CN202926572U - Power station air compressor control system - Google Patents

Power station air compressor control system Download PDF

Info

Publication number
CN202926572U
CN202926572U CN 201220637986 CN201220637986U CN202926572U CN 202926572 U CN202926572 U CN 202926572U CN 201220637986 CN201220637986 CN 201220637986 CN 201220637986 U CN201220637986 U CN 201220637986U CN 202926572 U CN202926572 U CN 202926572U
Authority
CN
China
Prior art keywords
air compressor
air
power station
pressure
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220637986
Other languages
Chinese (zh)
Inventor
侯鹏
冯健
彭俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN YUNHUI TECHNOLOGY SHARE Co Ltd
Original Assignee
HUNAN YUNHUI TECHNOLOGY SHARE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN YUNHUI TECHNOLOGY SHARE Co Ltd filed Critical HUNAN YUNHUI TECHNOLOGY SHARE Co Ltd
Priority to CN 201220637986 priority Critical patent/CN202926572U/en
Application granted granted Critical
Publication of CN202926572U publication Critical patent/CN202926572U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Of Positive-Displacement Air Blowers (AREA)

Abstract

The utility model relates to a power station air compressor control system, which comprises an air storage tank for providing an air source, wherein the air storage tank supplies air to a plurality of air compressors for braking a power station water turbine, each air compressor is connected with a PLC (programmable logic controller) through a soft starter, and a pressure transmitter is arranged on the air storage tank and is connected with the PLC. The starting and the stopping of a plurality of air compressors are automatically controlled through the PLC, when the pressure of the air storage tank is reduced to a certain value, one air compressor is automatically started, when the pressure is continuously reduced to a certain value, another air compressor is automatically started, when the pressure is raised to a certain value, the air compressor is automatically stopped, and when the air compressor has fault, the fault air compressor can be automatically switched to another air compressor for operation. In addition, the operation of the air compressor can take turns according to the time and the number of times, the unattended operation is realized, the automatic control is realized, the work load of personnel is reduced, the work efficiency is improved, the abrasion of equipment is reduced, and the service life of the equipment is prolonged.

Description

The power station control system of air compressor
Technical field
The utility model relates to Hydropower Plant, and the braking of water power plant water turbine is specifically controlled.
Background technique
At present, the braking of the water turbine of Hydropower Plant is general brings running resistance by the air compressor pressurized gas to compressor emergency shutdown, to reduce the compressor emergency shutdown time used.Existing braking control system mostly adopts manual Starting mode, when compressor emergency shutdown, needs gas in the braking gas holder to hinder the running of water turbine, during to certain pressure, needs operator manually boot brake air compressor when the gas holder pressure decreased.After pressure raises, manually stop air compressor.This mode not only automaticity is low, and working time that can not many air compressors of reasonable distribution.
The model utility content
For above-mentioned technical problem, the utility model provides a kind of automatic start-stop of air compressor and control system of rotation of realizing.
The technical scheme in the invention for solving the above technical problem is: the power station control system of air compressor, comprise the gas holder that source of the gas is provided, this gas holder is to several air compressor air feed of braking Power Station Turbine, and each described air compressor is connected with the PLC controller by a soft initiator; On described gas holder, pressure transmitter is installed, this pressure transmitter is connected with described PLC controller.
Further, on each described air compressor, a temperature transducer is installed, each temperature transducer is passed to described PLC controller with signal.
Further, described PLC controller is connected with a liquid crystal touch operation screen.
As can be known from the above technical solutions, the utility model is controlled the start and stop of multiple air compressors automatically by the PLC controller, during to certain value, automatically starts an air compressor when the gas holder pressure drop; When pressure continues to drop to certain value, automatically start another air compressor; When being elevated to certain value to pressure, automatically stop air compressor; Can automatically switch to another compressor operation after the mechanism of qi fault.And the operation of air compressor can be carried out rotation by time or number of times, realizes unmanned, automatically controls, and reduces personnel's workload, increases work efficiency, and reduces the wearing and tearing of equipment, the working life of extension device.
Description of drawings
Fig. 1 is system block diagram of the present utility model.
Embodiment
Below in conjunction with Fig. 1, the utility model is described in further detail:
This control system comprises the gas holder 1 that source of the gas is provided, this gas holder is to several air compressor 2 air feed of braking Power Station Turbine, each described air compressor is connected with PLC controller 3 by a soft initiator 7, pressure transmitter 4 is installed on described gas holder, and this pressure transmitter is connected with described PLC controller.Described PLC controller is completed automatic measurement and control to pressure according to initialize program by pressure transmitter, realize the automatic start-stop of air compressor and the switching of blowdown valve and the work of several air compressors, the automatic switchover of standby operation state etc., to guarantee the normal operating pressure of gas holder.
As further improvement of the utility model, on each described air compressor 2, a temperature transducer 5 is installed, each temperature transducer is passed to described PLC controller with signal, this can judge according to temperature the runnability of air compressor, break down as air compressor, automatically switch to another air compressor.PLC controller 3 of the present utility model is connected with a liquid crystal touch operation screen 6, and the gas holder force value of native system and various running state can show on liquid crystal touch operation screen.
The utility model has been realized the switching of automatic start-stop and the blowdown valve of air compressor, and the automatic switchover of the work of two air compressors, standby operation state, guarantees the normal operating pressure of gas holder; Reduced the compressor emergency shutdown time used; make the equipment operation more economical; more reasonable; and communication of the present utility model adopts ripe communication modes and the upper-position unit in a distant place to carry out communication; central control chamber will be given on important information; make the operations staff constantly know field condition, automaticity is high, few man on duty.
Above-mentioned mode of execution is only for illustration of the utility model, and be not to be to restriction of the present utility model, the those of ordinary skill in relevant technologies field, in the situation that do not break away from the utility model spirit and scope, can also make various variations and modification, so all technological schemes that are equal to also should belong to category of the present utility model.

Claims (3)

1. the power station control system of air compressor, comprise the gas holder that source of the gas is provided, and it is characterized in that: this gas holder is to several air compressor air feed of braking Power Station Turbine, and each described air compressor is connected with the PLC controller by a soft initiator; On described gas holder, pressure transmitter is installed, this pressure transmitter is connected with described PLC controller.
2. power station according to claim 1 control system of air compressor, it is characterized in that: on each described air compressor, a temperature transducer is installed, each temperature transducer is passed to described PLC controller with signal.
3. power station according to claim 1 and 2 control system of air compressor, it is characterized in that: described PLC controller is connected with a liquid crystal touch operation screen.
CN 201220637986 2012-11-28 2012-11-28 Power station air compressor control system Expired - Fee Related CN202926572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220637986 CN202926572U (en) 2012-11-28 2012-11-28 Power station air compressor control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220637986 CN202926572U (en) 2012-11-28 2012-11-28 Power station air compressor control system

Publications (1)

Publication Number Publication Date
CN202926572U true CN202926572U (en) 2013-05-08

Family

ID=48216541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220637986 Expired - Fee Related CN202926572U (en) 2012-11-28 2012-11-28 Power station air compressor control system

Country Status (1)

Country Link
CN (1) CN202926572U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153979A (en) * 2014-05-16 2014-11-19 沈阳天朗艾尔压缩机有限公司 Operation control method of power air compressor and compressor thereof
CN109268243A (en) * 2018-12-06 2019-01-25 赤峰山金红岭有色矿业有限责任公司 A kind of mine optional equipment air feed system and its control method
CN112211813A (en) * 2020-10-14 2021-01-12 苏州合卓智能科技有限公司 Air compressor unit cooperative control system
CN112459998A (en) * 2020-11-24 2021-03-09 爱景智能装备(无锡)有限公司 Method for rapidly judging starting and stopping priority in multiple air compressors
CN113883043A (en) * 2021-09-08 2022-01-04 西安热工研究院有限公司 Automatic starting and stopping method of air compressor unit by adopting priority control
CN114177954A (en) * 2021-11-10 2022-03-15 上海凌逐新能源科技有限公司 Following air inlet fresh air system of environmental test chamber of fuel cell system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153979A (en) * 2014-05-16 2014-11-19 沈阳天朗艾尔压缩机有限公司 Operation control method of power air compressor and compressor thereof
CN104153979B (en) * 2014-05-16 2016-08-24 沈阳天朗艾尔压缩机有限公司 The progress control method of a kind of power air compressor and compressor thereof
CN109268243A (en) * 2018-12-06 2019-01-25 赤峰山金红岭有色矿业有限责任公司 A kind of mine optional equipment air feed system and its control method
CN112211813A (en) * 2020-10-14 2021-01-12 苏州合卓智能科技有限公司 Air compressor unit cooperative control system
CN112459998A (en) * 2020-11-24 2021-03-09 爱景智能装备(无锡)有限公司 Method for rapidly judging starting and stopping priority in multiple air compressors
CN113883043A (en) * 2021-09-08 2022-01-04 西安热工研究院有限公司 Automatic starting and stopping method of air compressor unit by adopting priority control
CN114177954A (en) * 2021-11-10 2022-03-15 上海凌逐新能源科技有限公司 Following air inlet fresh air system of environmental test chamber of fuel cell system
CN114177954B (en) * 2021-11-10 2024-05-03 上海凌逐新能源科技有限公司 Fuel cell system environment test cabin following air inlet fresh air system

Similar Documents

Publication Publication Date Title
CN202926572U (en) Power station air compressor control system
CN204570911U (en) Power station maintenance collecting well drainage control system
CN110086404A (en) Power consumption control system and method
CN104373330A (en) Air compressor control device and method
CN203220963U (en) Safety protection system of pneumatic clutch
CN203160317U (en) Double-closed-loop automatic constant-pressure water supply control device of parallelly-connected pipe network
CN103016323A (en) Redundant start control switching system of water pump
CN203257641U (en) Air compressor parallel system
CN103758350A (en) Air and electricity linkage device of full-automatic high-speed concrete spraying machine
CN101839396B (en) Double-air-source air path automatic switching pressurizer
CN202056040U (en) Control system for multiple air compressors
CN205278735U (en) Bearing fatten device
CN207568820U (en) A kind of air compressor machine of tape timer
CN202926573U (en) Cooling water control system for power station machine unit
CN105201805A (en) Air compressor set intelligent control system and method based on user informatization allocation
CN205154588U (en) Two frequency constant -voltage water supply control system
CN202493409U (en) Air compressor cluster monitoring system
CN205530482U (en) Variable frequency speed governing(VFSG) constant voltage water supply system
CN203878660U (en) Novel redundancy control system in secondary water supply system
CN201925139U (en) Automatic control device of air compressor for mines
CN203640975U (en) Air pressure control system of drilling machine air compressor
CN205897664U (en) Water cooling system
CN204849918U (en) Frequency constant -voltage water supply system
CN202990023U (en) Water supply system performing safe and stable water supply through water pump start-control device
CN203670127U (en) Mechanical mortar pump

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20181128