CN202897823U - Special hanger for disassembly and assembly of main transformer sleeve - Google Patents

Special hanger for disassembly and assembly of main transformer sleeve Download PDF

Info

Publication number
CN202897823U
CN202897823U CN 201220509051 CN201220509051U CN202897823U CN 202897823 U CN202897823 U CN 202897823U CN 201220509051 CN201220509051 CN 201220509051 CN 201220509051 U CN201220509051 U CN 201220509051U CN 202897823 U CN202897823 U CN 202897823U
Authority
CN
China
Prior art keywords
anchor ears
special hanger
main transformer
anchor ear
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220509051
Other languages
Chinese (zh)
Inventor
郭跃东
周建军
王修庞
尹光献
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201220509051 priority Critical patent/CN202897823U/en
Application granted granted Critical
Publication of CN202897823U publication Critical patent/CN202897823U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a special hanger for disassembly and assembly of a main transformer sleeve. The special hanger comprises two same arc-shaped anchor ears, wherein one ends of the two anchor ears are connected by virtue of a swivel pin, and the other ends of the two anchor ears are provided with flexible connection components; the middle parts of the two anchor ears are provided with hoisting rings; and the inner walls of the two anchor ears are provided with liner layers. The special hanger can form an integral arc which can be unfolded and folded; in a folding state, the two anchor ears can be well fixed by virtue of the flexible connection components; the middle parts of the two anchor ears are provided with the hoisting rings which are symmetrically distributed, so that a steel wire rope can be well hung; The inner walls of the two anchor ears are provided with the liner layers, so that the steel anchor ears can be effectively prevented from damaging the insulating sleeve of a main transformer; in addition, the steel wire rope is used as a lifting rope, so that the safety coefficient is high, and further the damages, caused by lifting angle in-controllability, to the insulating sleeve due to overlarge elastic deformation of a nylon rope is also avoided; The special hanger disclosed by the utility model is simple in structure, convenient in operation, high in safety coefficient and easy in popularization and use.

Description

A kind of main transformer sleeve pipe dismounting special hanger
Technical field
The utility model belongs to the lifting device technical field, particularly a kind of main transformer sleeve pipe dismounting special hanger.
Background technology
Main transformer is the visual plant in the electric system, if find in maintenance process that the insulating tube built-in electrical insulation of voltage transformer reduces, dielectric loss exceeds standard or capacitance is when unusual, all need to use crane that insulating tube is hung oneself from voltage transformer, carry out targetedly Disintegration overhaul, with crane insulating tube is hung on the voltage transformer again after fixing and install.But because bushing for transformer is porcelain piece, in the process of dismounting, damage easily insulating tube, mostly present operational method is: adopt nylon rope when lifting, because new nylon rope intensity is large, appearance is soft, directly be bundled in nylon rope on the outside face of insulating tube and lift, can effectively avoid the damage to the insulating tube appearance; But the elasticity of nylon rope is large, and is also very large for the angle impact of lifting.Therefore adopt nylon rope lifting insulating tube can only solve the lifting rope to the damage of insulating tube, can not solve the inaccurate damage that insulating tube is caused of the lifting angle that causes owing to the nylon rope elastic deformation is excessive.And along with the increase of tenure of use and the impact of storage condition, nylon rope also can make moist, goes mouldy, disconnected strand, continue to use and all can rupture at any time, cause insulating tube to damage.The utility model provides a kind of main transformer sleeve pipe dismounting special hanger for the problems referred to above.
The utility model content
The main transformer sleeve pipe dismounting special hanger that provides a kind of coefficient easy to use, safe high is provided the utility model purpose.
To achieve these goals, the technical solution adopted in the utility model is: a kind of main transformer sleeve pipe dismounting special hanger, it comprises the anchor ear of two identical circular arcs, described two anchor ear one ends are by the connection of shipping and reselling on another market, described two anchor ear other ends arrange the flexible connection member, described two anchor ears middle part arranges suspension ring, on described two anchor ear inwalls laying is set.
Described flexible connection member comprises the connecting panel that is arranged at described anchor ear end, and described connecting panel is flexibly connected by screw bolt and nut.
Described laying is fixed by flathead screw.
The utility model comprises the anchor ear of two identical circular arcs, described two anchor ear one ends form a complete circular arc that can open, close up by the connection of shipping and reselling on another market, and described two anchor ear other ends arrange the flexible connection member, when closing up state, can well fix described two anchor ears; Described two anchor ears middle part arranges suspension ring, and two described suspension ring are symmetrical, can well articulate steel rope; On described two anchor ear inwalls laying is set, can prevent effectively that the steel anchor ear is to the damage of main transformer insulating tube, use in addition steel rope as the lifting rope, not only safety factor is high, has also avoided simultaneously causing lifting by crane the angle damage that insulating tube is caused out of control because the nylon rope elastic deformation is excessive.Described flexible connection member comprises the connecting panel that is arranged at described anchor ear end, described connecting panel is flexibly connected by screw bolt and nut, and this preferred version can well be realized opening, closing up of described anchor ear, and the bolt Joint strenght is large when closing up, and is safe.Described laying is fixed by flathead screw, can prevent the relative sliding of insulating tube, and obvolvent is stable, and can reduce changing of the relative positions damage, increases the service life.The utility model in use has two kinds of situations: when the at right angle setting insulating tube, only need on the top of bushing for transformer a described main transformer sleeve pipe dismounting special hanger to be installed, the two ends of steel rope are separately fixed on the hanging ring of both sides, utilize crane to carry out dismounting and get final product; When tilting bushing for transformer is installed, then need to be on the top of bushing for transformer and near the attachment flange place being installed respectively by a described main transformer sleeve pipe dismounting special hanger, when using the steel cable lifting, the two ends of steel rope are separately fixed on the suspension ring of two described main transformer sleeve pipe dismounting special hanger the same sides, utilizing crane to carry out dismounting gets final product, when perhaps using two steel rope liftings, the two ends of short steel cable are separately fixed on the ambilateral suspension ring of bushing for transformer top described main transformer sleeve pipe dismounting Special-purpose hanger, the two ends of long steel cable are separately fixed at bushing for transformer near on the ambilateral suspension ring of described main transformer sleeve pipe dismounting Special-purpose hanger at attachment flange place, utilize crane to carry out dismounting.No matter be to use steel cable or use two steel ropes, the lifting angle of bushing for transformer can satisfy the lifting requirement by the length of adjustment steel rope and the relative fixed position of upper and lower two special hangers.The utility model is simple in structure, easy to operate, safety factor is high, generally promotes the use of than being easier to.
Description of drawings
The utility model is further described below in conjunction with accompanying drawing:
Fig. 1 is structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, a kind of main transformer sleeve pipe dismounting special hanger, it comprises the anchor ear 1 of two identical circular arcs, described two anchor ear 1 one ends are by 2 connections of shipping and reselling on another market, described two anchor ear 1 other ends arrange the flexible connection member, described two anchor ear 1 middle parts arrange suspension ring 3, on described two anchor ear 1 inwalls laying 4 are set.
Described flexible connection member comprises the connecting panel 5 that is arranged at described anchor ear 1 end, and described connecting panel 5 is flexibly connected by bolt 6 and nut 7.
Described laying 4 is fixing by flathead screw 8.
The utility model comprises the anchor ear 1 of two identical circular arcs, described two anchor ear 1 one ends are by 2 connections of shipping and reselling on another market, form a complete circular arc that can open, close up, described two anchor ear 1 other ends arrange the flexible connection member, when closing up state, can well fix described two anchor ears 1; It is symmetrical that described two anchor ear 1 middle parts arrange the described suspension ring of 3, two on suspension ring 3, can well articulate steel rope; On described two anchor ear 1 inwalls laying 4 is set, can effectively prevent the damage of 1 pair of main transformer insulating tube of described anchor ear, use in addition steel rope as the lifting rope, not only safety factor is high, has also avoided simultaneously causing lifting by crane the angle damage that insulating tube is caused out of control because the nylon rope elastic deformation is excessive.Described flexible connection member comprises the connecting panel 5 that is arranged at described anchor ear 1 end, described connecting panel is flexibly connected by bolt 6 and nut 7, and this scheme can well realize opening, closing up of described anchor ear 1, and the Joint strenght of described bolt 6 and nut 7 is large, safe when closing up.Described laying 4 is fixing by flathead screw 8, can prevent the relative sliding of insulating tube, and obvolvent is stable, and can reduce changing of the relative positions damage, increases the service life.The utility model in use has two kinds of situations: when the at right angle setting insulating tube, only need on the top of bushing for transformer a described main transformer sleeve pipe dismounting special hanger to be installed, the two ends of steel rope are separately fixed on the described suspension ring 3 of both sides, utilize crane to carry out dismounting and get final product; When tilting bushing for transformer is installed, then need to be on the top of bushing for transformer and near the attachment flange place being installed respectively by a described main transformer sleeve pipe dismounting special hanger, when using the steel cable lifting, the two ends of steel rope are separately fixed on the suspension ring 3 of two described main transformer sleeve pipe dismounting special hanger the same sides, utilizing crane to carry out dismounting gets final product, when perhaps using two steel rope liftings, the two ends of short steel cable are separately fixed on the ambilateral suspension ring 3 of bushing for transformer top described main transformer sleeve pipe dismounting Special-purpose hanger, the two ends of long steel cable are separately fixed at bushing for transformer near on the ambilateral suspension ring 3 of described main transformer sleeve pipe dismounting Special-purpose hanger at attachment flange place, utilize crane to carry out dismounting.No matter be to use steel cable or use two steel ropes, the lifting angle of bushing for transformer can satisfy the lifting requirement by the length of adjustment steel rope and the relative fixed position of upper and lower two special hangers.The utility model is simple in structure, easy to operate, safety factor is high, generally promotes the use of than being easier to.

Claims (3)

1. main transformer sleeve pipe dismounting special hanger, it is characterized in that: it comprises the anchor ear of two identical circular arcs, described two anchor ear one ends are by the connection of shipping and reselling on another market, described two anchor ear other ends arrange the flexible connection member, described two anchor ears middle part arranges suspension ring, on described two anchor ear inwalls laying is set.
2. main transformer sleeve pipe dismounting special hanger as claimed in claim 1, it is characterized in that: described flexible connection member comprises the connecting panel that is arranged at described anchor ear end, and described connecting panel is flexibly connected by screw bolt and nut.
3. main transformer sleeve pipe dismounting special hanger as claimed in claim 1, it is characterized in that: described laying is fixed by flathead screw.
CN 201220509051 2012-10-07 2012-10-07 Special hanger for disassembly and assembly of main transformer sleeve Expired - Fee Related CN202897823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220509051 CN202897823U (en) 2012-10-07 2012-10-07 Special hanger for disassembly and assembly of main transformer sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220509051 CN202897823U (en) 2012-10-07 2012-10-07 Special hanger for disassembly and assembly of main transformer sleeve

Publications (1)

Publication Number Publication Date
CN202897823U true CN202897823U (en) 2013-04-24

Family

ID=48118517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220509051 Expired - Fee Related CN202897823U (en) 2012-10-07 2012-10-07 Special hanger for disassembly and assembly of main transformer sleeve

Country Status (1)

Country Link
CN (1) CN202897823U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103640961A (en) * 2013-11-25 2014-03-19 湖州市妙西镇资产经营有限公司 Steel aluminum belt hoisting and clamping device
CN103663128A (en) * 2013-12-24 2014-03-26 天威保变(秦皇岛)变压器有限公司 Hoisting method for transformer bushing
CN104003322A (en) * 2014-04-28 2014-08-27 国家电网公司 Open-close pipe shaft lifting tackle
CN107610882A (en) * 2017-10-31 2018-01-19 南方电网科学研究院有限责任公司 Raise the transformer that seat is reinforced
CN107826969A (en) * 2017-10-19 2018-03-23 成都科盛石油科技有限公司 Suitable for the clamp system of pipeline transportation
CN108341328A (en) * 2018-02-02 2018-07-31 浙江大学 A kind of adjustable lifting anchor ear device of diameter
CN108557638A (en) * 2018-05-15 2018-09-21 中冶宝钢技术服务有限公司 Revolving furnace sublance lifting device and its handling method
CN109368485A (en) * 2018-11-29 2019-02-22 岑加昌 A kind of environmental project trees balance type lifting device
CN110077948A (en) * 2019-05-14 2019-08-02 上海外高桥造船有限公司 The hanging method of the module stool of lifting device and FPSO
CN110203812A (en) * 2019-06-14 2019-09-06 上海外高桥造船有限公司 Lift the lifting localization method of positioning tool and module stool
CN111056419A (en) * 2019-12-16 2020-04-24 上海市机械施工集团有限公司 Sleeve clamp for hoisting and hoisting method of component
CN112224262A (en) * 2020-10-28 2021-01-15 合肥湖滨物业管理有限公司 Stone ball fixed-point carrying equipment based on building roadblock
CN112744694A (en) * 2020-12-28 2021-05-04 嘉兴市恒光电力建设有限责任公司 Main transformer insulation sleeve hoisting clamp with adjustable angle
TWI745576B (en) * 2017-04-21 2021-11-11 奧地利商佩瓦格奧地利有限公司 Suspension ring for multistrand lifting tackle
CN114135546A (en) * 2021-11-29 2022-03-04 沪东中华造船(集团)有限公司 Adjustable hoop device for ship and using method thereof

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103640961A (en) * 2013-11-25 2014-03-19 湖州市妙西镇资产经营有限公司 Steel aluminum belt hoisting and clamping device
CN103663128A (en) * 2013-12-24 2014-03-26 天威保变(秦皇岛)变压器有限公司 Hoisting method for transformer bushing
CN104003322A (en) * 2014-04-28 2014-08-27 国家电网公司 Open-close pipe shaft lifting tackle
TWI745576B (en) * 2017-04-21 2021-11-11 奧地利商佩瓦格奧地利有限公司 Suspension ring for multistrand lifting tackle
CN107826969A (en) * 2017-10-19 2018-03-23 成都科盛石油科技有限公司 Suitable for the clamp system of pipeline transportation
CN107610882A (en) * 2017-10-31 2018-01-19 南方电网科学研究院有限责任公司 Raise the transformer that seat is reinforced
CN108341328A (en) * 2018-02-02 2018-07-31 浙江大学 A kind of adjustable lifting anchor ear device of diameter
CN108557638B (en) * 2018-05-15 2019-10-22 中冶宝钢技术服务有限公司 Revolving furnace sublance lifting device and its handling method
CN108557638A (en) * 2018-05-15 2018-09-21 中冶宝钢技术服务有限公司 Revolving furnace sublance lifting device and its handling method
CN109368485A (en) * 2018-11-29 2019-02-22 岑加昌 A kind of environmental project trees balance type lifting device
CN110077948A (en) * 2019-05-14 2019-08-02 上海外高桥造船有限公司 The hanging method of the module stool of lifting device and FPSO
CN110203812A (en) * 2019-06-14 2019-09-06 上海外高桥造船有限公司 Lift the lifting localization method of positioning tool and module stool
CN111056419A (en) * 2019-12-16 2020-04-24 上海市机械施工集团有限公司 Sleeve clamp for hoisting and hoisting method of component
CN112224262A (en) * 2020-10-28 2021-01-15 合肥湖滨物业管理有限公司 Stone ball fixed-point carrying equipment based on building roadblock
CN112224262B (en) * 2020-10-28 2024-04-02 合肥湖滨物业管理有限公司 Stone ball fixed-point carrying equipment based on building roadblock
CN112744694A (en) * 2020-12-28 2021-05-04 嘉兴市恒光电力建设有限责任公司 Main transformer insulation sleeve hoisting clamp with adjustable angle
CN112744694B (en) * 2020-12-28 2023-02-10 嘉兴市恒光电力建设有限责任公司 Main transformer insulation sleeve hoisting clamp with adjustable angle
CN114135546A (en) * 2021-11-29 2022-03-04 沪东中华造船(集团)有限公司 Adjustable hoop device for ship and using method thereof

Similar Documents

Publication Publication Date Title
CN202897823U (en) Special hanger for disassembly and assembly of main transformer sleeve
CN201616633U (en) Busbar bridge lifting appliance
CN203967479U (en) Hook type earth connection
CN205159079U (en) Outdoor voltage transformer mounting structure for column switch
CN103332608B (en) GW6 disconnecting link porcelain knob is changed special pole and is hung
CN201868790U (en) Insulating gap bridge for repairing power lines
CN205011290U (en) Wire rope electric block's top mounted putting of scour protection
CN203284094U (en) Rod hanger special for GW6 knife switch porcelain column replacement
CN203277205U (en) High-voltage outdoor intelligent demarcation vacuum circuit breaker
CN204252614U (en) High voltage iron tower inner support Telescopic contracted-pole
CN201850815U (en) Roller anti-friction device used for telescopic tower
CN209306856U (en) Small-sized separation type electrical hoisting apparatus
CN202282594U (en) Insulator fixing suspension clamp
CN208953601U (en) One kind changing interim wire clamp when ammeter
CN208507988U (en) A kind of Extensible ground bar
CN208561425U (en) A kind of anti-rotational durable wirerope hook
CN205231614U (en) Wire fixing frame can fold up
CN202906253U (en) Device capable of preventing twisting and knotting of high-voltage lead wire in lifting process of cable-penetrated bush
CN205294510U (en) Novel multi -functional earth connection winding frame
CN206099243U (en) A tension is from lock transmission cable hanger for transmission line
CN204118597U (en) A kind of line lifter for distribution line
CN203983534U (en) Transmission pressure ground loop
CN102570325A (en) Light hoisting device for converting station
CN205231613U (en) Telescopic wire fixing frame
CN205173916U (en) Mounting structure of transformer substation monitoring camera convenient to overhaul

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20141007

EXPY Termination of patent right or utility model