CN202947404U - Cooling device for preparation link of silicone sealant - Google Patents

Cooling device for preparation link of silicone sealant Download PDF

Info

Publication number
CN202947404U
CN202947404U CN2012206059912U CN201220605991U CN202947404U CN 202947404 U CN202947404 U CN 202947404U CN 2012206059912 U CN2012206059912 U CN 2012206059912U CN 201220605991 U CN201220605991 U CN 201220605991U CN 202947404 U CN202947404 U CN 202947404U
Authority
CN
China
Prior art keywords
water
cistern
storage pool
cooling
water storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012206059912U
Other languages
Chinese (zh)
Inventor
严华宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hua Si new Mstar Technology Ltd
Original Assignee
SHANGHAI HUAGUI SPECIAL CHEMICALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HUAGUI SPECIAL CHEMICALS CO Ltd filed Critical SHANGHAI HUAGUI SPECIAL CHEMICALS CO Ltd
Priority to CN2012206059912U priority Critical patent/CN202947404U/en
Application granted granted Critical
Publication of CN202947404U publication Critical patent/CN202947404U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/10Process efficiency

Abstract

The utility model relates to a cooling device, in particular to the cooling device for a preparation link of silicone sealant. The cooling device for the preparation link of the silicone sealant comprises a normal temperature cooling tower, a first water storage pool connected with the normal temperature cooling tower connected through a heat preservation pipe, a freezing unit connected with the first water storage pool through a heat preservation pipe and a second water storage pool connected with the other end of the freezing unit through a heat preservation pipe. The first water storage pool is in an opening type and a running water pipe is arranged above the first water storage pool. The second water storage pool is in a closed type and a heat preservation shell is arranged. The cooling device for the preparation link of the silicone sealant adopts two-level cooling arrangement so that hot water is cooled in an environment-friendly and energy-saving mode. Due to arrangement of the opening type first water storage pool and water is supplied to the first water storage pool through running water, salinity of cooling water after long-term use is not increased rapidly.

Description

A kind of heat sink for preparing link for silicone sealant
Technical field
The utility model relates to a kind of heat sink, particularly a kind of heat sink for preparing link for silicone sealant.
Background technology
The effect of cooling tower is that the recirculated water that will carry waste heat carries out heat exchange at Ta Nei and air, and the heat of water is transferred to air and spills into atmosphere, and recirculated water is lowered the temperature.Cooling tower is divided into wet cooling tower and two kinds of forms of dry cooling tower by the way of contact of recirculated water and air.
In wet cooling tower, the recirculated water of being sowed at filling surface directly contacts with air, by transmission of heat by contact and evaporative heat loss, the heat of water is transferred to air.The heat exchanger effectiveness of wet tower is high, and the limiting temperature that water is cooled is the wet-bulb temperature of air.But water causes loss because of evaporation; And evaporation makes again the cooling water salinity of circulation increase, for stabilizing water quality, the normal other filter method of dosing and the blowdown method of adopting, wherein blowdown method is because of investment and operating cost is low widely uses, and its processing method higher water of a part of salinity of namely draining relies on supplementing water to reduce salinity, namely there is the blowdown loss, must have new water to replenish, in addition, the water that wafts also can cause the loss of water.Simultaneously, can condense into water smoke at cooling tower exit damp-heat air, cause ambient light contamination and affect the local climate environment.
In dry cooling tower, the heat exchange of recirculated water and air is to conduct heat by the radiator wall, and the heat of managing interior water is transferred to the air that radiator flows outward.Because water does not directly contact with air, therefore dried tower does not have evaporation of water, so there is no the evaporation of water loss, cooling tower exports also without water smoke.But because the cooling limit temperature of dried tower is the dry-bulb temperature of air, and the specific heat of air is little, and the heat-exchange capacity of dried tower is far below wet tower, so dried tower needs a large amount of materials such as metal, so its cost is more than wanting high with capacity wet type tower.
Dry cooling tower and wet cooling tower respectively have merits and demerits, in existing cooling device, be badly in need of a kind of can effective temperature-reducing and the environmental protection power consumption is low, cost and the low cooling device of operating cost.
Summary of the invention
The present invention provides a kind of heat sink for preparing link for silicone sealant for addressing the above problem.
A kind of heat sink for preparing link for silicone sealant, it is characterized in that, described heat sink comprise the normal temperature cooling tower, with utilidor connect the normal temperature cooling tower the first cistern, with utilidor connect the first cistern freezing unit, connect the second cistern of the freezing unit other end with utilidor, described the first cistern is open, the top arranges running water pipe, described the second cistern is closed, and lagging casing is set.
Hot water is by the cooling of normal temperature cooling tower, produce heat exchange with airborne air, make hot water be cooled to normal temperature, flow to the first cistern, the first cistern can come amount of makeup water by running water, with the too high problem of cooling water salinity after the solution heat exchange, the first cistern is arranged to open, to facilitate the replacing of cooling water.The first cistern is communicated to freezing unit, and the water for cooling that freezing unit will be cooled to normal temperature is to lower temperature, as 5 ℃, and cooling water flow to the second cistern after freezing, the second cistern adopts the sealing insulation to arrange, and is provided with lagging casing.
Described normal temperature cooling tower is wet cooling tower or dry cooling tower.
The utility model has following beneficial effect:
1. heat sink of the present utility model adopts 2 grades of coolings to arrange, the hot water environmental protection more, energy-conservation of lowering the temperature.
2. by the first open cistern is set, by the running water supplementing water, make that the salinity of cooling water can not raise fast after long-term use.
3. can realize that normal temperature is cooling, energy savings by closing freezing unit in winter.
Description of drawings
Fig. 1 is a kind of schematic diagram for preparing the heat sink of link for silicone sealant.
The specific embodiment
Embodiment 1:
As shown in Figure 1, heat sink comprise the normal temperature cooling tower, with utilidor connect the normal temperature cooling tower the first cistern, with utilidor connect the first cistern freezing unit, connect the second cistern of the freezing unit other end with utilidor, described the first cistern is open, the top arranges running water pipe, described the second cistern is closed, and lagging casing is set.
Hot water produces heat exchange by the cooling of normal temperature wet cooling tower with airborne air, makes hot water be cooled to normal temperature, flow to the first cistern, the first cistern can come amount of makeup water by running water, and the first cistern is arranged to open, to facilitate the replacing of cooling water.The first cistern is communicated to freezing unit, freezing unit will be cooled to the water for cooling to 5 ℃ of normal temperature, cooling water flow to the second cistern after freezing, the second cistern adopts the sealing insulation to arrange, and is provided with lagging casing, and cold water flow to needs cooling device, become hot water through after heat exchange, again enter normal temperature, so circulation realizes cooling.
Embodiment 2:
As shown in Figure 1, heat sink comprise the normal temperature cooling tower, with utilidor connect the normal temperature cooling tower the first cistern, with utilidor connect the first cistern freezing unit, connect the second cistern of the freezing unit other end with utilidor, described the first cistern is open, the top arranges running water pipe, described the second cistern is closed, and lagging casing is set.
Hot water produces heat exchange by the cooling of normal temperature dry cooling tower with airborne air, makes hot water be cooled to normal temperature, flow to the first cistern, the first cistern can come amount of makeup water by running water, and the first cistern is arranged to open, to facilitate the replacing of cooling water.The first cistern is communicated to freezing unit, freezing unit will be cooled to the water for cooling to 5 ℃ of normal temperature, cooling water flow to the second cistern after freezing, the second cistern adopts the sealing insulation to arrange, and is provided with lagging casing, and cold water flow to needs cooling device, become hot water through after heat exchange, again enter normal temperature, so circulation realizes cooling.

Claims (2)

1. one kind is used for the heat sink that silicone sealant prepares link, it is characterized in that, described heat sink comprise the normal temperature cooling tower, with utilidor connect the normal temperature cooling tower the first cistern, with utilidor connect the first cistern freezing unit, connect the second cistern of the freezing unit other end with utilidor, described the first cistern is open, the top arranges running water pipe, described the second cistern is closed, and lagging casing is set.
2. a kind of heat sink for preparing link for silicone sealant as claimed in claim 1, is characterized in that, described normal temperature cooling tower is wet cooling tower or dry cooling tower.
CN2012206059912U 2012-11-16 2012-11-16 Cooling device for preparation link of silicone sealant Expired - Fee Related CN202947404U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206059912U CN202947404U (en) 2012-11-16 2012-11-16 Cooling device for preparation link of silicone sealant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206059912U CN202947404U (en) 2012-11-16 2012-11-16 Cooling device for preparation link of silicone sealant

Publications (1)

Publication Number Publication Date
CN202947404U true CN202947404U (en) 2013-05-22

Family

ID=48423101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206059912U Expired - Fee Related CN202947404U (en) 2012-11-16 2012-11-16 Cooling device for preparation link of silicone sealant

Country Status (1)

Country Link
CN (1) CN202947404U (en)

Similar Documents

Publication Publication Date Title
CN201697489U (en) Cooling tower
CN203812685U (en) Forced-oil circulation air-cooled transformer provided with wet-curtain cooling device
CN204301425U (en) A kind of new type solar energy agricultural byproducts drying equipment
CN205376688U (en) Group battery temperature regulating device for electric automobile
CN204795958U (en) High -efficient coolant tank
CN103791633B (en) A kind of solar energy air-heater
CN203177690U (en) Novel efficient water-saving air cooler
CN204665965U (en) A kind of intermediate synthetic ester cooling system
CN204043280U (en) Defrosting system of refrigerator
CN203501846U (en) Precooling vaporizing air cooler
CN202947404U (en) Cooling device for preparation link of silicone sealant
CN204694099U (en) A kind of transverse flow enclosed cooling tower
CN204494866U (en) A kind of low-loss flat-plate solar collector
CN203687413U (en) Solar air heating machine
CN202764188U (en) Water temperature control device of air-cooled extruder
CN203159649U (en) Blast furnace blast negative energy dehumidification device
CN205077045U (en) Solar energy combination formula methane -generating pit
CN203139920U (en) Solid water glass stewing system
CN105157447A (en) Closed heat insulation air cooler
CN203837562U (en) Heat pipe type cooling tower water-saving device
CN202041045U (en) Natural energy drying equipment with cooling fin heat exchanger
CN203421987U (en) Self-circulating-cooling device
CN207378949U (en) A kind of air source heat pump indoor unit
CN206787182U (en) A kind of air energy heat pump dryer of agricultural byproducts
CN205962058U (en) Energy -conserving big -arch shelter of self -power constant temperature

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180821

Address after: 224100 Bai Fu Industrial Park, Dafeng District, Yancheng City, Jiangsu

Patentee after: Jiangsu Hua Si new Mstar Technology Ltd

Address before: 201706 No. 1358, Zhao heavy road, Qingpu District, Shanghai

Patentee before: SHANGHAI HUAGUI SPECIAL CHEMICALS CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130522

Termination date: 20201116