Electric network management automated training system Download PDFInfo
- Publication number
- CN202939884U CN202939884U CN 201220618641 CN201220618641U CN202939884U CN 202939884 U CN202939884 U CN 202939884U CN 201220618641 CN201220618641 CN 201220618641 CN 201220618641 U CN201220618641 U CN 201220618641U CN 202939884 U CN202939884 U CN 202939884U
- Authority
- CN
- China
- Prior art keywords
- open3000
- server
- switch
- signal input
- open3000 system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012549 training Methods 0.000 title abstract description 13
- 238000012423 maintenance Methods 0.000 claims abstract description 4
- 230000011664 signaling Effects 0.000 description 19
- 238000005259 measurement Methods 0.000 description 10
- 238000004088 simulation Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 230000001105 regulatory effect Effects 0.000 description 4
- 238000012360 testing method Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000012467 final product Substances 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 238000012913 prioritisation Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model relates to an electric network management automated training system, comprising an OPEN3000 system simulator workstation, an OPEN3000 system front-end processor, a data switching exchange, a data network device, a background switchboard, an OPEN3000 system SCADA server, an OPEN3000 system history server, a PAS server, an automation maintenance workstation, a report form machine, a boundary switchboard, and a WEB server. Compared with the prior art, the system greatly improves security of electric network management automation operation personnel, and is characterized by low investment cost, good flexibility, easy and simple operation, and high practical value.
Description
Technical field
The utility model relates to the power network schedule automation experience system, belongs to the technical field of power network schedule automation.
Background technology:
Fast development along with computing machine, network, robotization and the communication technology, automation system for the power network dispatching has become the important technology support platform of guaranteeing power grid security, stable, economy, high-quality operation, its function and effect has become the indispensable important means of dispatching of power netwoks operational management, and the safe operation of electrical network more and more relies on automation system for the power network dispatching.
The structure of automation system for the power network dispatching becomes increasingly complex, by original tradition, single dispatch automated system develops into by data dispatching net, the connected interconnected huge automated system in vertical and horizontal province and district, county of secondary safety-protection system, and the technical know-how content of automation system for the power network dispatching is more and more higher.
Last year, Jiangsu Power Grid took the lead in carrying out at home " three collection five are large " reform, " large operation " ,“Di county is integrated " under New System over the ground, county adjusts robotization O&M personnel's level of skill to require more and more higher, and from the development trend of grid company, technical ability personnel's on duty level of skill and living the becoming a useful person fast of newly entering college are more and more paid attention to sharpen one's skills personnel's level of the various ways such as company constantly examines by carrying out unit training processed, Technique Authentication, Skill Competition, tune, two-unit-system large-scale competition in military skills.
Up to now, domestic electric company there is no training means and the system of system, maturation, normalization aspect the power network schedule automation specialty, and for security consideration, can't carry out on the system that a lot of technical ability troop trainings, system testing are operated in actual motion, limit to a great extent the lifting of robotization O&M personnel levels of skill.
The utility model content:
The technical problems to be solved in the utility model is to provide a kind of power network schedule automation experience system, realizes and the altitude simulation of actual motion system, reaches the effect of troop training under battle conditions.
In order to address the above problem, the utility model provides a kind of power network schedule automation experience system, comprise: OPEN3000 system simulator workstation, the OPEN3000 system front end processor be connected with the serial ports of OPEN3000 system simulator workstation, the data switching exchane be connected with OPEN3000 system front end processor, the data network equipment that one end is connected with data switching exchane and the other end is connected with OPEN3000 system simulator workstation, the backstage switch that signal input part is connected with OPEN3000 system front end processor, the OPEN3000 system SCADA server be connected with the signal input part of backstage switch, the OPEN3000 system history server be connected with the signal input part of backstage switch, the PAS server be connected with the signal input part of backstage switch, the automated maintenance workstation be connected with the signal input part of backstage switch, the form machine be connected with the signal input part of backstage switch, the edge switch be connected with the signal output part of backstage switch, the WEB server be connected with edge switch.
The technique effect that the utility model has with respect to existing technical scheme
(1) the power network schedule automation experience system of the utility model development is applied to power network schedule automation O&M personnel's daily training, technical ability troop training, fault handling, Skill Competition, the technological means of combat training is provided, allow and newly advance the requirement that the employee adapts to post as early as possible on the one hand, can be lifted on the other hand hillock, county's tune robotization O&M personnel's level of skill, for power grid security, stable operation provide better technical support.In the structure of said system, the transformation by existing retired equipment and system, realize building of power network schedule automation experience system hardware configuration.
(2) in the structure of said system, by adding of data network equipment (mainly comprising router, switch device) and secondary safety protection equipment (mainly comprising encryption device, fire wall, physical isolation equipment), realize the framework of complete automation system for the power network dispatching, reach the altitude simulation with real system, there is stronger Competitive effects.
(3), in the structure of said system, by the modification of software configuration and function, realize the adjustment of the experience system corresponding software part of automation system for the power network dispatching.By the installation of analogue communication software, take IEC101, IEC104 as communication protocol, realize transmitting-receiving and the functions such as remote control, remote regulating operation of automation system for the power network dispatching simulation real-time telemetry, remote signalling data.
(4) compared with prior art, the utility model has improved the security of power network schedule automation O&M personnel operation greatly, and have that cost of investment is low, dirigibility good, easy to operate succinct, characteristics that practical value is high.
The accompanying drawing explanation
For content of the present utility model is more likely to be clearly understood, below the specific embodiment by reference to the accompanying drawings of basis, the utility model is described in further detail, wherein:
?The hardware block diagram that Fig. 1 is power network schedule automation experience system of the present utility model.
Embodiment
See Fig. 1, power network schedule automation experience system of the present utility model, comprise: OPEN3000 system simulator workstation, the OPEN3000 system front end processor be connected with the serial ports of OPEN3000 system simulator workstation, the data switching exchane be connected with OPEN3000 system front end processor, the data network equipment that one end is connected with data switching exchane and the other end is connected with OPEN3000 system simulator workstation, the backstage switch that signal input part is connected with OPEN3000 system front end processor, the OPEN3000 system SCADA server be connected with the signal input part of backstage switch, the OPEN3000 system history server be connected with the signal input part of backstage switch, the PAS server be connected with the signal input part of backstage switch, the automated maintenance workstation be connected with the signal input part of backstage switch, the form machine be connected with the signal input part of backstage switch, the edge switch be connected with the signal output part of backstage switch, the WEB server be connected with edge switch.
The principle of simulator bitcom and using method:
This simulation softward utilizes OPEN3000 system simulator workstation to serve as the RTU of transformer station by serial ports and network mode, carry out data communication with two front end processors, (OPEN3000 system front end processor is asked mainly by IEC101 and IEC104 stipulations, to carry out question-response, the simulator workstation is answered), complete on the data of remote measurement, remote signalling the operation of sending with remote control.Remote measurement, remote signalling data are that the random value be sent in specialized range by simulator software carries out
Data upload, and remote control is after front end processor issues the preset order of remote control, finds the current remote signalling state of the object of wanting remote control, answers the message of returning to school, and then, after front end processor issues the remote control writ of execution, will carry out negate to its corresponding remote signalling state, the effect of analog telecommand success.Concrete configuration and function are as follows:
1, support at most 16 tunnels 104 or 16 tunnels 101, also can part 101 stipulations part 104 stipulations;
2, in the configuration, select GD_101 or GD_104 stipulations to get final product, generally support all detailed rules and regulations;
3, multichannel 104: configuration/channel parameters configuration, and port numbers is the 2404+ channel number, and what for example 1 passage was joined is 104 stipulations, and to listen port be the address that main website is filled out in 2405, ip address to frame;
4, multichannel 101: configuration/channel parameters, and port numbers is the machine serial ports, since 0, for example, equipment manager/serial ports/what see is serial ports 1, port numbers fills out 0, gives tacit consent to 8 start bits, 1 position of rest and even parity bit;
If 5 want analog telemetering in passage, remote signalling, must, in the configuration of configuration/plant stand channel parameters, allow passage belong to some factories;
6, select user/log in menu, could revise configuration;
7, menu/configuration modification channel parameters, the plant stand parameter, notice that the number of passage remote measure and communication is revised in affiliated plant stand.The stipulations parameter can be checked the parameter of stipulations, also can revise the remote measurement of transmission, remote signalling, soe type;
8, menu/pressure test is controlled, and for snowslide, tests;
9, menu/inquiry, can query message and the record of displacement/saltus step/remote control/remote regulating operation;
10, menu/window/data window, left side is data window, by " sequence number ", selects plant stand or passage, " data " select remote measurement, remote signalling, event record, straighforward operation, remote regulating operation, and the state of passage, the page number can page turning;
11, menu/window/message window, check message;
12, menu/window/alarm window, check Real-time Alarm;
13, simulate single remote measurement, data/remote measurement, the remote measurement value of modification respective channel;
14, simulate single remote measurement random variation.Data/remote measurement, the random variation of the telemetry station of respective channel is set as T, revises period of change, and noticing that the remote regulating sequence number is greater than 0 telemetry station can not random variation;
15, simulate single remote measurement, data/remote signalling, the state of the remote signalling point of modification respective channel;
16, simulate single remote signalling random variation.Data/remote signalling, the random variation of revising the remote signalling point of respective channel is set as T, revises period of change, and attention remote control sequence number is greater than 0 remote signalling point can not random variation;
17, simulation soe, data/remote signalling, the generation logout of revising the remote signalling point of respective channel is set as T, produces the remote signalling displacement by the method for introducing previously and will generate soe;
18, remote control, by remote signalling period and the binding of remote control period, get final product, and after success, will send the remote signalling displacement.
As further prioritization scheme, on the basis of above-described embodiment, data-base recording in the OPEN3000 system is simplified, make the training special interface: transformer station's information in jurisdiction area, Dou Shimou city in former OPEN3000 system, by these plant stands, relevant information table, wiring diagram etc. are simplified (retaining indivedual plant stands, the most of deletion), revise system master interface, be formed for the pattern of training, test, troop training use, for combat training.
Obviously, above-described embodiment is only for the utility model example clearly is described, and is not the restriction to embodiment of the present utility model.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without also giving all embodiments.And these belong to apparent variation that spirit of the present utility model extended out or change still among protection domain of the present utility model.
Claims (1)
1. a power network schedule automation experience system, it is characterized in that comprising: OPEN3000 system simulator workstation, the OPEN3000 system front end processor be connected with the serial ports of OPEN3000 system simulator workstation, the data switching exchane be connected with OPEN3000 system front end processor, the data network equipment that one end is connected with data switching exchane and the other end is connected with OPEN3000 system simulator workstation, the backstage switch that signal input part is connected with OPEN3000 system front end processor, the OPEN3000 system SCADA server be connected with the signal input part of backstage switch, the OPEN3000 system history server be connected with the signal input part of backstage switch, the PAS server be connected with the signal input part of backstage switch, the automated maintenance workstation be connected with the signal input part of backstage switch, the form machine be connected with the signal input part of backstage switch, the edge switch be connected with the signal output part of backstage switch, the WEB server be connected with edge switch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220618641 CN202939884U (en) | 2012-11-20 | 2012-11-20 | Electric network management automated training system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220618641 CN202939884U (en) | 2012-11-20 | 2012-11-20 | Electric network management automated training system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202939884U true CN202939884U (en) | 2013-05-15 |
Family
ID=48324111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220618641 Expired - Fee Related CN202939884U (en) | 2012-11-20 | 2012-11-20 | Electric network management automated training system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202939884U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103400516A (en) * | 2013-08-23 | 2013-11-20 | 国家电网公司 | Dispatching automation simulating training system and method |
-
2012
- 2012-11-20 CN CN 201220618641 patent/CN202939884U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103400516A (en) * | 2013-08-23 | 2013-11-20 | 国家电网公司 | Dispatching automation simulating training system and method |
CN103400516B (en) * | 2013-08-23 | 2016-02-03 | 国家电网公司 | Dispatching automation simulation training system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103123758B (en) | A kind of dispatching automation numeral physical mixed simulation training system | |
CN103617760B (en) | A kind of power distribution network DTS analogue system and emulation mode thereof | |
CN103177642B (en) | A kind of method improving Dispatcher Training Simulator authenticity | |
CN209607185U (en) | A kind of electric power monitoring system network safety prevention experience system | |
CN103050048B (en) | Generation method and system of training lesson plan of dispatcher training simulation system | |
CN201490764U (en) | General simulation test system with integrated power grid dispatching and electric quantity acquisition | |
CN202522691U (en) | Simulation terminal test platform for power utilization information acquisition master station system | |
CN103412533A (en) | Automatic checking system of smart power grid dispatching monitoring information | |
CN107257304B (en) | Telecontrol point-aligning-free configuration test system | |
CN204720064U (en) | A kind of comprehensively monitoring robotization actual training device based on transformer station | |
CN104537908A (en) | Multi-stage scheduling integrated simulation system based on model sharing and method | |
CN103823952A (en) | Data flow design method for large grid control integrated full-process simulation training system | |
CN104091514A (en) | Power grid dispatching personnel training simulation system | |
CN202221628U (en) | Simulation system for power grid of hybrid transformer substation | |
CN105976682A (en) | Simulation platform used for power grid training | |
CN104113546A (en) | Transformer substation SCD file based intelligent transformer substation training simulation achieving method | |
CN104077934A (en) | Integrated training platform for intelligent substation secondary system | |
CN108648549B (en) | Object-oriented electricity consumption information acquisition closed-loop simulation system and control method | |
CN202939884U (en) | Electric network management automated training system | |
CN206558029U (en) | A kind of dispatcher training system system | |
CN104318833A (en) | Working method for of power grid dispatching automation training system | |
CN105634141A (en) | Power regulation and control information real-time monitoring and security early warning mobile transmission system and method | |
CN102508052B (en) | Test method for field band channel operation of automatic bus transfer system of area network | |
CN202650332U (en) | Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks | |
CN204440768U (en) | A kind of low-voltage platform area simulation and training system based on rural power grids intelligent type low-voltage panel box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130515 Termination date: 20171120 |
|
CF01 | Termination of patent right due to non-payment of annual fee |