CN202900226U - Ball plugging feeding device for realizing multistage temporary plugging multi-joint fracturing process - Google Patents

Ball plugging feeding device for realizing multistage temporary plugging multi-joint fracturing process Download PDF

Info

Publication number
CN202900226U
CN202900226U CN 201220592404 CN201220592404U CN202900226U CN 202900226 U CN202900226 U CN 202900226U CN 201220592404 CN201220592404 CN 201220592404 CN 201220592404 U CN201220592404 U CN 201220592404U CN 202900226 U CN202900226 U CN 202900226U
Authority
CN
China
Prior art keywords
ball
stifled
fairlead
outer peripheral
gland
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220592404
Other languages
Chinese (zh)
Inventor
陈文斌
常彦荣
赵继勇
陆红军
陈宝春
李建山
齐银
常笃
李照林
董立全
杜现飞
王建麾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN 201220592404 priority Critical patent/CN202900226U/en
Application granted granted Critical
Publication of CN202900226U publication Critical patent/CN202900226U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Gears, Cams (AREA)

Abstract

The utility model discloses a realize multistage stifled multisection fracturing technology's stifled ball feeding device temporarily is thrown to throw for realizing the remote control and is thrown stifled ball and improve and temporarily block up the progression and design, and this device uide bushing inner wall comprises the axial semicircle section of thick bamboo wall of number row, and the screw axis outer peripheral face of establishing in the uide bushing is formed by semicircle spiral concave surface. The upper end and the lower end of the guide sleeve are connected with the gland and the base tee joint and are connected with the transmission and power mechanism. The inner wall of the guide sleeve and the outer peripheral surface of the screw shaft can form a plurality of small ball chambers, and the rotation of the screw shaft enables the blocking balls to be continuously pushed along the axial direction. The device has large ball storage capacity, can realize multiple adding and has high temporary plugging stage number; the automatic pitching machine can automatically, continuously and uniformly pitch balls through a set program, automatically calculate and display pitching count; the remote control of work can be implemented at a place far away from a high-pressure area of a wellhead, and the construction safety risk is low; the transmission performance is good, and the efficiency is as high as 98%; the corrosion resistance and the sealing performance are excellent; the device has high bearing strength, the design safety factor is more than 3 times of the working pressure, and the safety is high.

Description

Realize the stifled ball throwing device of multistage temporarily stifled multiple crack fracturing technique
Technical field
The utility model relates to a kind of stifled ball throwing device of realizing multistage temporarily stifled multiple crack fracturing technique, belongs to oil reservoir multiple crack fracturing technical field.
Background technology
The ultra-low penetration oil reservoir has Compacted rock, poor properties, well yield is low and the fast characteristic of production decline.Multistage temporarily stifled multiple crack fracturing technique is to study according to the theory of volume fracturing, its principle is according to pressing off the large characteristics of interval liquid absorption, bring a certain amount of stifled ball into to pressing off interval with fracturing fluid, implement temporary transient shutoff, force fracturing fluid enter other do not press off the layer build the pressure, press off another perforated interval.So repeatedly carry out, until press off all intervals in the reservoir, reach the purpose that enlarges the earial drainage volume and improve well yield.
At present, realize that the multistage temporarily stifled ball dosing method of stifled multiple crack fracturing technique mainly adopts the special-purpose ball injector of temporarily stifled pressure break, its operating process is before the construction ball injector to be connected to well head, will block up the ball ball injector of packing into.In pressing crack construction, the constructor operates the ball injector pull bar, and the stifled ball below 100 is dropped in the well one by one.The constructor stands in well head higher-pressure region implementation and operation, and security risk is very large.The stifled ball quantity of packing into is few, adds number of times limited, can not farthest enlarge the earial drainage volume, improves well yield.Manually adding stifled ball can not the accurate-metering input quantity, adds speed discontinuous, inhomogeneous, affects very much the effect of multistage temporarily stifled multiple crack fracturing technique.
Summary of the invention
The purpose of this utility model is to provide a kind of stifled ball throwing device of realizing multistage temporarily stifled multiple crack fracturing technique, and it can realize that the Remote automatic feeding blocks up ball, improves temporarily stifled progression, enlarges the earial drainage volume and improves well yield.
Concrete technical scheme of the present utility model is as follows:
Be provided with helical axis in the fairlead of this stifled ball throwing device, the fairlead inwall is comprised of the axial semi arch barrel of ordered series of numbers, and the helical axis outer peripheral face is formed by semi arch spiral concave surface.The fairlead bottom connects the base threeway, and the upper end connects gland.The gland top is by rotating shaft auxiliary connection travelling gear.Auxiliary driving gear and main drive gear are connected with a joggle.Main drive gear connects planetary reduction gear and the fire-proof motor that is located on the fairlead outer peripheral face.
The beneficial effects of the utility model are as follows:
This device storage ball capacity large (nearly 400) can be realized repeatedly adding, and stifled progression is high temporarily; Can be by automatically, continuously and evenly pitching of setting program, automatically computing and demonstration ball count; Can be in the local implementation remote control away from the well head higher-pressure region, construction safety risk is low; Transmission performance is good, and efficient is up to 98%; Corrosion resistance and sealing performance are good; Device bearing strength high (operating pressure is 105MPa, and delivery test pressure is 120MPa), design safety factor is more than 3 times of operating pressure, and is safe.
Description of drawings
Fig. 1 is for realizing the stifled ball throwing device structural representation of multistage temporarily stifled multiple crack fracturing technique.
Fig. 2 is the guide sleeve structure schematic diagram.
Fig. 3 is the fairlead radial cross-section.
Fig. 4 is for realizing the stifled ball throwing device work schematic diagram of multistage temporarily stifled multiple crack fracturing technique.
The specific embodiment
With reference to Fig. 1 embodiment of the present utility model is further specified:
Embodiment:
This stifled ball throwing device is comprised of fire-proof motor 1, planetary reduction gear 2, main drive gear 3, auxiliary driving gear 4, rotating shaft 5, gland 6, fairlead 7, helical axis 8 and base threeway 9:
Be provided with helical axis 8 in the tubular fairlead 7, fairlead 7 inwalls are comprised of the axial semi arch barrel of ordered series of numbers, and helical axis 8 outer peripheral faces are formed by semi arch spiral concave surface.Fairlead 7 bottoms connect base threeway 8, and the upper end connects gland 6.Gland 6 tops are by rotating shaft 5 auxiliary connection travelling gears 4.Auxiliary driving gear 4 is connected with a joggle with main drive gear 3.Main drive gear 3 connects planetary reduction gear 2 and the fire-proof motor 1 that is located on fairlead 7 outer peripheral faces.
Because every row semi arch barrel of fairlead 7 inwalls and the semi arch spiral concave surface that helical axis 8 whenever revolves floor all can form the bead chamber, so, the Chu Qiuliang of fairlead 7 can significantly be increased.Along with the rotation of helical axis 8, stifled ball is advanced vertically by semi arch spiral concave surface, and the unit distance that stifled ball is advanced is the helical pitch that helical axis 8 rotates a circle.
Installation of the present utility model and the course of work are as follows:
Before the pressing crack construction, this stifled ball throwing device is fixed on well head 11, connects well head 11 and fracturing unit truck 10 by high pressure line.Long-distance control cabinet 12 is located at distance construction higher-pressure region 40m locates in addition, by sensing cable access 220V AC power.
Main drive gear 3, auxiliary driving gear 4 and gland 6 are unloaded, and clockwise slowly rotating shaft 5 will block up the ball fairlead 7 of packing into one by one simultaneously.After stifled ball is filled, cover tightly gland 6, load onto main drive gear 3 and auxiliary driving gear 4.
In the fracturing process, fracturing fluid enters the measure oil well through fracturing unit truck 10, base threeway 8 and well head 11.In the time of need adding stifled ball, start long-distance control cabinet 12,1 work of instruction fire-proof motor, planetary reduction gear 2 reductions of speed drive main drive gear 3 and auxiliary driving gear 4 low cruises, drive rotating shaft 5 and fairlead 7 rotations.Along with the low speed rotation of fairlead 7, stifled ball falls into base threeway 8 one by one, enters the measure oil well with fracturing fluid.Meanwhile, long-distance control cabinet 12 can show the quantity that adds of stifled ball.Add finish after, added by long-distance control cabinet 12 instructions and to stop.

Claims (1)

1. realize the multistage stifled ball throwing device that blocks up temporarily multiple crack fracturing technique for one kind, it is characterized in that:
Be provided with helical axis (8) in the fairlead (7) of this stifled ball throwing device, fairlead (7) inwall is comprised of the axial semi arch barrel of ordered series of numbers, and helical axis (8) outer peripheral face is formed by semi arch spiral concave surface; Fairlead (7) bottom connects base threeway (8), and the upper end connects gland (6); Gland (6) top is by rotating shaft (5) auxiliary connection travelling gear (4); Auxiliary driving gear (4) is connected with a joggle with main drive gear (3); Main drive gear (3) connects planetary reduction gear (2) and the fire-proof motor (1) that is located on fairlead (7) outer peripheral face.
CN 201220592404 2012-11-12 2012-11-12 Ball plugging feeding device for realizing multistage temporary plugging multi-joint fracturing process Expired - Fee Related CN202900226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220592404 CN202900226U (en) 2012-11-12 2012-11-12 Ball plugging feeding device for realizing multistage temporary plugging multi-joint fracturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220592404 CN202900226U (en) 2012-11-12 2012-11-12 Ball plugging feeding device for realizing multistage temporary plugging multi-joint fracturing process

Publications (1)

Publication Number Publication Date
CN202900226U true CN202900226U (en) 2013-04-24

Family

ID=48120909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220592404 Expired - Fee Related CN202900226U (en) 2012-11-12 2012-11-12 Ball plugging feeding device for realizing multistage temporary plugging multi-joint fracturing process

Country Status (1)

Country Link
CN (1) CN202900226U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967467A (en) * 2014-05-23 2014-08-06 湖南唯科拓石油科技服务有限公司 Counting device and multistage all-diameter ball injection sliding sleeve device
CN104790932A (en) * 2015-04-21 2015-07-22 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Continuous layered fracturing ball injector and control method thereof
CN105672975A (en) * 2016-03-15 2016-06-15 中国石油大学(华东) Automatic ball injector for segmented fracture of well mouth of horizontal well
CN113294136A (en) * 2021-07-08 2021-08-24 上海清河机械有限公司 Ball injector for oil field fracturing
CN114562246A (en) * 2022-03-21 2022-05-31 西南石油大学 Continuous ball-throwing device with intelligent monitoring function for fracturing temporary plugging and method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967467A (en) * 2014-05-23 2014-08-06 湖南唯科拓石油科技服务有限公司 Counting device and multistage all-diameter ball injection sliding sleeve device
CN103967467B (en) * 2014-05-23 2016-08-10 湖南唯科拓石油科技服务有限公司 Counting assembly and multistage full-bore pitching sliding bush apparatus
CN104790932A (en) * 2015-04-21 2015-07-22 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Continuous layered fracturing ball injector and control method thereof
CN104790932B (en) * 2015-04-21 2017-07-25 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of continuous stratification pressure break ball injector and its control method
CN105672975A (en) * 2016-03-15 2016-06-15 中国石油大学(华东) Automatic ball injector for segmented fracture of well mouth of horizontal well
CN113294136A (en) * 2021-07-08 2021-08-24 上海清河机械有限公司 Ball injector for oil field fracturing
CN114562246A (en) * 2022-03-21 2022-05-31 西南石油大学 Continuous ball-throwing device with intelligent monitoring function for fracturing temporary plugging and method thereof

Similar Documents

Publication Publication Date Title
CN202900226U (en) Ball plugging feeding device for realizing multistage temporary plugging multi-joint fracturing process
CN104563995B (en) A kind of pressure break fracturing blender truck
CN104563994A (en) Fracturing blender truck
CN107053480A (en) A kind of construction concrete mortar mixing stirring device
CN104727792B (en) A kind of reservoir water self adaptation deep entirety regulation device and construction method
CN205868117U (en) Automatic mechanical stirring device is irrigated in movable forestry
CN204185850U (en) A kind of positive and negative headstock of cement-soil mixing pile machine and mixing pile machine
CN205117304U (en) Long-stroke oil pumping machine
CN205152955U (en) Multiple wing steel sleeve valve pipe reinforcing apparatus
CN201747329U (en) Sand cleaning tool of large-inclination and large-well diameter absorption well
CN203112800U (en) Feeding mechanical arm
CN202688987U (en) Spiral pile machine
CN102767332A (en) Screw pile machine and cast-in place pile construction method
CN109098655B (en) Multi-power composite drilling tool, preparation method and pile
CN204244706U (en) The flood pattern of a kind of Odontobutis obscura and paddy rice mixed breed
CN208089226U (en) A kind of extruding and removing soil combination drill tool and CFG extruding and removing soil stakes
CN202767873U (en) Guide rail type emulsified liquid hydraulic drilling rig for coal mine
CN110145228B (en) Screw-thread matched type composite drilling tool, preparation method and pile
CN201785752U (en) Transverse rotation type deep-mixing pile driver
CN210343236U (en) Thread matching type multi-power composite drilling tool and profile pile
CN207214931U (en) Tunnel Engineering blasting cartridge automated production powder charge mechanism
CN203531811U (en) Storing and stirring integrated mud sand mulling device
CN202300406U (en) Novel grouting device
CN2921278Y (en) Shaft sinking inter lining multipoint fast slip casting device by freezing method
CN206299127U (en) A kind of constructional column Quick pouring machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20211112