CN202921145U - Double-tower two-stage CO2 adsorption and capture system with heat recovery device - Google Patents

Double-tower two-stage CO2 adsorption and capture system with heat recovery device Download PDF

Info

Publication number
CN202921145U
CN202921145U CN2012206681582U CN201220668158U CN202921145U CN 202921145 U CN202921145 U CN 202921145U CN 2012206681582 U CN2012206681582 U CN 2012206681582U CN 201220668158 U CN201220668158 U CN 201220668158U CN 202921145 U CN202921145 U CN 202921145U
Authority
CN
China
Prior art keywords
valve
communicated
tower
pipe
port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012206681582U
Other languages
Chinese (zh)
Inventor
国丽荣
谭羽非
李宝昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Forestry University
Original Assignee
Northeast Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Forestry University filed Critical Northeast Forestry University
Priority to CN2012206681582U priority Critical patent/CN202921145U/en
Application granted granted Critical
Publication of CN202921145U publication Critical patent/CN202921145U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02CCAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
    • Y02C20/00Capture or disposal of greenhouse gases
    • Y02C20/40Capture or disposal of greenhouse gases of CO2

Landscapes

  • Treating Waste Gases (AREA)
  • Separation Of Gases By Adsorption (AREA)

Abstract

The utility model discloses a double-tower two-stage CO2 adsorption and capture system with a heat recovery device and relates to a CO2 adsorption and capture system. The system can solve the problems of high temperature and low-concentration CO2 of existing flue gas. A high-temperature flue gas pipe is communicated with one end of a normal-temperature flue gas pipe through a heat exchanger, the normal-temperature flue gas pipe is respectively communicated with a third valve and a valve III, the third valve is communicated with a flue gas inlet of a first tower, and the valve III is communicated with the flue gas inlet of a second tower; the inlet end of a seventh valve at a buffering gas outlet is communicated, the outlet end of the seventh valve is respectively communicated with a second valve through a valve II, the valve II is communicated with the flue gas inlet of the second tower, and the second valve is communicated with the flue gas inlet of the first tower; a second gas outlet of a buffer tank is communicated with a gas inlet of a ninth valve, a gas outlet of the ninth valve is respectively communicated with the ninth valve and a valve IX, the ninth valve is communicated with the gas inlet of a third tower, and the valve IX is communicated with the gas inlet of a fourth tower. The double-tower two-stage CO2 adsorption and capture system disclosed by the utility model is used for adsorption and capture of CO2.

Description

Double tower two-stage CO with heat reclamation device 2the absorption capture systems
Technical field
The utility model relates to a kind of CO 2the absorption capture systems.
Background technology
Along with the consumption sharp increase of oil, coal and natural gas, air pollution is day by day serious.The greenhouse effects that the excess carbon dioxide gas discharging causes have become serious world's problem.Thermal power plant is CO 2concentrated emission source, its CO 2discharge capacity accounts for mankind's activity CO 230% of total release, therefore, in order to realize CO 2reduction of discharging, developed the multinomial CO that existing power plant is taked 2separation, recovery measure, our purpose is that CO is reclaimed in the separation strong, that be easy to large-scale industrial application of research economy 2technology, wherein carbon dioxide capture and memory technology are a kind of new methods of very promising minimizing CO2 emissions.The obstacle of carbon dioxide capture technology maximum is exactly somewhat expensive, accounts for 75% of carbon dioxide capture and memory technology total cost.Therefore, research and develop the CO2 capture technique with low-cost low energy consumption and there is realistic meaning.
Pressure-variable adsorption (pressure swing adsorption, PSA) technology is the characteristic of utilizing the difference of gas component characterization of adsorption on solid material and adsorbance to change with the variation of pressure, realizes separation or the purification of gas by periodic pressure conversion process.
CO in flue gas is caught in absorption at present 2achievement in research, the ubiquity energy consumption is high, organic efficiency is low, at home and abroad still in the experimental exploring stage.Under the overall situation of current control Global climate change, improve adsorbent to CO in flue gas under low pressure 2selective adsorption capacity, accelerate the adsorption system processing speed, change separating process, reduce energy consumption, improve CO 2the rate of recovery, and extend to engineering application is problem at present in the urgent need to address.
The utility model content
The purpose of this utility model is to provide a kind of two-stage of the double tower with heat reclamation device CO 2the absorption capture systems, to solve high temperature and the CO of existing flue gas 2the problem of low concentration problem.
The utility model is to solve the problems of the technologies described above the technical scheme of taking to be: described system comprises the high-temperature flue gas pipe, heat exchanger, the normal temperature fume pipe, the first tower, the second tower, the first outlet pipe, surge tank, cold water pipe, the 3rd tower, the 4th tower, the normal temperature water pipe, high-temperature conduit, the first vavuum pump, the second outlet pipe, the second vavuum pump, air collector, the first valve, second valve, the 3rd valve, the 4th valve, the 5th valve, the 6th valve, the 7th valve, the 8th valve, the 9th valve, the tenth valve, the 11 valve, the 12 valve, the 13 valve, the 14 valve, valve one, valve two, valve three, valve four, valve five, valve six, valve seven, valve eight, valve nine, valve ten, valve 11, valve 12, valve 13, valve 14, the first valve, the second valve, the 3rd valve, the 4th valve, the 5th valve, the 6th valve, the 7th valve, the 8th valve, the 9th valve, the tenth valve, the 11 valve, the 12 valve and the 14 valve, compose in parallel the valve group with the 4th valve after the 3rd valve and the series connection of the first vavuum pump,
The high-temperature flue gas pipe is communicated with an end of normal temperature fume pipe by heat exchanger, the normal temperature fume pipe respectively with the 3rd valve and valve tee joint, the 3rd valve is communicated with the smoke inlet of the first tower, valve three is communicated with the smoke inlet of the second tower;
The top of the first tower is respectively equipped with downtake pipe and first row CO 2pipe, downtake pipe is provided with the 5th valve, and the delivery port of the first tower is communicated with an end of the first outlet pipe by the first valve, and the first outlet pipe is provided with the second valve, first row CO 2pipe is provided with the 4th valve, and the port of export of the 4th valve is communicated with the entrance point of valve group;
The top of the second tower is respectively equipped with second exhaust pipe and second row CO 2pipe, the delivery port that second exhaust pipe is provided with valve five, the second towers is communicated with an end of the first outlet pipe by valve one, second row CO 2pipe is provided with valve four, and the port of export of valve four is communicated with the entrance point of valve group, and the port of export of valve group is communicated with the first air inlet of surge tank by the tenth valve;
The entrance point of the 7th valve of the gas outlet of surge tank is communicated with, and the port of export of the 7th valve is communicated with by valve two and second valve respectively, and valve two is communicated with the smoke inlet of the second tower, and second valve is communicated with the smoke inlet of the first tower;
Cold water pipe is communicated with the 7th valve, valve seven, the 14 valve and valve 14 respectively, and the 7th valve is communicated with the water inlet of the first tower, and valve seven is communicated with the water inlet of the second tower, and the 14 valve is communicated with the water inlet of the 3rd tower, and valve 14 is communicated with the water inlet of the 4th tower;
The normal temperature water pipe is communicated with an end of high-temperature conduit by heat exchanger, high-temperature conduit is provided with the first valve, the port of export of the first valve respectively with the 6th valve, valve six, the 13 valve and valve ten tee joints, the 6th valve is communicated with the water inlet with the first tower, valve six is communicated with the water inlet of the second tower, the 13 valve is communicated with the water inlet of the 3rd tower, and valve 13 is communicated with the water inlet with the 4th tower;
The first gas outlet of surge tank is communicated with the air inlet of the 8th valve, and the gas outlet of the 8th valve is communicated with the tenth valve and valve ten respectively, and the tenth valve is communicated with the air inlet of the 3rd tower, and valve ten is communicated with the air inlet of the 4th tower;
The second gas outlet of surge tank is communicated with the air inlet of the 9th valve, and the gas outlet of the 9th valve is communicated with the 9th valve and valve nine respectively, and the 9th valve is communicated with the air inlet of the 3rd tower, and valve nine is communicated with the air inlet of the 4th tower;
The top of the 3rd tower is respectively equipped with the 3rd blast pipe and the 3rd row CO 2pipe, the 3rd blast pipe is provided with the 12 valve, and the delivery port of the 3rd tower is communicated with an end of the second outlet pipe by the 8th valve, and the second outlet pipe is provided with the 12 valve, the 3rd row CO 2pipe is provided with the 11 valve, and the port of export of the 11 valve is communicated with the entrance point of the 6th valve or the 11 valve, and the port of export of the 11 valve is communicated with air collector by the 5th valve;
The top of the 4th tower is respectively equipped with the 4th blast pipe and the 4th row CO 2pipe, the 4th blast pipe is provided with valve 12, and the delivery port of the 4th tower is communicated with an end of the second outlet pipe by valve eight, the 4th row CO 2pipe is provided with valve 11, the port of export of valve 11 is communicated with the entrance point of the 6th valve or the 11 valve, the port of export of the 6th valve is communicated with the entrance point of the 14 valve by the second vavuum pump, and the port of export of the 14 valve is communicated with the second air inlet of surge tank.
The utlity model has following beneficial effect: the flue gas of power plant emission is removed H through pretreatment stage 2o, SO x, and NO xafter impurity, now, the pressure of flue gas is that nearly normal pressure, temperature are about 403K, CO 2concentration be 15% left and right, first, by after heat reclamation device and normal-temperature water heat exchange, temperature becomes 303K, enters the first adsorption tower and is separated with the second adsorption tower pressure-swing absorption process.Through after separating-purifying, CO in gas product 2concentration can reach 40%-60%; And then, gas product is compressed to (0.2-0.5) MPa enters the second adsorption tower again and the 3rd adsorption tower carries out further separating-purifying, by CO 2be concentrated into more than 95%.
The effect of adsorption tower is the CO adsorbed in the flue gas that flows through adsorption tower 2gas.The effect of heat exchanger is the heat of recovered flue gas, and by the heat heating normal-temperature water of flue gas, flue gas cool-down, to normal temperature, is beneficial to absorption simultaneously, and the hot water heated up is beneficial to desorption at desorption stepwise heating adsorption tower.Two adsorption towers are alternations, and when a tower is in adsorption process, another tower is in desorption process.In each tower, by pressurization absorption, started, independently process is pressurizeed several steps such as absorption, gas purging, desorption by heating, step-down gas storage, desorption column cooling by the CO in flue gas successively 2gas absorption desorption are separated.
The accompanying drawing explanation
Fig. 1 is the utility model overall structure schematic diagram.
The specific embodiment
The specific embodiment one: in conjunction with Fig. 1, present embodiment is described, the system of present embodiment comprises high-temperature flue gas pipe 1, heat exchanger 2, normal temperature fume pipe 3, the first tower 4, the second tower 5, the first outlet pipe 6, surge tank 7, cold water pipe 8, the 3rd tower 9, the 4th tower 10, normal temperature water pipe 11, high-temperature conduit 12, the first vavuum pump 13, the second outlet pipe 14, the second vavuum pump 15, air collector 16, the first valve A1, second valve A2, the 3rd valve A3, the 4th valve A4, the 5th valve A5, the 6th valve A6, the 7th valve A7, the 8th valve A8, the 9th valve A9, the tenth valve A10, the 11 valve A11, the 12 valve A12, the 13 valve A13, the 14 valve A14, valve one B1, valve two B2, valve three B3, valve four B4, valve five B5, valve six B6, valve seven B7, valve eight B8, valve nine B9, valve ten B10, valve 11 B11, valve 12 B12, valve 13 B13, valve 14 B14, the first valve V1, the second valve V2, the 3rd valve V3, the 4th valve V4, the 5th valve V5, the 6th valve V6, the 7th valve V7, the 8th valve V8, the 9th valve V9, the tenth valve V10, the 11 valve V11, the 12 valve V12 and the 14 valve V14, compose in parallel the valve group with the 4th valve V4 after the 3rd valve V3 and the first vavuum pump 13 series connection,
High-temperature flue gas pipe 1 is communicated with an end of normal temperature fume pipe 3 by heat exchanger 2, and normal temperature fume pipe 3 is communicated with the 3rd valve A3 and valve three B3 respectively, and the 3rd valve A3 is communicated with the smoke inlet of the first tower 4, and valve three B3 are communicated with the smoke inlet of the second tower 5;
The top of the first tower 4 is respectively equipped with downtake pipe 4-1 and first row CO 2pipe 4-2, downtake pipe 4-1 is provided with the 5th valve A5, and the delivery port of the first tower 4 is communicated with an end of the first outlet pipe 6 by the first valve A1, and the first outlet pipe 6 is provided with the second valve V2, first row CO2 pipe 4-2 is provided with the 4th valve A4, and the port of export of the 4th valve A4 is communicated with the entrance point of valve group;
The top of the second tower 5 is respectively equipped with second exhaust pipe 5-1 and second row CO 2pipe 5-2, second exhaust pipe 5-1 is provided with valve five B5, the delivery port of the second tower 5 is communicated with an end of the first outlet pipe 6 by valve one B1, second row CO2 pipe 5-2 is provided with valve four B4, the port of export of valve four B4 is communicated with the entrance point of valve group, and the port of export of valve group is communicated with the first air inlet of surge tank 7 by the tenth valve V10;
The entrance point of the 7th valve V7 of the gas outlet of surge tank 7 is communicated with, and the port of export of the 7th valve V7 is communicated with by valve two B2 and second valve A2 respectively, and valve two B2 are communicated with the smoke inlet of the second tower 5, and second valve A2 is communicated with the smoke inlet of the first tower 4;
Cold water pipe 8 is communicated with the 7th valve A7, valve seven B7, the 14 valve A14 and valve 14 B14 respectively, the 7th valve A7 is communicated with the water inlet of the first tower 4, valve seven B7 are communicated with the water inlet of the second tower 5, the 14 valve A14 is communicated with the water inlet of the 3rd tower 9, and valve 14 B14 are communicated with the water inlet of the 4th tower 10;
Normal temperature water pipe 11 is communicated with an end of high-temperature conduit 12 by heat exchanger 2, high-temperature conduit 12 is provided with the first valve V1, the port of export of the first valve V1 is communicated with the 6th valve A6, valve six B6, the 13 valve A13 and valve 13 B13 respectively, the 6th valve A6 is communicated with the water inlet with the first tower 4, valve six B6 are communicated with the water inlet of the second tower 4, the 13 valve A13 is communicated with the water inlet of the 3rd tower 9, and valve 13 B13 are communicated with the water inlet with the 4th tower 10;
The first gas outlet of surge tank 7 is communicated with the air inlet of the 8th valve V8, and the gas outlet of the 8th valve V8 is communicated with the tenth valve A10 and valve ten B10 respectively, and the tenth valve A10 is communicated with the air inlet of the 3rd tower 9, and valve ten B10 are communicated with the air inlet of the 4th tower 10;
The second gas outlet of surge tank 7 is communicated with the air inlet of the 9th valve V9, and the gas outlet of the 9th valve V9 is communicated with the 9th valve A9 valve nine B9 respectively, and the 9th valve A9 is communicated with the air inlet of the 3rd tower 9, and valve nine B9 are communicated with the air inlet of the 4th tower 10;
The top of the 3rd tower 9 is respectively equipped with the 3rd blast pipe 9-1 and the 3rd row CO 2pipe 9-2, the 3rd blast pipe 9-1 is provided with the 12 valve A12, the delivery port of the 3rd tower 9 is communicated with an end of the second outlet pipe 14 by the 8th valve A8, the second outlet pipe 14 is provided with the 12 valve V12, the 3rd row CO2 pipe 9-2 is provided with the 11 valve A11, the port of export of the 11 valve A11 is communicated with the entrance point of the 6th valve V6 or the 11 valve V11, and the port of export of the 11 valve V11 is communicated with air collector 16 by the 5th valve V5;
The top of the 4th tower 10 is respectively equipped with the 4th blast pipe 10-1 and the 4th row CO 2pipe 10-2, the 4th blast pipe 10-1 is provided with valve 12 B12, the delivery port of the 4th tower 10 is communicated with an end of the second outlet pipe 14 by valve eight B8, the 4th row CO2 pipe 10-2 is provided with valve 11 B11, the port of export of valve 11 B11 is communicated with the entrance point of the 6th valve V6 or the 11 valve V11, the port of export of the 6th valve V6 is communicated with the entrance point of the 14 valve V14 by the second vavuum pump 15, and the port of export of the 14 valve V14 is communicated with the second air inlet of surge tank 7.
The first tower 4, the second tower 5, the 3rd tower 9 and the interior activated carbon fiber of all filling of the 4th tower 10.
The specific embodiment two: present embodiment is described in conjunction with Fig. 1, the first valve A1 of present embodiment, second valve A2, the 3rd valve A3, the 4th valve A4, the 5th valve A5, the 6th valve A6, the 7th valve A7, the 8th valve A8, the 9th valve A9, the tenth valve A10, the 11 valve A11, the 12 valve A12, the 13 valve A13, the 14 valve A14, valve one B1, valve two B2, valve three B3, valve four B4, valve five B5, valve six B6, valve seven B7, valve eight B8, valve nine B9, valve ten B10, valve 11 B11, valve 12 B12, valve 13 B13, valve 14 B14, the first valve V1, the second valve V2, the 3rd valve V3, the 4th valve V4, the 5th valve V5, the 6th valve V6, the 7th valve V7, the 8th valve V8, the 9th valve V9, the tenth valve V10, the 11 valve V11, the 12 valve V12 and the 14 valve V14 are magnetic valve.Other embodiment is identical with the specific embodiment one.
Operation principle: first order absorption:
The absorption of boosting: open the 3rd valve A3 and the 5th valve A5, by chilled, through desulfurization with removed the flue gas of nitrogen oxide, according to the flow of appointment, pass into the first tower 4 (now, the second tower 5 is in starting state not), now, the first tower is adsorption tower.Due to the interior filling NACF of the first tower 4, therefore to the CO in flue gas 2adsorbed the N be not adsorbed 2with a small amount of CO 2after flowing through the first tower 4, through the 5th valve A5, enter atmosphere.CO in the outlet flue gas that records first row CO2 pipe 4-2 2for concentration in entrance 90% the time, think that adsorption process finishes.Now close the first valve A3 and the 5th valve A5, open valve three B3 and valve five B5, the second tower 5 becomes adsorption tower, and the first tower 4 enters desorption process, is desorption column.
Gas purging: open the 7th valve V7, second valve A2 and the 5th valve A5, by the higher CO of purity obtained previously 2pass into the first tower 4 from bottom to top.Because now absorption has reached balance, NACF is CO absorption no longer 2, and have the N be not adsorbed in a large number in the free space in tower 2therefore, the CO passed into 2can only promote the N in free space in tower 2by the 5th valve A5, get rid of.After purge finishes, close the 7th valve V7, second valve A2 and the 5th valve A5.The volume calculations of this process time used by purge gas flow and tower draws.
Here it should be noted that, this step is from circulation for the second time, because, in first circulation, also do not catch gas in surge tank 7, therefore not this step that circulates for the first time.
Desorption by heating: open the 4th valve A4, the 4th valve V4 and the tenth valve V10, open the first valve V1, the second valve V2, the first valve A1 and the 6th valve A6, utilize by the high-temperature water of flue gas, temperature on the first tower 4 is raise rapidly, make a large amount of Adsorption Phase CO that are adsorbed on NACF 2escape out from adsorbent surface, become gas phase CO 2, enter surge tank 7.
Step-down gas storage: when the second tower 5 internal pressures drop to when identical with environmental pressure, close the 4th valve V4, open the 3rd valve V3, utilize the first vavuum pump 13 to reduce the pressure in the first tower 4, continue desorption, and the gas that desorption is gone out also deposits surge tank 7 in, so as in the circulation of back for the gas purging step.In these two steps of desorption, when the 5th valve V5 is switched to the 6th valve V6, look the required CO of gas purging step 2amount determine.
The desorption column cooling: open the 7th valve A7, the first valve A1 and the second valve V2, common temperature cooling water is to the first tower 4 coolings.Desorption process because the first tower 4 temperature are very high, can't carry out adsorption step after finishing, therefore need cooling.On tower, temperature drops to below 30 ℃, and process finishes.Now, the adsorption process of the second tower 5 also finishes.Shut off valve three B3, open the 3rd valve A3, and now, the first tower 4 becomes adsorption tower, and the second tower 5 becomes desorption column.Enter next absorption and catch circulation.
Second level absorption:
After being filled with CO2 gas in surge tank 7 (be the first order adsorb the first tower 4 complete desorption after), just can open valve, enter second level absorption.The second level adsorb the operation principle of each adsorption tower and first order Adsorption Phase with.
The absorption of boosting: open the 8th valve V8, the tenth valve A10 and the 12 valve A12, the low-purity CO2 that will flow out from surge tank, pass into the 3rd tower 9 (now, tower B is in starting state not), and now, the 3rd tower 9 is adsorption tower.Due to the interior filling NACF of the 3rd tower 9, therefore to the CO in flue gas 2adsorbed the N be not adsorbed 2with a small amount of CO 2after flowing through adsorption tower, through the 12 valve A12, enter atmosphere.CO in recording the outlet flue gas 2for concentration in entrance 90% the time, think that adsorption process finishes.Now close the tenth valve A10 and the 12 valve A12, open valve ten B10 and valve 12 B12, the 4th tower 10 becomes adsorption tower, and the 3rd tower 9 enters desorption process, is desorption column.
Gas purging: open the 9th valve V9, the 9th valve A9 and the 12 valve A12, by the higher CO of purity obtained previously 2pass into the 3rd tower 9 from bottom to top.Because now absorption has reached balance, NACF is CO absorption no longer 2, and have the N be not adsorbed in a large number in the free space in the 3rd tower 9 2therefore, the CO passed into 2can only promote the N in free space in tower 2by the 12 valve A12, get rid of.After purge finishes, close the 9th valve V9, the 9th valve A9 and the 12 valve A12.The volume calculations of this process time used by purge gas flow and tower draws.
Desorption by heating: open the 11 valve A11, the 11 valve V11 and the 5th valve V5, open the first valve V1, the 12 valve V12, the 8th valve A8 and the 13 valve A13, utilize by the high-temperature water of flue gas, temperature on the 3rd tower 9 is raise rapidly, make a large amount of Adsorption Phase CO that are adsorbed on NACF 2escape out from adsorbent surface, become gas phase CO 2, enter air collector 16.
Step-down gas storage: when the 3rd tower 9 internal pressures drop to when identical with environmental pressure, close the 11 valve V11, open the 6th valve V6, utilize the second vavuum pump 15 to reduce the pressure of the 3rd tower 9, continue desorption, and the gas that desorption is gone out also deposits surge tank 7 in, so as in the circulation of back for the gas purging step.In these two steps of desorption, when the 5th valve V5 is switched to the 6th valve V6, look the required CO of gas purging step 2amount determine.
Desorption column cooling: open the 12 valve V12, the 8th valve A8, the 14 valve A14, desorption column is lowered the temperature.Desorption process because temperature on tower is very high, can't carry out adsorption step after finishing, therefore need cooling.On the 3rd tower 9, temperature drops to below 30 ℃, and process finishes.Now, the adsorption process of the 4th tower 10 also finishes.Shut off valve ten B10, open the tenth valve A10, and now, the 3rd tower 9 becomes adsorption tower, and the 4th tower 10 becomes desorption column.Enter next absorption and catch circulation.

Claims (2)

1. the two-stage of the double tower with a heat reclamation device CO 2the absorption capture systems, is characterized in that described system comprises high-temperature flue gas pipe (1), heat exchanger (2), normal temperature fume pipe (3), the first tower (4), the second tower (5), the first outlet pipe (6), surge tank (7), cold water pipe (8), the 3rd tower (9), the 4th tower (10), normal temperature water pipe (11), high-temperature conduit (12), the first vavuum pump (13), the second outlet pipe (14), the second vavuum pump (15), air collector (16), the first valve (A1), second valve (A2), the 3rd valve (A3), the 4th valve (A4), the 5th valve (A5), the 6th valve (A6), the 7th valve (A7), the 8th valve (A8), the 9th valve (A9), the tenth valve (A10), the 11 valve (A11), the 12 valve (A12), the 13 valve (A13), the 14 valve (A14), valve one (B1), valve two (B2), valve three (B3), valve four (B4), valve five (B5), valve six (B6), valve seven (B7), valve eight (B8), valve nine (B9), valve ten (B10), valve 11 (B11), valve 12 (B12), valve 13 (B13), valve 14 (B14), the first valve (V1), the second valve (V2), the 3rd valve (V3), the 4th valve (V4), the 5th valve (V5), the 6th valve (V6), the 7th valve (V7), the 8th valve (V8), the 9th valve (V9), the tenth valve (V10), the 11 valve (V11), the 12 valve (V12) and the 14 valve (V14), compose in parallel the valve group with the 4th valve (V4) after the 3rd valve (V3) and the first vavuum pump (13) series connection,
High-temperature flue gas pipe (1) is communicated with an end of normal temperature fume pipe (3) by heat exchanger (2), normal temperature fume pipe (3) is communicated with the 3rd valve (A3) and valve three (B3) respectively, the 3rd valve (A3) is communicated with the smoke inlet of the first tower (4), and valve three (B3) is communicated with the smoke inlet of the second tower (5);
The top of the first tower (4) is respectively equipped with downtake pipe (4-1) and first row CO 2pipe (4-2), downtake pipe (4-1) is provided with the 5th valve (A5), the delivery port of the first tower (4) is communicated with an end of the first outlet pipe (6) by the first valve (A1), and the first outlet pipe (6) is provided with the second valve (V2), first row CO 2pipe (4-2) is provided with the 4th valve (A4), and the port of export of the 4th valve (A4) is communicated with the entrance point of valve group;
The top of the second tower (5) is respectively equipped with second exhaust pipe (5-1) and second row CO 2pipe (5-2), second exhaust pipe (5-1) is provided with valve five (B5), and the delivery port of the second tower (5) is communicated with an end of the first outlet pipe (6) by valve one (B1), second row CO 2pipe (5-2) is provided with valve four (B4), and the port of export of valve four (B4) is communicated with the entrance point of valve group, and the port of export of valve group is communicated with the first air inlet of surge tank (7) by the tenth valve (V10);
The entrance point of the 7th valve (V7) of the gas outlet of surge tank (7) is communicated with, the port of export of the 7th valve (V7) is communicated with by valve two (B2) and second valve (A2) respectively, valve two (B2) is communicated with the smoke inlet of the second tower (5), and second valve (A2) is communicated with the smoke inlet of the first tower (4);
Cold water pipe (8) is communicated with the 7th valve (A7), valve seven (B7), the 14 valve (A14) and valve 14 (B14) respectively, the 7th valve (A7) is communicated with the water inlet of the first tower (4), valve seven (B7) is communicated with the water inlet of the second tower (5), the 14 valve (A14) is communicated with the water inlet of the 3rd tower (9), and valve 14 (B14) is communicated with the water inlet of the 4th tower (10);
Normal temperature water pipe (11) is communicated with an end of high-temperature conduit (12) by heat exchanger (2), high-temperature conduit (12) is provided with the first valve (V1), the port of export of the first valve (V1) is communicated with the 6th valve (A6), valve six (B6), the 13 valve (A13) and valve 13 (B13) respectively, the 6th valve (A6) is communicated with the water inlet with the first tower (4), valve six (B6) is communicated with the water inlet of the second tower (5), the 13 valve (A13) is communicated with the water inlet of the 3rd tower (9), and valve 13 (B13) is communicated with the water inlet with the 4th tower (10);
The first gas outlet of surge tank (7) is communicated with the air inlet of the 8th valve (V8), the gas outlet of the 8th valve (V8) is communicated with the tenth valve (A10) and valve ten (B10) respectively, the tenth valve (A10) is communicated with the air inlet of the 3rd tower (9), and valve ten (B10) is communicated with the air inlet of the 4th tower (10);
The second gas outlet of surge tank (7) is communicated with the air inlet of the 9th valve (V9), the gas outlet of the 9th valve (V9) is communicated with the 9th valve (A9) and valve nine (B9) respectively, the 9th valve (A9) is communicated with the air inlet of the 3rd tower (9), and valve nine (B9) is communicated with the air inlet of the 4th tower (10);
The top of the 3rd tower (9) is respectively equipped with the 3rd blast pipe (9-1) and the 3rd row CO 2pipe (9-2), the 3rd blast pipe (9-1) is provided with the 12 valve (A12), the delivery port of the 3rd tower (9) is communicated with an end of the second outlet pipe (14) by the 8th valve (A8), the second outlet pipe (14) is provided with the 12 valve (V12), the 3rd row CO 2pipe (9-2) is provided with the 11 valve (A11), the port of export of the 11 valve (A11) is communicated with the entrance point of the 6th valve (V6) or the 11 valve (V11), and the port of export of the 11 valve (V11) is communicated with air collector (16) by the 5th valve (V5);
The top of the 4th tower (10) is respectively equipped with the 4th blast pipe (10-1) and the 4th row CO 2pipe (10-2), the 4th blast pipe (10-1) is provided with valve 12 (B12), and the delivery port of the 4th tower (10) is communicated with an end of the second outlet pipe (14) by valve eight (B8), the 4th row CO 2pipe (10-2) is provided with valve 11 (B11), the port of export of valve 11 (B11) is communicated with the entrance point of the 6th valve (V6) or the 11 valve (V11), the port of export of the 6th valve (V6) is communicated with the entrance point of the 14 valve (V14) by the second vavuum pump (15), and the port of export of the 14 valve (V14) is communicated with the second air inlet of surge tank (7).
2. the two-stage of the double tower with heat reclamation device CO according to claim 1 2the absorption capture systems, it is characterized in that the first valve (A1), second valve (A2), the 3rd valve (A3), the 4th valve (A4), the 5th valve (A5), the 6th valve (A6), the 7th valve (A7), the 8th valve (A8), the 9th valve (A9), the tenth valve (A10), the 11 valve (A11), the 12 valve (A12), the 13 valve (A13), the 14 valve (A14), valve one (B1), valve two (B2), valve three (B3), valve four (B4), valve five (B5), valve six (B6), valve seven (B7), valve eight (B8), valve nine (B9), valve ten (B10), valve 11 (B11), valve 12 (B12), valve 13 (B13), valve 14 (B14), the first valve (V1), the second valve (V2), the 3rd valve (V3), the 4th valve (V4), the 5th valve (V5), the 6th valve (V6), the 7th valve (V7), the 8th valve (V8), the 9th valve (V9), the tenth valve (V10), the 11 valve (V11), the 12 valve (V12) and the 14 valve (V14) are magnetic valve.
CN2012206681582U 2012-12-06 2012-12-06 Double-tower two-stage CO2 adsorption and capture system with heat recovery device Expired - Fee Related CN202921145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206681582U CN202921145U (en) 2012-12-06 2012-12-06 Double-tower two-stage CO2 adsorption and capture system with heat recovery device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206681582U CN202921145U (en) 2012-12-06 2012-12-06 Double-tower two-stage CO2 adsorption and capture system with heat recovery device

Publications (1)

Publication Number Publication Date
CN202921145U true CN202921145U (en) 2013-05-08

Family

ID=48211139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206681582U Expired - Fee Related CN202921145U (en) 2012-12-06 2012-12-06 Double-tower two-stage CO2 adsorption and capture system with heat recovery device

Country Status (1)

Country Link
CN (1) CN202921145U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102941002A (en) * 2012-12-06 2013-02-27 东北林业大学 Double-tower two-stage CO2 adsorbing and capturing system with heat recovery device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102941002A (en) * 2012-12-06 2013-02-27 东北林业大学 Double-tower two-stage CO2 adsorbing and capturing system with heat recovery device
CN102941002B (en) * 2012-12-06 2014-06-04 东北林业大学 Double-tower two-stage CO2 adsorbing and capturing system with heat recovery device

Similar Documents

Publication Publication Date Title
Jiang et al. Comparative analysis on temperature swing adsorption cycle for carbon capture by using internal heat/mass recovery
CN103961979B (en) A kind of carbon dioxide capture system of multi-stage diffluence regeneration and technique
CN107364832A (en) A kind of low temperature hydrogen purification devices and control method
CN103260725B (en) The method of final purification biogas
CN105749696B (en) A kind of carbon dioxide alternating temperature adsorption desorption system and method based on low grade heat energy
CN215259901U (en) Glass kiln flue gas carbon dioxide's entrapment purification device
CN103594136A (en) High temperature gas cooled reactor coolant purification system and purification method
CN101822929B (en) Method for capturing carbon dioxide by utilizing electrical desorption technology
CN101691320A (en) Method for purifying and recycling methane and carbon dioxide from landfill gas and device thereof
CN105032113A (en) Process for capturing carbon dioxide in flue gas based on wet reclamation technology
CN102826509B (en) Equipment for purifying general hydrogen gas into high-purity hydrogen gas
CN105006264A (en) High temperature gas-cooled reactor helium purification regeneration system and regeneration method
CN114939323A (en) Low-energy-consumption air direct carbon capture system
CN202785638U (en) Device for purifying ordinary hydrogen to be high-purity hydrogen
CN202921145U (en) Double-tower two-stage CO2 adsorption and capture system with heat recovery device
CN102941002B (en) Double-tower two-stage CO2 adsorbing and capturing system with heat recovery device
CN107138024B (en) Integrated particle fluidized carbon dioxide capture method and apparatus for power plants
CN204147734U (en) The empty separating and purifying device of a kind of runner
CN202785635U (en) Adsorptive hydrogen purifying device
TWI466711B (en) A low-energy consumption system for co2 adsorption, concentration and energy conversion
CN208829616U (en) Remove the process system of carbon dioxide in natural
CN217795387U (en) Low-energy-consumption carbon trapping device
CN206970203U (en) A kind of low temperature hydrogen purification devices
CN203379780U (en) Multi-tower type temperature swing adsorption concentration device of ventilation air marsh gas
CN203315970U (en) Device for recovering organic solvents from waste gas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20151206

EXPY Termination of patent right or utility model