CN202940542U CN 201220660175 CN201220660175U CN202940542U CN 202940542 U CN202940542 U CN 202940542U CN 201220660175 CN201220660175 CN 201220660175 CN 201220660175 U CN201220660175 U CN 201220660175U CN 202940542 U CN202940542 U CN 202940542U
Authority
CN
China
Prior art keywords
ice
melt
hanging device
tongue
melting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220660175
Other languages
Chinese (zh)
Inventor
犹永开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENG'AN POWER SUPPLY BUREAU
Original Assignee
WENG'AN POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENG'AN POWER SUPPLY BUREAU filed Critical WENG'AN POWER SUPPLY BUREAU
Priority to CN 201220660175 priority Critical patent/CN202940542U/en
Application granted granted Critical
Publication of CN202940542U publication Critical patent/CN202940542U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an ice-melting cable hanging device applicable to 10kV and 35kV lines. The device comprises a metal connecting plate (1) to which a double-tongue aluminum hook (2), an ice-melting wire (3) and an insulating rod (4) are connected. With the ice-melting cable hanging device, electricity testing and short circuit operations can be carried out without climbing the rod, an operator can complete all the operations easily by standing on the ground, only 12 minutes is needed from work permitting to ice-melting, only 6 ordinary workers are needed instead of 12 technicians needed originally, the number of workers is reduced, no skill is required for the workers, the workload is greatly reduced, and the risk that workers may fall off the rod when climbing the rod under a freezing weather condition can be avoided.

Description

Be applicable to the ice-melt cable hanging device of electric power 10kV and 35kV circuit
Technical field
The utility model relates to a kind of ice-melt cable hanging device that is applicable to electric power 10kV and 35kV circuit, belongs to electric power ice-melting device technical field.
Background technology
In recent years, due to being destroyed of natural environment, cause the frequent appearance of extreme climate, especially Shelter in South China Cities, often have the weather of congealing to occur winter, easily causes the power circuit icing, icing can cause that power circuit falls rod disconnection, causes electric grid large area power cut or causes electric network from collapsing.The large tracts of land of the most serious is once southern area in 2008 is congealed, and has caused that even Guizhou Power Grid partly disintegrates, and causes immeasurable loss.So various ice-melt measures are arisen at the historic moment, the 500kV circuit adopts DC de-icing device.For the circuit of 35kV and 10kV, usually adopt the ice-melt transformer circuit to be carried out the method for three-phase alternating current short circuit ice-melt.
Adopt the concrete deicing processes of ice-melt transformer, need to treat that first DC ice-melting transfers inspecting state to, in deicing processes, after the staff will first step on the true no-voltage of bar identification, again at job site two ends installing closure short-circuit grounding wire, then in the middle of, the staff could install ice-melt shorting stub or ice melting electric cable line by upper boom, it needs nearly 3 hours from work permit to the beginning ice-melt, after lower beam has been installed in ice melting electric cable or shorting stub, job site two ends staff upper boom again splits out short-circuit grounding wire, also will be from multiple aforesaid operations after the ice-melt end-of-job; Cause like this line short ground connection to need at least six technical ability personnel, ice melting electric cable connects needs six technical ability workmans at least.And in each job site, winter, the shaft tower surrounding also can icing, had strengthened and had stepped on the bar difficulty.Simultaneously, a large amount of valuable times of the work of loaded down with trivial details Pan Ta cost, make the condition of a disaster in short-term can't be controlled; And need 12 technical ability personnel to participate in simultaneously work because alternately stepping on bar at work, greatly reduce operating efficiency.
Summary of the invention
The technical problems to be solved in the utility model is: a kind of Pan Ta of need not is provided, and ice-melt cable hanging device rational in infrastructure, as simply to be applicable to electric power 10kV and 35kV circuit can overcome the deficiencies in the prior art.
The technical solution of the utility model is: be applicable to the ice-melt cable hanging device of electric power 10kV and 35kV circuit, it comprises metallic interconnect, is connected with two tongue aluminium hooks, ice-melt wire and insulating bar on metallic interconnect.
The quantity of two tongue aluminium hooks is two, and the spacing of 4-8cm is arranged between two two tongue aluminium are linked up with.
Described pair of two tongue aluminium hooks that tongue aluminium hook is used for grounding wire of power system.
Ice-melt wire and insulating bar are positioned at the tow sides of metallic interconnect.
Compared with the prior art, after adopting this ice-melt hanging device, its electrical verification, short circuit work, cable connect all can be without the upper boom operation, as long as every operation just can easily be completed on the ground in the station, only need 12 minutes by work permit to the beginning ice-melt, personnel reduce to six ordinary persons from 12 original technical ability, have not only reduced the quantity to the staff, and are also without any requirement to personnel's technical ability, workload reduces greatly, and the weather of avoiding congealing is stepped on the risk that personal height that bar brings falls.The quantity of two tongue aluminium hooks is two, the spacing that 4-8cm is arranged between two two tongue aluminium are linked up with, the two hooks of employing can increase the contact area with wire, and play shunting action, make in deicing processes not can be because of the loose contact conductor joint heating wire of burning, the effect of heat radiation is played in the space equally.Ice-melt wire and insulating bar are positioned at the tow sides of metallic interconnect, like this can stress equalization, the convenient connection, reduce the metallic interconnect area.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of this pair tongue aluminium hook.
Embodiment
embodiment 1: as depicted in figs. 1 and 2, metallic interconnect 1 adopts iron plate, it is about 5cm, wide ice-melt wire 3(aluminium row with being connected) with wide, thick approximately 4mm, be connected with two tongue aluminium hooks 2 that grounding wire of power system is used on metallic interconnect 1, ice-melt wire 3 and insulating bar 4, the quantity of two tongue aluminium hooks 2 is two, be screwed, two two tongue aluminium are linked up with the spacing that 4-8cm is arranged between 2, preferred 5cm, insulating bar 4 is connected between two pairs of tongue aluminium hooks 2, ice-melt wire 3(aluminium row) be connected to the another side of metallic interconnect 1, the connected mode of insulating bar 4 is that operation iron pull head is welded on iron plate, during use, its insulating bar is connected on the iron pull head and gets final product.
Using method
For articulating of line short circuit line: general distribution line ice melting current is below 500A, it is the soft copper wire of 120 square millimeters, long 2 meters with two joint sectional areas, two ends copper tip crimping, be separately fixed at the upper short circuit that forms of aluminium row of three cover combination tools, copper cash one head rest is taken advantage of a situation on line pole to be melted upwards, then dock next joint insulating bar from the lower end, the support of electric pole is arranged, insulating bar need not to bear too many weight.After three-phase is lengthened to sufficient length, insulating bar is left electric pole upright, owing to being that vertical direction is stressed, the situation that therefore exhausted action bars can not occur fractureing is articulated to the three-phase hook on circuit to be melted at last simultaneously, completes articulating of shorting stub.
For articulating of ice-melt transformer outlet: voltage goes out the high voltage insulated cable that the line options phase voltage is 10kV, and the class of insulation can meet the demands fully, and the weight of insulated wire itself is also light than cable far away.With the insulated wire of phase-splitting with aluminum connecting terminal and fastened by screw to aluminium row, insulating bar first is docked to enough length, then insulated wire is stretching along the action bars direction, be close at last action bars, and with Plastic Bandage with its colligation on action bars.Two meters places far away separate insulated wire apart from holding partly, away from the staff, the power-assisted of high voltage insulated cable are arranged, and have well strengthened the mechanical strength of insulating bar, have also well improved the problem that insulating bar rocks simultaneously.After three-phase connects respectively according to the method described above, action bars is erect, directly be articulated on circuit to be melted, tension downwards makes its contact-making surface contact good, completes the overlap joint to the outlet of ice-melt transformer.
For the circuit electrical verification: process screw thread on former insulating bar iron hook head, electroscope is screwed into fixing, insulating bar is served the circuit electrical verification with electroscope, if circuit is charged, can knows and see the electroscope flash of light, can clearly hear that electroscope reports to the police.The good like this problem that the bar electrical verification brings unsafe factor of stepping on that solved, the insulating bar of electrical verification simultaneously also has another purposes, one of processing is led and is angled on former insulating bar iron hook head, when conductor glaze formation, hang over attaching ice melting electric cable or shorting stub place with leading to angle, just pull gently and the icing of ice-melt place can be removed, the ice-melt shorting stub is contacted well with wire with ice melting electric cable.

Claims (4)

1. ice-melt cable hanging device that is applicable to electric power 10kV and 35kV circuit, it comprises metallic interconnect (1), it is characterized in that: be connected with two tongue aluminium hook (2), ice-melt wire (3) and insulating bars (4) on metallic interconnect (1).
2. the ice-melt cable hanging device that is applicable to electric power 10kV and 35kV circuit according to claim 1 is characterized in that: the quantity of two tongue aluminium hooks (2) is two, and the spacing of 4-8cm is arranged between two two tongue aluminium hooks (2).
3. the ice-melt cable hanging device that is applicable to electric power 10kV and 35kV circuit according to claim 1 and 2, is characterized in that: two tongue aluminium hooks that described pair of tongue aluminium hook (2) used for grounding wire of power system.
4. the ice-melt cable hanging device that is applicable to electric power 10kV and 35kV circuit according to claim 1 and 2, it is characterized in that: ice-melt wire (3) and insulating bar (4) are positioned at the tow sides of metallic interconnect (1).
CN 201220660175 2012-12-05 2012-12-05 Ice-melting cable hanging device applicable to 10kV and 35kV lines Expired - Fee Related CN202940542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220660175 CN202940542U (en) 2012-12-05 2012-12-05 Ice-melting cable hanging device applicable to 10kV and 35kV lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220660175 CN202940542U (en) 2012-12-05 2012-12-05 Ice-melting cable hanging device applicable to 10kV and 35kV lines

Publications (1)

Publication Number Publication Date
CN202940542U true CN202940542U (en) 2013-05-15

Family

ID=48324765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220660175 Expired - Fee Related CN202940542U (en) 2012-12-05 2012-12-05 Ice-melting cable hanging device applicable to 10kV and 35kV lines

Country Status (1)

Country Link
CN (1) CN202940542U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111106567A (en) * 2019-12-12 2020-05-05 贵州电网有限责任公司 Transmission line debris clearing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111106567A (en) * 2019-12-12 2020-05-05 贵州电网有限责任公司 Transmission line debris clearing device

Similar Documents

Publication Publication Date Title
CN102611061B (en) Single-pole ground loop type direct-current deicing method for overhead ground wire and OPGW (optical fiber composite overhead ground wire)
CN202749782U (en) Power-transmission-line ice melting system implemented by using switching operations in whole process
CN104868403A (en) Portable 120-to-400mm2 aluminum conductor steel reinforced cable shunting clamp and use method thereof
CN103490363A (en) Rapid Direct-current deicing short circuit device of electric transmission line
CN204046108U (en) Transmission line mechanical deicing device
CN104535804A (en) Portable current transformer test clamp
CN204439667U (en) A kind of portable type current transformer testing clamp
CN110932215A (en) System and method for deicing overhead line by using photovoltaic power generation
CN202940542U (en) Ice-melting cable hanging device applicable to 10kV and 35kV lines
CN102426963B (en) Direct-current ice-melting isolating switch
CN208078525U (en) Three-phase conducting wire for distribution network live line work upright bar struts insulating frame
CN201233972Y (en) Multifunctional connecting plug
CN202975728U (en) Remote monitoring system of icing on transmission lines
CN106469892A (en) A kind of ice-melt cable hanging device
CN102916372B (en) 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument
CN205123110U (en) Automatics of electrified montage fire of built on stilts distribution lines
CN106451231B (en) A kind of method of quick mounting power distribution network ice-melt connecting wire
CN202422954U (en) 10KV incoming bridge grounding conductor terminal for transformer
CN105262001A (en) Ice melting method for overhead ground wire of power transmission line
CN206117003U (en) Articulate distribution network ice -melt connecting wire's device fast
CN102510029A (en) Ground potential electrified bar cutter device changing method
CN203166450U (en) A detachable lightning arrester
CN204205258U (en) High-altitude dismounting grounding wire device
CN202997475U (en) Short circuit ice melting device used for three-phase power supply lines
CN208445087U (en) A kind of transmission line de-icing short-circuit device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130515

Termination date: 20171205

CF01 Termination of patent right due to non-payment of annual fee