
CN211918953U (en) Boats and ships complex construction trompil measuring tool
CN211867792U (en) Marine curved surface marking and positioning tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BOHAI SHIP HEAVY INDUSTRY CO LTD.

Free format text: FORMER OWNER: BOHAI SHIPYARD GROUP CO., LTD.

Effective date: 20140402

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 125003 HULUDAO, LIAONING PROVINCE TO: 125004 HULUDAO, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140402

Address after: 125004 Huludao City, Liaoning province Longgang District Jinhu Road No. 132

Patentee after: Bohai Ship Heavy Industry Co., Ltd.

Address before: 125003 Huludao City, Liaoning province Longgang District Jinhu Road No. 132

Patentee before: Bohai Shipyard Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20181227

CF01 Termination of patent right due to non-payment of annual fee