CN202916643U - An operation monitoring system of an inserted lift scaffold used in building construction - Google Patents

An operation monitoring system of an inserted lift scaffold used in building construction Download PDF

Info

Publication number
CN202916643U
CN202916643U CN 201220645758 CN201220645758U CN202916643U CN 202916643 U CN202916643 U CN 202916643U CN 201220645758 CN201220645758 CN 201220645758 CN 201220645758 U CN201220645758 U CN 201220645758U CN 202916643 U CN202916643 U CN 202916643U
Authority
CN
China
Prior art keywords
overload
control box
sub
logic controller
contactor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220645758
Other languages
Chinese (zh)
Inventor
杜文友
刘龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN ZHONGCHU ENGINEERING MACHINERY Co Ltd
Original Assignee
HUNAN ZHONGCHU ENGINEERING MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ZHONGCHU ENGINEERING MACHINERY Co Ltd filed Critical HUNAN ZHONGCHU ENGINEERING MACHINERY Co Ltd
Priority to CN 201220645758 priority Critical patent/CN202916643U/en
Application granted granted Critical
Publication of CN202916643U publication Critical patent/CN202916643U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)

Abstract

An operation monitoring system of an inserted lift scaffold used in building construction is provided and comprises a master control box and branch control boxes. A logic controller is disposed in the master control box. The input end of the logic controller comprises four instruction buttons and corresponding signal indicators, and two overload signals, wherein the four instruction buttons include starting, rising, declining, and stopping. The output end of the logic controller comprises three instructions of a master contactor, a rising contactor, and a declining contactor, and two overload alarms. The two instructions of the rising contactor and the declining contactor in the output end of the logic controller of the master control box are used as the input end of the branch control boxes. The output end of a branch control box comprises an inserted lift scaffold rising and declining signal, an overload alarm, and two overload signals. The branch control boxes are connected by aviation plugs and the branch control boxes are connected with the master control box by aviation plugs. The branch control boxes are controlled by the logic controller and connected with the master control box. Overload automatic alarm of the branch control boxes are achieved by programming while indicating lamps are started by programming. The operation monitoring system facilitates overload point seeking and has characteristics of easy manipulation, easy use, secure and reliable performance, and reducing economic cost.

Description

A kind of building operation climbing frame operation supervise and control system
Technical field
The utility model relates to building operation climbing frame operation supervise and control technical field, is specifically related to a kind of building operation climbing frame operation supervise and control system.
Background technology
The environment for use of construction climbing frame is abominable on the building ground at present, and working condition is poor, and open work is cement, lime, mortar etc., all the year round Exposure to Sunlight wind and weather all around everywhere; Longevity of service, general one to two year; High to the security protection requirement when using climbing frame, least bit mistake is can't permit in work high above the ground; Frequent operation promoted once in similar three to four days, required operation safe and reliable as far as possible, simple and convenient.Current some building site is adopted in each seat in the plane probe is installed, and uses computer monitor, but needs a lot of line of cloth, and need to have the comparison technical professional to come operation and maintenance, and financial cost is too high, and is unreasonable; Monitor and control facility is not installed in some building site; adopt the mode of each seat in the plane overload jingle bell and shutdown; but because the building operation climbing frame is distributed in external wall; often can't hear the warning the tinkle of bells; cause the overload of some seats in the plane and the situation of drawing crack main frame happens occasionally; or shuts down because of the overload of certain seat in the plane and can't accurately find rapidly overload point, and then waste plenty of time searching overload point, delay the duration.
The utility model content
The technical matters that the utility model solves is to provide a kind of building operation climbing frame operation supervise and control system, and the technical matters that the utility model solves realizes by the following technical solutions:
A kind of building operation climbing frame operation supervise and control system comprises Main Control Tank and sub-control box; Be provided with logic controller in the Main Control Tank, the logic controller input end comprises startup, rising, decline, shuts down four groups of order buttons and corresponding signal designation and two groups of overload signals, and output terminal comprises main contactor, contactless for hoisting, three groups of instructions of decline contactor and two groups of overload warnings; Contactless for hoisting, two groups of instructions of decline contactor are as the sub-control box input end in the logic controller output terminal in the Main Control Tank, and the sub-control box output terminal comprises Lifting and lowering for scaffold, overload warning and two groups of overload signals; Adopt aviation plug to be connected between each sub-control box and between sub-control box and the Main Control Tank.
In the utility model, overload warning adopts audible-visual annunciator.
In the utility model, two groups of overload signals are respectively overload 10% signal and overload 20% signal in the logic controller.
In the utility model, two groups of overload warnings are respectively overload 10% warning and overload 20% warning in the logic controller.
In the utility model, two groups of overload signals of sub-control box setting are respectively overload 10% signal and overload 20% signal.
In the utility model, sub-control box is advisable to be no more than 30, and every sub-control box contains one group of power lead, one group of motor lines, one group of load signal and feedback line; Adopt aviation plug to connect between each sub-control box and between sub-control box and the Main Control Tank, line is few, and installation and maintenance are easy to use; And every sub-control box contains four signal lamps: power light, relay indicating light, overload sound and light alarm pilot lamp and overload halt indicator; Increase an auxiliary reclay in the sub-control box simultaneously, be used for isolating between each sub-control box and the signal of sub-control box and Main Control Tank, make it not interfere with each other.
In the utility model, sub-control box overload 10% ~ 20%, overload sound and light alarm pilot lamp is glittering state, audible-visual annunciator sounds; Overload is greater than 20%, and the overload halt indicator is normal bright state, and audible-visual annunciator sounds.
In the utility model, start the Main Control Tank power knob, the power supply main contactor is connected, and presses the rising button again, and power supply is delivered to each sub-control box, starts each seat in the plane electric block, drives building operation climbing frame integral body and climbs.If the overload of a certain seat in the plane can arrange as requested at 10% ~ 20%(), then this seat in the plane sub-control box audible-visual annunciator is reported to the police, overload sound and light alarm pilot lamp is glittering state, and the signal feedback that will overload simultaneously is to Main Control Tank, and the Main Control Tank 10% chimes of doom light crossing-signal that overloads sounds; If the overload of a certain seat in the plane can arrange as requested greater than 20%(), then this seat in the plane sub-control box is shut down, and the overload halt indicator is normal bright state, and Main Control Tank has a power failure automatically, and the Main Control Tank 20% chimes of doom light crossing-signal that overloads sounds simultaneously.Operating personnel can find out rapidly the seat in the plane of overload according to the warning of audible-visual annunciator like this, in time process.
Beneficial effect: the primary power of controlling main sub-control box in the utility model by logic controller, and sub-control box is connected with Main Control Tank, realize master, sub-control box overload while automatic alarm and start pilot lamp by programming, easy-to-look-up overload point, simple operation, easy to use, performance is more safe and reliable, has reduced simultaneously financial cost.
Description of drawings
Fig. 1 is the structural representation of the utility model preferred embodiment.
Embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
A kind of building operation climbing frame operation supervise and control system referring to Fig. 1 comprises Main Control Tank and sub-control box; Be provided with logic controller in the Main Control Tank, the logic controller input end comprises startup, rising, decline, shuts down four groups of order buttons and corresponding signal designation and overload 10% signal and overload 20% signal, and output terminal comprises main contactor, contactless for hoisting, three groups of instructions of decline contactor and 10% warning that overloads is reported to the police with overload 20%; Contactless for hoisting, two groups of instructions of decline contactor are as the sub-control box input end in the logic controller output terminal in the Main Control Tank, and the sub-control box output terminal comprises Lifting and lowering for scaffold, overload warning and overloads 10% signal and overload 20% signal; Adopt aviation plug to be connected between each sub-control box and between sub-control box and the Main Control Tank.
In the present embodiment, overload warning adopts audible-visual annunciator.
In the present embodiment, sub-control box is 30, and every sub-control box contains one group of power lead, one group of motor lines, one group of load signal and feedback line; Adopt aviation plug to connect between each sub-control box and between sub-control box and the Main Control Tank, line is few, and installation and maintenance are easy to use; And every sub-control box contains four signal lamps: power light, relay indicating light, overload sound and light alarm pilot lamp and overload halt indicator; Increase an auxiliary reclay in the sub-control box simultaneously, be used for isolating between each sub-control box and the signal of sub-control box and Main Control Tank, make it not interfere with each other.
In the present embodiment, sub-control box overload 10% ~ 20%, overload sound and light alarm pilot lamp is glittering state, audible-visual annunciator sounds; Overload is greater than 20%, and the overload halt indicator is normal bright state, and audible-visual annunciator sounds.
In the present embodiment, start the Main Control Tank power knob, the power supply main contactor is connected, and presses the rising button again, and power supply is delivered to each sub-control box, starts each seat in the plane electric block, drives building operation climbing frame integral body and climbs.If the overload of a certain seat in the plane is 10% ~ 20%, then this seat in the plane sub-control box audible-visual annunciator is reported to the police, and overload sound and light alarm pilot lamp is glittering state, and the signal feedback that will overload simultaneously is to Main Control Tank, and the Main Control Tank 10% chimes of doom light crossing-signal that overloads sounds; If the overload of a certain seat in the plane is greater than 20%, then this seat in the plane sub-control box is shut down, and the overload halt indicator is normal bright state, and Main Control Tank has a power failure automatically, and the Main Control Tank 20% chimes of doom light crossing-signal that overloads sounds simultaneously.Operating personnel can find out rapidly the seat in the plane of overload according to the warning of audible-visual annunciator like this, in time process.
Above demonstration and described ultimate principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that describes in above-described embodiment and the instructions just illustrates principle of the present utility model; under the prerequisite that does not break away from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (4)

1. a building operation climbing frame operation supervise and control system comprises Main Control Tank and sub-control box; It is characterized in that, be provided with logic controller in the Main Control Tank, the logic controller input end comprises startup, rising, decline, shuts down four groups of order buttons and corresponding signal designation and two groups of overload signals, and output terminal comprises main contactor, contactless for hoisting, three groups of instructions of decline contactor and two groups of overload warnings; Contactless for hoisting, two groups of instructions of decline contactor are as the sub-control box input end in the logic controller output terminal in the Main Control Tank, and the sub-control box output terminal comprises Lifting and lowering for scaffold, overload warning and two groups of overload signals; Adopt aviation plug to be connected between each sub-control box and between sub-control box and the Main Control Tank.
2. a kind of building operation climbing frame operation supervise and control according to claim 1 system is characterized in that, overload warning adopts audible-visual annunciator.
3. a kind of building operation climbing frame operation supervise and control according to claim 1 system is characterized in that, sub-control box contains one group of power lead, one group of motor lines, one group of load signal and feedback line.
4. a kind of building operation climbing frame operation supervise and control according to claim 1 system is characterized in that, sub-control box contains four signal lamps: power light, relay indicating light, overload sound and light alarm pilot lamp and overload halt indicator.
CN 201220645758 2012-11-30 2012-11-30 An operation monitoring system of an inserted lift scaffold used in building construction Expired - Fee Related CN202916643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220645758 CN202916643U (en) 2012-11-30 2012-11-30 An operation monitoring system of an inserted lift scaffold used in building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220645758 CN202916643U (en) 2012-11-30 2012-11-30 An operation monitoring system of an inserted lift scaffold used in building construction

Publications (1)

Publication Number Publication Date
CN202916643U true CN202916643U (en) 2013-05-01

Family

ID=48164941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220645758 Expired - Fee Related CN202916643U (en) 2012-11-30 2012-11-30 An operation monitoring system of an inserted lift scaffold used in building construction

Country Status (1)

Country Link
CN (1) CN202916643U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836776A (en) * 2017-03-23 2017-06-13 邢台亚特工业自动化科技有限公司 Intelligent climbing frame control system and control method
CN110750080A (en) * 2019-11-06 2020-02-04 江西志特新材料股份有限公司 Intelligent climbing frame control system and control method thereof
CN111198532A (en) * 2020-01-20 2020-05-26 北京韬盛科技发展有限公司 Time-division multiplexing cross start-stop system and control method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836776A (en) * 2017-03-23 2017-06-13 邢台亚特工业自动化科技有限公司 Intelligent climbing frame control system and control method
CN106836776B (en) * 2017-03-23 2019-10-18 邢台亚特工业自动化科技有限公司 Intelligent climbing frame control system and control method
CN110750080A (en) * 2019-11-06 2020-02-04 江西志特新材料股份有限公司 Intelligent climbing frame control system and control method thereof
CN111198532A (en) * 2020-01-20 2020-05-26 北京韬盛科技发展有限公司 Time-division multiplexing cross start-stop system and control method thereof
CN111198532B (en) * 2020-01-20 2021-06-22 北京韬盛科技发展有限公司 Time-division multiplexing cross start-stop system and control method thereof

Similar Documents

Publication Publication Date Title
CN102849544B (en) Elevator lift control system and method
CN102393760A (en) Drainage control system for substation cable layer
CN202916643U (en) An operation monitoring system of an inserted lift scaffold used in building construction
CN202306222U (en) Intelligent drainage system for cable layer of transformer substation
CN102883503A (en) Centralized control fire-fighting emergency lighting and evacuation indication system and implementing method thereof
CN204140130U (en) Colliery portable blower automated system
CN111999676A (en) Electric leakage fault remote alarm system for transformer substation
CN201438379U (en) Remote alarm threshold modification system
CN205608449U (en) Fire damp monitored control system of double layer reticulated twine
CN106163055A (en) A kind of emergency lighting controller able circuit
CN103854408A (en) Fire alarm and coordinated control system
CN206431469U (en) A kind of safety monitoring system for climbing frame
CN211006235U (en) Mixing cylinder power-off safety protection device of pavement engineering mixing equipment
CN201362533Y (en) Automatic alarm switch system of vertical well construction hoisting winch
CN206842941U (en) A kind of tunnel shaft construction winch device safe to use
CN205334682U (en) Long -range monitoring alarm system of lift foundation for construction well emergency exit
CN206264805U (en) A kind of charging station
CN203187330U (en) Lifting protection device of electric hoist for lifting refractory bricks
CN206848786U (en) A kind of alarm and emergency stop device for power station
CN203382406U (en) Wireless audible and visual alarm system of tower crane
CN204847957U (en) Tower crane all -in -one
CN202253583U (en) Automatic water supply device for boiler
CN204287886U (en) A kind of air compressor machine remote monitoring and control device
CN203630962U (en) Multifunctional tunnel lane controller
CN213092152U (en) Elevator signal system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130501

Termination date: 20151130

EXPY Termination of patent right or utility model