CN202952240U - Large straight pipe system fabrication platform - Google Patents

Large straight pipe system fabrication platform Download PDF

Info

Publication number
CN202952240U
CN202952240U CN 201220659425 CN201220659425U CN202952240U CN 202952240 U CN202952240 U CN 202952240U CN 201220659425 CN201220659425 CN 201220659425 CN 201220659425 U CN201220659425 U CN 201220659425U CN 202952240 U CN202952240 U CN 202952240U
Authority
CN
China
Prior art keywords
platform
pipe
school
sag
locating piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220659425
Other languages
Chinese (zh)
Inventor
张旭波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINHAI HEAVY INDUSTRY Co Ltd
Original Assignee
JINHAI HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINHAI HEAVY INDUSTRY Co Ltd filed Critical JINHAI HEAVY INDUSTRY Co Ltd
Priority to CN 201220659425 priority Critical patent/CN202952240U/en
Application granted granted Critical
Publication of CN202952240U publication Critical patent/CN202952240U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a large straight pipe system fabrication platform, comprising a tube calibrating platform, wherein a plurality of V-shaped pipe positioning blocks which are linearly arranged for placing a straight pipe are arranged on the tube calibrating platform; a plurality of sag backup plates which are used for adjusting the verticality of a flange on the straight pipe in cooperation with a rectangle ruler are arranged on one side of each V-shaped pipe positioning block on the tube calibrating platform; the plurality of sag backup plates are arranged on a same straight line and parallel to the straight line on which the V-shaped pipe positioning blocks are arranged; and the sag backup plates are arranged vertically to the tube calibrating platform. The large straight pipe system fabrication platform has the advantages that two flange end faces of the pipe during a fabrication process are parallel; and non-deviation and non-distorting in field installation are ensured, so that the pipe system is beautiful to install.

Description

Large-scale straight tube piping is made platform
Technical field
The utility model belongs to the shipbuilding technical field, and the large-scale straight tube piping that is specifically related to a kind of boats and ships is made platform.
Background technology
From going into operation of the mammoth tanker VLCC of company in 2010, a large amount of large-scale straight tube pipings (internal diameter is greater than 550A) occurred in piping processing, the existing straight tube pipe reshaping machine of pepe shop can't meet need of production (the maximum processing of pepe shop Semi-automatic straight pipe reshaping machine internal diameter is 550A).Because pipe has certain winding degree, common platform can't guarantee the parallel of pipe two end face of flange when making pipe, causes pipe that sideslip distortion while connecting is installed.So just to outfield, install and brought difficulty, affect whole project progress.
Summary of the invention
The purpose of this utility model is to provide a kind of and guarantees that pipe makes the parallel of two end face of flange, guarantees that outfield installs that sideslip is not non-warping, makes piping that large-scale straight tube piping attractive in appearance is installed and makes platform.
For reaching the goal of the invention the technical solution adopted in the utility model, be:
Large-scale straight tube piping is made platform, it is characterized in that: comprise a school pipe platform, on the pipe platform of described school, a plurality of sub-locating pieces of v-shaped tube that are provided in line placing straight tube are installed; A side at the sub-locating piece of v-shaped tube on the pipe platform of described school is equipped with a plurality of sag backup plates of adjusting straight tube upper flange perpendicularity that coordinate with square, a plurality of described sag backup plates are on same straight line and be parallel to the residing straight line of the sub-locating piece of described v-shaped tube, and platform is vertical arranges for described sag backup plate and school pipe.
Further, described school pipe platform is provided with and makes the locating piece draw-in groove of the sub-locating piece of v-shaped tube on same straight line.
School of the present utility model pipe platform can be bought also available steel plate self-control, must guarantee the flatness of school pipe platform.The sub-locating piece of v-shaped tube can be bought also can pass through the line cutting processing, must guarantee consistent size.The locating piece draw-in groove can be made with angle steel or band steel welding, and the locating piece draw-in groove is the assurance of the sub-locating piece of v-shaped tube on same straight line, and point is welded on the pipe platform of school, during installation, must guarantee on same straight line.The sag backup plate can be made with Plate Welding, the glacing flatness of necessary assurance backup plate face, and the sag backup plate is to guarantee the parallel foundations of pipe two end face of flange, and point is welded on the pipe platform of school, and necessary assurance when mounted is parallel with the locating piece draw-in groove, vertical with school pipe platform.
School is placed in pipe on the sub-locating piece of v-shaped tube while managing, mounting flange is adjusted the corner of flange, in the spot welding of flange top, utilizing square to lean against on the pipe platform of school is first adjusted the perpendicularity of flange and school pipe platform, carry out spot welding in the flange bottom after adjustment completes, then square is against on the sag backup plate to the perpendicularity adjustment of carrying out flange and sag backup plate.The flange installation method at two ends is identical, finally pipe is carried out the check of each side process data again.So just can guarantee that pipe makes the parallel of two end face of flange, guarantee that outfield installs that sideslip is not non-warping, piping be installed attractive in appearance.
The utility model has the advantage of: can guarantee that pipe makes the parallel of two end face of flange, guarantee that outfield installs that sideslip is not non-warping, piping be installed attractive in appearance.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with specific embodiment, the utility model is further described, but the utility model is not confined to these specific embodiment.One skilled in the art would recognize that the utility model contained all alternatives, improvement project and the equivalents that may comprise in claims scope.
With reference to Fig. 1, large-scale straight tube piping is made platform, comprises a school pipe platform 1, on the pipe platform 1 of described school, a plurality of sub-locating pieces 2 of v-shaped tube that are provided in line placing straight tube is installed; A side at the sub-locating piece 2 of v-shaped tube on the pipe platform 1 of described school is equipped with a plurality of sag backup plates 4 of adjusting straight tube upper flange perpendicularity that coordinate with square, a plurality of described sag backup plates 4 are on same straight line and be parallel to the residing straight line of the sub-locating piece 2 of described v-shaped tube, and the vertical setting of platform 1 is managed in described sag backup plate 4 and school.
Described school pipe platform 1 is provided with and makes the locating piece draw-in groove 3 of the sub-locating piece 2 of v-shaped tube on same straight line.
School of the present utility model pipe platform 1 can be bought also available steel plate self-control, must guarantee the flatness of school pipe platform 1.The sub-locating piece 2 of v-shaped tube can be bought also can pass through the line cutting processing, must guarantee consistent size.Locating piece draw-in groove 3 can be made with angle steel or band steel welding, and locating piece draw-in groove 3 is the assurances on same straight line of the sub-locating piece 2 of v-shaped tube, and point is welded on the pipe platform 1 of school, during installation, must guarantee on same straight line.Sag backup plate 4 can be made with Plate Welding, the glacing flatness of necessary assurance backup plate face, and sag backup plate 4 is to guarantee the parallel foundations of pipe two end face of flange, and point is welded on the pipe platform 1 of school, and necessary assurance when mounted is parallel with locating piece draw-in groove 3, vertical with school pipe platform 1.
School is placed in pipe on the sub-locating piece 2 of v-shaped tube while managing, mounting flange is adjusted the corner of flange, in the spot welding of flange top, utilizing square to lean against on the pipe platform 1 of school is first adjusted the perpendicularity of flange and school pipe platform 1, carry out spot welding in the flange bottom after adjustment completes, then square is against on sag backup plate 4 to the perpendicularity adjustment of carrying out flange and sag backup plate 4.The flange installation method at two ends is identical, finally pipe is carried out the check of each side process data again.So just can guarantee that pipe makes the parallel of two end face of flange, guarantee that outfield installs that sideslip is not non-warping, piping be installed attractive in appearance.

Claims (2)

1. large-scale straight tube piping is made platform, it is characterized in that: comprise a school pipe platform, on the pipe platform of described school, a plurality of sub-locating pieces of v-shaped tube that are provided in line placing straight tube are installed; A side at the sub-locating piece of v-shaped tube on the pipe platform of described school is equipped with a plurality of sag backup plates of adjusting straight tube upper flange perpendicularity that coordinate with square, a plurality of described sag backup plates are on same straight line and be parallel to the residing straight line of the sub-locating piece of described v-shaped tube, and platform is vertical arranges for described sag backup plate and school pipe.
2. large-scale straight tube piping according to claim 1 is made platform, it is characterized in that: described school pipe platform is provided with and makes the locating piece draw-in groove of the sub-locating piece of v-shaped tube on same straight line.
CN 201220659425 2012-11-30 2012-11-30 Large straight pipe system fabrication platform Expired - Fee Related CN202952240U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220659425 CN202952240U (en) 2012-11-30 2012-11-30 Large straight pipe system fabrication platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220659425 CN202952240U (en) 2012-11-30 2012-11-30 Large straight pipe system fabrication platform

Publications (1)

Publication Number Publication Date
CN202952240U true CN202952240U (en) 2013-05-29

Family

ID=48457833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220659425 Expired - Fee Related CN202952240U (en) 2012-11-30 2012-11-30 Large straight pipe system fabrication platform

Country Status (1)

Country Link
CN (1) CN202952240U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106926971A (en) * 2017-02-28 2017-07-07 中船西江造船有限公司 Pipeline internal field makes and detecting tool
CN112247945A (en) * 2020-10-14 2021-01-22 天津大学 Multifunctional test pipe fitting pretreatment operation platform
CN112276885A (en) * 2020-10-14 2021-01-29 天津大学 Radial operation platform for test pipe fitting

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106926971A (en) * 2017-02-28 2017-07-07 中船西江造船有限公司 Pipeline internal field makes and detecting tool
CN112247945A (en) * 2020-10-14 2021-01-22 天津大学 Multifunctional test pipe fitting pretreatment operation platform
CN112276885A (en) * 2020-10-14 2021-01-29 天津大学 Radial operation platform for test pipe fitting
CN112247945B (en) * 2020-10-14 2022-07-19 天津大学 Multifunctional test pipe pretreatment operation platform

Similar Documents

Publication Publication Date Title
CN202952240U (en) Large straight pipe system fabrication platform
CN203900789U (en) Three-way valve body overlap welding tool
CN203281663U (en) Novel wallboard throat structure of bending machine
CN103434611A (en) High-precision control method for building large ship
CN205271305U (en) Group of ocean module drilling machine high pressure line is to using special fixture
CN103056610A (en) H-shaped steel online continuous production method
CN103418969A (en) Special-shaped pipe fitting welding auxiliary clamp
CN104400430B (en) The automatic production process of steel pipe bundle combinative structure component and equipment thereof
CN204397390U (en) A kind of swing arm machine clamp
CN203292744U (en) Assembling tool of tower equipment
CN202175800U (en) Installation device for flyover and aluminum cover of computer flat knitting machine
CN103128570B (en) Angle fitting chamfer angle mold
CN204321461U (en) Vavle shelf frock
CN101712104B (en) Method for forming vehicle-mounted oil tank body
CN104227208A (en) Automatic cutting equipment for steel pipe
CN204430674U (en) A kind of forklift fuel tank rapid-assembling equipment
CN106624527A (en) Welding flange positioning tooling
CN204346173U (en) A kind of welding stock column cap
CN204075618U (en) A kind of steel-pipe welding device
CN203526849U (en) Tangential ventilator outer cylinder positioning tool
CN103895110A (en) Plaster line cutting device
CN202114484U (en) Machining device capable of clamping components with end faces in different angles
CN203665002U (en) Tool for rapidly assembling flange pup joints
CN203209892U (en) Paired full-symmetric cylindrical membrane-type wall toolings
CN107695550A (en) A kind of processing method of truss-type cantilever crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529

Termination date: 20191130

CF01 Termination of patent right due to non-payment of annual fee