CN202936771U - Strengthening net for active protection and control of debris flow - Google Patents

Strengthening net for active protection and control of debris flow Download PDF

Info

Publication number
CN202936771U
CN202936771U CN 201220532586 CN201220532586U CN202936771U CN 202936771 U CN202936771 U CN 202936771U CN 201220532586 CN201220532586 CN 201220532586 CN 201220532586 U CN201220532586 U CN 201220532586U CN 202936771 U CN202936771 U CN 202936771U
Authority
CN
China
Prior art keywords
net
layer
ecological
dictyosome
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220532586
Other languages
Chinese (zh)
Inventor
骆漫利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220532586 priority Critical patent/CN202936771U/en
Application granted granted Critical
Publication of CN202936771U publication Critical patent/CN202936771U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a strengthening net for active protection and control of debris flow. The strengthening net comprises a loose solid stacking layer penetrating the earth surface, anchor cables deeply fixed in a stiff ground layer, a net body covered on the anchor cables and anchor cable piers positioned on the net body and fixing the net body and the anchor cables together, wherein the net body adopts an up-and-down double-layer structure, and comprises a cable net in the upper layer and an ecological layer in the lower layer; and the ecological net is made from a completely biodegradable material and grass seeds are mixed in the ecological net. According to the utility model, the anchor cables are deeply fixed in the stiff ground layer, can not move and are covered with the net body; the net body is fixed together with the anchor cables through the anchor cable piers to form a permanent coverage area; a certain pre-tightening pressure can be exerted on substances in the coverage area to fix the substances in the primary position; and the net body adopts the up-and-down double-layer structure, the cable net in the upper layer mainly plays roles of stopping and locking substances in a source area and the ecological net in the lower layer mainly improves the properties of the loose solid stacking layer.

Description

Mud-rock flow initiatively protects the improvement reinforcing network
Technical field
The utility model relates to the Geotechnical Engineering field, relates in particular to a kind of mud-rock flow and initiatively protects the improvement reinforcing network.
Background technology
Mud-rock flow is that mountain area cheuch or mountain region are domatic upper, is excited soil, water, the gas mixed flow between sediment laden flow and the landslide that contain a large amount of silt stones by water sources such as heavy rain, ice dissolutions.The formation of your strength must possess following three conditions simultaneously, and the suitable landform of the precipitous thing of being convenient to catchment is 1. arranged, and having to pile up on 2. has abundant bulk solids material, and sudden a large amount of flowing water source is 3. arranged in a short time.At present, mud-rock flow is a kind of global geological disaster, annual in frequently generation all over the world, and it is also very common in China, and in numerous geological disasters, mud-rock flow is considered to a kind of of lethality maximum, there is outburst suddenly, break with tremendous force, the characteristics such as rapidly, and have an avalanche, the double action that landslide and flood destroy, endanger larger, at present, the method of the source area of mud-rock flow being protected by protective screening is arranged, although this method can play certain Intercepting effects, and can eliminate an essential condition---the bulk solids material of debris flow formation, but eliminate not thorough, poor effect, can not improve the present situation of bulk solids material layer.
Summary of the invention
The purpose of this utility model just is that providing a kind of addresses the above problem, can be in the source area of mud-rock flow, and locking bulk solids material layer, and the mud-rock flow that improves the loose proterties of bulk solids material initiatively protects the improvement reinforcing network.
To achieve these goals, the technical solution adopted in the utility model is such: a kind of mud-rock flow initiatively protects the improvement reinforcing network, comprise through earth's surface bulk solids accumulation horizon, deeply be fixed on anchor cable in firm hard formation, cover the dictyosome on anchor cable, be positioned on dictyosome the anchor cable pier that dictyosome and anchor cable are fixed together, described dictyosome is the Dual-layer structure, be respectively the steel rope net on upper strata and the ecological net of lower floor, described ecological net adopts the material of complete biodegradable to make, and is mixed with grass-seed in ecological net.
As preferably: described steel rope net adopts anticorrosion wire rope to work out.
As preferably: the mesh of described ecological net is less than the mesh of steel rope net.
Compared with prior art, the utility model has the advantage of: anchor cable is through earth's surface bulk solids accumulation horizon, deeply be fixed in firm hard formation, can not move, and be coated with dictyosome on it, and dictyosome is fixed together by anchor cable pier and anchor cable, formed fixing overlay area, the source area that this zone is mud-rock flow, can form to the material in this overlay area certain preload pressure, material is fixed up in situ, prevent that it from moving, even under the condition suddenly increased at heavy rain or current, water can flow away by the mesh of dictyosome, but can not take away the material under the dictyosome covering, in addition, dictyosome is the Dual-layer structure, the steel rope net on upper strata mainly rises and stops, the effect of locking source area material, and the ecological net of lower floor mainly improves the proterties of bulk solids accumulation horizon, be mixed with grass-seed in ecological net, after a period of time, grass-seed roots on the bulk solids accumulation horizon, can effectively improve the proterties of bulk solids accumulation horizon, avoid soil erosion, better protecting effect.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
The structural representation that Fig. 2 is dictyosome in Fig. 1.
In figure: 1, source area; 2, bulk solids accumulation horizon; 3, firm hard formation; 4, anchor cable; 5, anchor cable pier; 6, dictyosome; 61, steel rope net; 62, ecological net.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Embodiment 1: referring to Fig. 1, Fig. 2, a kind of mud-rock flow initiatively protects the improvement reinforcing network, comprise through earth's surface bulk solids accumulation horizon 2, deeply be fixed on the anchor cable 4 in firm hard formation 3, cover the dictyosome 6 on anchor cable 4, be positioned on dictyosome 6 the anchor cable pier 5 that dictyosome 6 and anchor cable 4 are fixed together, described dictyosome 6 is the Dual-layer structure, be respectively the steel rope net 61 on upper strata and the ecological net 62 of lower floor, described ecological net 62 adopts the material of complete biodegradable to make, and be mixed with grass-seed in ecological net 62, described steel rope net 61 adopts anticorrosion wire rope to work out, the mesh of described ecological net 62 is less than the mesh of steel rope net 61.
Compared with prior art, the utility model has the advantage of: anchor cable 4 is through earth's surface bulk solids accumulation horizon 2, deeply be fixed in firm hard formation 3, can not move, and be coated with dictyosome 6 on it, and dictyosome 6 is fixed together by anchor cable pier 5 and anchor cable 4, formed fixing overlay area, the source area 1 that this zone is mud-rock flow, can form to the material in this overlay area certain preload pressure, material is fixed up in situ, prevent that it from moving, even under the condition suddenly increased at heavy rain or current, water can flow away by the mesh of dictyosome 6, but can not take away the material under dictyosome 6 coverings, in addition, dictyosome 6 is the Dual-layer structure, main the rising of steel rope net 61 on upper strata stops, the effect of locking source area 1 material, and the ecological net 62 of lower floor mainly improves the proterties of bulk solids accumulation horizon 2, be mixed with grass-seed in ecological net 62, after a period of time, grass-seed roots on bulk solids accumulation horizon 2, can effectively improve the proterties of bulk solids accumulation horizon 2, avoid soil erosion, better protecting effect.

Claims (3)

1. a mud-rock flow initiatively protects the improvement reinforcing network, comprise through earth's surface bulk solids accumulation horizon, deeply be fixed on anchor cable in firm hard formation, cover the dictyosome on anchor cable, be positioned on dictyosome the anchor cable pier that dictyosome and anchor cable are fixed together, it is characterized in that: described dictyosome is the Dual-layer structure, be respectively the steel rope net on upper strata and the ecological net of lower floor, described ecological net adopts the material of complete biodegradable to make, and is mixed with grass-seed in ecological net.
2. mud-rock flow according to claim 1 initiatively protects the improvement reinforcing network, it is characterized in that: described steel rope net adopts anticorrosion wire rope to work out.
3. mud-rock flow according to claim 1 initiatively protects the improvement reinforcing network, it is characterized in that: the mesh of described ecological net is less than the mesh of steel rope net.
CN 201220532586 2012-10-18 2012-10-18 Strengthening net for active protection and control of debris flow Expired - Fee Related CN202936771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220532586 CN202936771U (en) 2012-10-18 2012-10-18 Strengthening net for active protection and control of debris flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220532586 CN202936771U (en) 2012-10-18 2012-10-18 Strengthening net for active protection and control of debris flow

Publications (1)

Publication Number Publication Date
CN202936771U true CN202936771U (en) 2013-05-15

Family

ID=48321017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220532586 Expired - Fee Related CN202936771U (en) 2012-10-18 2012-10-18 Strengthening net for active protection and control of debris flow

Country Status (1)

Country Link
CN (1) CN202936771U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372800A (en) * 2014-10-24 2015-02-25 成都绿迪科技有限公司 Debris flow protective structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372800A (en) * 2014-10-24 2015-02-25 成都绿迪科技有限公司 Debris flow protective structure

Similar Documents

Publication Publication Date Title
CN101580305A (en) Wetland governance method for improving ecological environmental in reservoir falling zone
CN103397614A (en) Stone cage check dam used for mountainous area erosion gully control
CN201962615U (en) Reinforcing net capable of actively preventing debris flow
CN107059891B (en) Plant pile group type mud-rock flow is blocked structure
KR101262240B1 (en) Structure for preventing debris flow
CN204825783U (en) Ecological slope protection structure of dykes and dams upstream face
Qu et al. A study of the characteristics of aeolian sand activity and the effects of a comprehensive protective system in a coastal dune area in southern China
CN202936771U (en) Strengthening net for active protection and control of debris flow
US20160312427A1 (en) Embankment Support
CN201165666Y (en) Flexible netted check dam
Huat et al. Study of root theories in green tropical slope stability
JP5322068B1 (en) Construction method of submarine
Mishra et al. Liquefaction at mouth of the River Devi: An amphidromic point in the Mahanadi delta, India
CN202730779U (en) Active debris flow prevention/treatment monitoring system
CN102995646A (en) Net cage protection pad type revetment structure and construction method thereof
CN208604478U (en) A kind of talus slide area Bridge Pier ruggedized construction
CN203007959U (en) Net cage pad type revetment structure
CN111926766A (en) Soil erosion and water loss prevention type revetment structure
CN207405572U (en) A kind of new water-fast timber revetment structure
RU2648121C1 (en) Device for pitching earth berms
KR20110028801A (en) Planting consturuction using the straight bamboo
CN204356789U (en) A kind of embankment slope safeguard structure
Garanaik et al. River Bank Protection
CN203977435U (en) Sash beam ecological slope protection structure
CN202610810U (en) Ecological slope protection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130515

Termination date: 20131018