CN202896851U - Combined scaffold during ship body segmental manufacturing - Google Patents
Combined scaffold during ship body segmental manufacturing Download PDFInfo
- Publication number
- CN202896851U CN202896851U CN 201220548498 CN201220548498U CN202896851U CN 202896851 U CN202896851 U CN 202896851U CN 201220548498 CN201220548498 CN 201220548498 CN 201220548498 U CN201220548498 U CN 201220548498U CN 202896851 U CN202896851 U CN 202896851U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- ship body
- construction
- combined
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to a combined scaffold during ship body segmental manufacturing. The combined scaffold is characterized by comprising a bottom edge base rod (1) fixed at the segmental edge of a ship body, wherein a plurality of vertical rods (2) are perpendicularly arranged on the base surface of the scaffold formed by the bottom edge base rod (1) and are connected with one another through transverse rods (3). A large area of scaffold is not required, so that the using amount of materials is small; quick construction can be realized; segmentation and construction can be transferred at the same time; repeated construction of the scaffold is avoided; and the construction cost is saved.
Description
Technical field
The utility model relates to the combined scaffold during a kind of body section is made.Belong to and build the ship technical field.
Background technology
Shipyard disposes and the ship building convention routinely, around during boat segmental is made, need setting up around segmentation, the scaffold of layering, constructability, and the safety of assurance construction, the general ground that is located in the workyard and the independent scaffold that separates with building segmentation of adopting, when segmentation turns next station and zone construction, need original scaffold dismounting is built again.The scaffold materials that cause so whole camp site to be set up are more, easy care not, and increased construction cost.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, and the combined scaffold during a kind of body section is built is provided, and this type scaffold and segmentation are combined into one, can with segmentation one order that runs up, and simple in structure, materials are few, greatly reducing construction cost.
The purpose of this utility model is achieved in that the combined scaffold during a kind of body section is built, it comprises the base scaffold base bar (scaffold base bar is connected with the segmentation base with binding bolt by the draw-in groove of head) that is fixed in the body section edge, the basal plane that forms at described base scaffold base bar is vertically installed with a plurality of vertical rods, interconnect by cross bar between described a plurality of vertical rod, form each layer construction surface and the escape way that are suitable for constructing.
Compared with prior art, the beneficial effects of the utility model are:
The utility model does not need large-area scaffolding erecting, and materials are few, can realize fast construction, and can with segmentation one order that runs up, avoided scaffold repeat set up, saved construction cost.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Wherein:
Draw-in groove 2
The specific embodiment
Referring to Fig. 1, the utility model relates to the combined scaffold during a kind of body section is built, it comprises base base bar 1, one end of described base substrate 1 arranges draw-in groove 2, by binding bolt draw-in groove 2 is fixed in the body section edge, the scaffold basal plane that forms at described base base bar 1 is vertically installed with a plurality of vertical rods 3, interconnects by cross bar 4 between described a plurality of vertical rods 3.
Claims (1)
1. the combined scaffold during a body section is built, it is characterized in that it comprises the base base bar (1) that is fixed in the body section edge, the scaffold basal plane that forms at described base base bar (1) is vertically installed with a plurality of vertical rods (3), interconnects by cross bar (4) between described a plurality of vertical rods (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220548498 CN202896851U (en) | 2012-10-25 | 2012-10-25 | Combined scaffold during ship body segmental manufacturing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220548498 CN202896851U (en) | 2012-10-25 | 2012-10-25 | Combined scaffold during ship body segmental manufacturing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202896851U true CN202896851U (en) | 2013-04-24 |
Family
ID=48117551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220548498 Expired - Fee Related CN202896851U (en) | 2012-10-25 | 2012-10-25 | Combined scaffold during ship body segmental manufacturing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202896851U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319040A (en) * | 2018-10-10 | 2019-02-12 | 上海江南长兴造船有限责任公司 | A kind of scaffold building method for hull turn of the bilge region |
CN110053735A (en) * | 2019-03-15 | 2019-07-26 | 沪东中华造船(集团)有限公司 | A kind of scaffold building method for Large LNG bilge portion ballast tank region |
-
2012
- 2012-10-25 CN CN 201220548498 patent/CN202896851U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319040A (en) * | 2018-10-10 | 2019-02-12 | 上海江南长兴造船有限责任公司 | A kind of scaffold building method for hull turn of the bilge region |
CN110053735A (en) * | 2019-03-15 | 2019-07-26 | 沪东中华造船(集团)有限公司 | A kind of scaffold building method for Large LNG bilge portion ballast tank region |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204139457U (en) | A kind of punching block shell beam | |
CN202896851U (en) | Combined scaffold during ship body segmental manufacturing | |
CN201835440U (en) | Anti-deformation concrete steel pipe column | |
CN104328908A (en) | Deformation joint double-layer shear wall formwork structure and method of using formwork structure to construct double-layer shear wall | |
CN202139603U (en) | Storage-type tower crane foundation | |
CN203639900U (en) | Hollow pile | |
CN103508339B (en) | Mobile tower flap seat | |
CN204898708U (en) | Assembled steel construction conversion layer of tower crane | |
CN203461734U (en) | Mobile tower crane base | |
CN105569326A (en) | Handling frame without support and exterior wall construction method thereof | |
CN103790107A (en) | Steel-and-wood combination type sand barrel temporary support | |
CN204491840U (en) | A kind of being convenient to is installed and the space frame formula self-contained flat be connected | |
CN204510768U (en) | A kind of without support operation frame | |
CN204510258U (en) | A kind of reinforced bar net layered rolling retaining wall structure | |
CN203967657U (en) | A kind of novel ventilated crane span structure | |
CN203129574U (en) | Novel hollow plastic building template | |
CN204491507U (en) | A kind of hydraulic engineering template | |
CN203022363U (en) | Fast-connection protective net | |
CN204282920U (en) | A kind of communication tower being furnished with spliced pedestal | |
CN203831571U (en) | Multipurpose pre-stressed tension plate | |
CN103628669A (en) | Light and large steel formwork | |
CN103485536B (en) | Shear wall large template ruggedized construction | |
CN203514338U (en) | Tower crane foundation | |
CN203160265U (en) | Multipurpose type movable tower crane foundation | |
CN202324359U (en) | High-strength reinforcing steel bar cushion block used for reinforced concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130424 Termination date: 20151025 |
|
EXPY | Termination of patent right or utility model |