CN202928717U - Fault early warning system for switch cabinet - Google Patents
Fault early warning system for switch cabinet Download PDFInfo
- Publication number
- CN202928717U CN202928717U CN 201220496017 CN201220496017U CN202928717U CN 202928717 U CN202928717 U CN 202928717U CN 201220496017 CN201220496017 CN 201220496017 CN 201220496017 U CN201220496017 U CN 201220496017U CN 202928717 U CN202928717 U CN 202928717U
- Authority
- CN
- China
- Prior art keywords
- early warning
- switch cubicle
- warning system
- switch cabinet
- bleeding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a fault early warning system for a switch cabinet. The early warning system comprises an air exhaust unit (102) for drawing off air in the switch cabinet (101), a laser monitor (103) connected with the air exhaust unit (102) and a background host (104) for obtaining monitoring data of the laser monitor (103). The fault early warning system for the switch cabinet has the advantages that early-stage monitoring and early warning on overheating faults of equipment in the switch cabinet can be realized, overheating detection can be carried out on all equipment in the switch cabinet by drawing off air, installation of a temperature detector in the switch cabinet is avoided, and the fault early warning system can be applied to switch cabinets in any type and has great application values in power production.
Description
Technical field
The utility model relates to system for distribution network of power switch cubicle field, more particularly, relates to the monitor and early warning system of equipment heating in a kind of switch cubicle.
Background technology
Switch cubicle is the important distribution facility of electric system, and enclosed switchgear is widely used in power industry.Heating is the common fault of switch cubicle, for the detection of switch cubicle inner cable, cable end and other first and second equipment heating, never have at present good technological means and realize, cause the switch cubicle Frequent Troubles, cause damage of equipment and short circuit accident, potential safety hazard is buried in operation to electric power.
Switch cubicle heating detection means commonly used is directly to carry out temperature detection at present, comprises contact temperature-measuring and contactless temperature-measuring.If the employing Non-contact Infrared Temperature Measurement, too many, the installation inconvenience of layouting.If the use contact type measurement need to be isolated transmission with optical cable, owing to contacting with high-tension apparatus, there is accident potential in temperature measuring equipment itself and can not covers the interior all devices of cabinet.How detector switch cabinet inner cable, cable end and other first and second apparatus overheat, and send in advance early warning signal, prevent because equipment heating causes security incident, be the electrical production problem that current urgent need solves.
The utility model content
The technical problems to be solved in the utility model is to provide a kind of switch cubicle fault early warning system, layout in above-mentioned direct temperature measurement method for prior art many, install inconvenience, overlay device comprehensively and temperature measuring equipment itself have the defective of accident potential, a kind of not direct temperature measurement is provided, and realizes monitoring and the early warning of apparatus overheat fault by the particle concentration that equipment heating in the detector switch cabinet volatilizees.
The technical scheme that its technical matters that solves the utility model adopts is:
A kind of switch cubicle fault early warning system comprises for the unit 102 of bleeding that extracts switch cubicle 101 interior gases, the laser monitoring device 103 that is connected with the unit 102 of bleeding, for the background host computer 104 of obtaining laser monitoring device 103 Monitoring Data;
Offer the aperture of bleeding on described switch cubicle 101, the unit 102 of bleeding is connected with the aperture of bleeding on switch cubicle 101 by connecting tube 105;
One end of described laser monitoring device 103 is connected with the unit 102 of bleeding by connecting tube 105, and the other end is exported gas 106 by connecting tube 105.
Can volatilize particulate after equipment heating in switch cubicle 101, comprise the gas 106 of particulate by unit 102 extractions of bleeding, and be input in laser monitoring device 103.Due to an end of the laser monitoring device 103 input gas 106 that is connected with the unit 102 of bleeding, the other end is by connecting tube 105 output gases 106, just can monitor density of particle in the gas of interior process of unit interval.The data that laser monitoring device 103 will monitor density of particle again are sent to background host computer 104.Background host computer 104 draws according to the size of density of particle and whether has apparatus overheat in switch cubicle 101 and carry out fault pre-alarming.
Implement switch cubicle fault early warning system of the present utility model, has following beneficial effect: can realize the early monitoring early warning to apparatus overheat fault in switch cubicle, realize the covering of the overheated detection of all devices in switch cubicle by extracting gases, avoid installing temperature-detecting device in switch cubicle, be applicable to the switch cubicle of any type, larger using value is arranged in electrical production.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples, in accompanying drawing:
Fig. 1 is switch cubicle fault early warning system schematic diagram.
Embodiment
Understand for technical characterictic of the present utility model, purpose and effect being had more clearly, now contrast accompanying drawing and describe embodiment of the present utility model in detail.
As shown in Figure 1, a kind of switch cubicle fault early warning system comprises for the unit 102 of bleeding that extracts switch cubicle 101 interior gases, the laser monitoring device 103 that is connected with the unit 102 of bleeding, for the background host computer 104 of obtaining laser monitoring device 103 Monitoring Data;
Correct position on switch cubicle 101 offers the aperture of bleeding, and the unit 102 of bleeding is connected with the aperture of bleeding on switch cubicle 101 by connecting tube 105, extracts the interior gas 106 of switch cubicle 101, and by connecting tube 105 with gas 106 input laser monitoring devices 103.Laser monitoring device 103 sends the data that monitor to background host computer 104, by the also early warning of realization to the switch cubicle fault of 104 pairs of described data analysis of background host computer.
One end of described laser monitoring device 103 is connected with the unit 102 of bleeding by connecting tube 105, and the other end is exported gas 106 by connecting tube 105.
In Fig. 1, the unit 102 of bleeding is an aspiration pump, and aspiration pump twenty four hours continuous operation ceaselessly will be input to from the gas 106 of switch cubicle 101 interior extractions laser monitoring device 103, and the other end of laser monitoring device 103 is with gas 106 outputs.Can guarantee that like this density of particle that monitors is the density of particle in the flowing gas of process in the unit interval and is real-time density of particle.
There are a light-emitting tube and a light receiving tube in laser monitoring device 103 inside, when gas process light-path, and the particulate that volatilizees if there is equipment heating in switch cubicle in gas, thus will have influence on the illumination realization of light receiving tube to the monitoring of density of particle.
The utility model adopts the laser monitoring technology, and the density of particle in the gas of switch cubicle extraction is monitored, and background host computer draws whether there is the equipment heating fault in switch cubicle to the density analysis of particulate in gas.Background host computer is sent fault pre-alarming according to density of particle can comprise following two schemes:
Scheme one:
Step 1: the data of collecting a large amount of density of particle and corresponding switch in-cabinet temperature;
Step 2: adopt intelligent algorithm that the data of collecting are learnt, extract the rule between density of particle and vs. temperature;
Step 3: background host computer arranges an early warning temperature value;
Step 4: when background host computer is received the density of particle data of laser monitoring device transmission, utilize the learning rules that obtain to learn to obtain the interior temperature value of switch cubicle; During more than or equal to the early warning temperature value, namely send early warning when the temperature value that obtains.
Preferably, described intelligent algorithm comprises: neural network, support vector machine.
Scheme two:
Step 1: the data of collecting a large amount of density of particle and corresponding switch in-cabinet temperature;
Step 2: background host computer arranges an early warning temperature value;
Step 3: find the density of particle corresponding with the early warning temperature value;
Step 4: background host computer density of particle value that the early warning temperature value is corresponding is as the early warning density value, when receiving the density of particle data that the laser monitoring device sends, judges that its value whether greater than the early warning density value, if more than or equal to the early warning density value, sends early warning.
The above is described embodiment of the present utility model by reference to the accompanying drawings; but the utility model is not limited to above-mentioned embodiment; above-mentioned embodiment is only schematic; rather than restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not breaking away from the scope situation that the utility model aim and claim protect, also can make a lot of forms, within these all belong to protection of the present utility model.
Claims (3)
1. switch cubicle fault early warning system is characterized in that: comprise for the unit of bleeding (102) that extracts interior the gas of switch cubicle (101), the laser monitoring device (103) that is connected with the unit of bleeding (102), for the background host computer (104) of obtaining laser monitoring device (103) Monitoring Data.
2. switch cubicle fault early warning system according to claim 1, it is characterized in that: described switch cubicle offers the aperture of bleeding on (101), and the unit of bleeding (102) are connected with the aperture of bleeding on switch cubicle (101) by connecting tube (105).
3. switch cubicle fault early warning system according to claim 1, it is characterized in that: an end of described laser monitoring device (103) is connected with the unit of bleeding (102) by connecting tube (105), and the other end is exported gas (106) by connecting tube (105).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220496017 CN202928717U (en) | 2012-09-26 | 2012-09-26 | Fault early warning system for switch cabinet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220496017 CN202928717U (en) | 2012-09-26 | 2012-09-26 | Fault early warning system for switch cabinet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202928717U true CN202928717U (en) | 2013-05-08 |
Family
ID=48218670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220496017 Expired - Lifetime CN202928717U (en) | 2012-09-26 | 2012-09-26 | Fault early warning system for switch cabinet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202928717U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113759219A (en) * | 2021-08-09 | 2021-12-07 | 浙江上青元电力科技有限公司 | Active environmental safety monitoring and early warning device, method and installation scheme |
-
2012
- 2012-09-26 CN CN 201220496017 patent/CN202928717U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113759219A (en) * | 2021-08-09 | 2021-12-07 | 浙江上青元电力科技有限公司 | Active environmental safety monitoring and early warning device, method and installation scheme |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208477061U (en) | High-tension switch cabinet partial discharge monitoring system | |
CN204347118U (en) | Electrification in high voltage numerical monitor and blocking device | |
CN103779842B (en) | low-voltage switch equipment drawer unit contact temperature monitoring device | |
CN103884961A (en) | Cable fault on-line monitoring system | |
CN103398740A (en) | Real-time on-line monitoring device for monitoring abnormal operation of switch cabinet | |
US20180287556A1 (en) | Wire connection terminal for photovoltaic string | |
CN105633910A (en) | Intelligent non-electricity protection device for power high-voltage switch cabinet and control method | |
CN101672885A (en) | Method for on-line detecting external insulation state of electric transmission and transformation equipment | |
CN105445594B (en) | Power grid fault detection system | |
CN204992550U (en) | Electrical safety detects protection circuit, switchgear and socket | |
CN202928717U (en) | Fault early warning system for switch cabinet | |
CN201569508U (en) | Temperature rise monitoring and analyzing device of high-pressure equipment | |
CN104678756A (en) | Novel intelligent comprehensive power transformation and distribution monitoring system | |
CN203191113U (en) | Temperature monitoring device used for electrical equipment | |
CN203630257U (en) | A transformer substation electrical network accident simulation circuit | |
CN202522638U (en) | Grid failure intelligent identification device | |
CN104571031A (en) | Intelligent auxiliary monitoring system for transformer substation and monitoring method for transformer substation | |
CN205120899U (en) | Locomotive high voltage insulation detecting system | |
CN203595553U (en) | Switch cabinet overheating remote early warning system | |
CN100540750C (en) | AC power supply device in aluminum electrolysis shop computer on-line insulating monitoring and warning | |
CN204461609U (en) | The infrared remote wired alarming device of high voltage isolator hot stall | |
CN203287107U (en) | Distributed infrared temperature measurement monitoring system for electrified railway section posts and transformer stations | |
CN202793594U (en) | Temperature measuring equipment of cable joint of switch cabinet | |
CN206541165U (en) | A kind of vehicle high-voltage cabinet control system based on CAN | |
CN204903023U (en) | Cubical switchboard wireless temperature measuring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130508 |
|
CX01 | Expiry of patent term |