CN202881809U - Asphalt remixer - Google Patents

Asphalt remixer Download PDF

Info

Publication number
CN202881809U
CN202881809U CN 201220534979 CN201220534979U CN202881809U CN 202881809 U CN202881809 U CN 202881809U CN 201220534979 CN201220534979 CN 201220534979 CN 201220534979 U CN201220534979 U CN 201220534979U CN 202881809 U CN202881809 U CN 202881809U
Authority
CN
China
Prior art keywords
conveyer
hopper
asphalt
mixer
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220534979
Other languages
Chinese (zh)
Inventor
周平
陆东君
周华为
汪大为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Xitong Engineering Machinery Co Ltd
Original Assignee
Wuxi Xitong Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Xitong Engineering Machinery Co Ltd filed Critical Wuxi Xitong Engineering Machinery Co Ltd
Priority to CN 201220534979 priority Critical patent/CN202881809U/en
Application granted granted Critical
Publication of CN202881809U publication Critical patent/CN202881809U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model relates to an asphalt remixer which is particularly used for mixing and stirring new asphalt and old asphalt. The asphalt remixer comprises an old asphalt lifting conveyer, a new asphalt mixing bunker, a new asphalt hopper conveyer, a solid material bunker, a liquid material bunker, a buffer hopper, a stirrer, a hot air circulating device, a rear conveyer and a remixer body, wherein the rear end of the remixer body is rotatably connected with the old asphalt lifting conveyer. The rear end of the old asphalt lifting conveyer is connected with the buffer hopper, and the buffer hopper is fixed on the stirrer. The new asphalt mixing bunker is fixed on the remixer body, and the new asphalt hopper conveyer is arranged at the lower part of the new material mixing bunker. The stirrer is fixed on the lower end of the middle of the remixer body, and the hot air circulating device is fixed above the stirrer, and the rear conveyer is connected to the rear end of the stirrer. The asphalt remixer has a simple, compact and reasonable structure, and has the advantages that the heat loss is greatly reduced, the efficiency is increased, and the asphalt materials are more fully and uniformly heated and stirred, thereby forming a new mixture with high uniformity and stable temperature.

Description

Pitch remixing locomotive
Technical field
The utility model relates to a kind of pitch remixing locomotive, specifically is used for the mix and blend of new and old asphalt material.
Background technology
Flexible pavement inevitably can produce the defectives such as rut, depression after long-term the use, these defectives will further be accelerated pavement damage, affect traffic safety.The in-situ heat regeneration method is a kind of flexible pavement restorative procedure of latest development, and its specific embodiment is as follows: at first preheat depositing defective flexible pavement.Because pitch thawings of being heated, itself and the adhesion decline of aggregate are when this road surface is heated to uniform temperature, after namely reaching the road surface and softening, again by in addition milling of milling equipment.Can under less milling active force make flexible pavement by original shakeout compaction state be transformed into loose stacking states, and can not destroy wherein aggregate because softening road surface can not produce excessive resistance to milling and plane operation this moment.Thereby the old asphalt mixture that milling goes out do not change its grating, still can reuse.But old asphalt mixture still needs it is added new pitch because having the material loss in inevitable ageing of asphalt, the mechanism process and improving the factor such as former road surface grating, regenerative agent, the materials such as new bituminous mixture.When adding new material, still need old asphalt mixture through again heating of row, after further stirring at a certain temperature, by the pressing that paves of the equipment such as paver, form qualified new road surface again.
In actual use, the new pavement quality that adopts the method to repair is stable not, sometimes even do not reach acceptance requirement.Its reason is: existing technique be use some preheating locomotives with road-surface heating to uniform temperature, dig the road surface by the milling machine turnning and milling of closelying follow, milling forms the old asphalt mixture of loose depos-its.After this, because the remixing stage need to add new bituminous mixture, new bituminous mixture needs to deliver and unload to the hopper of remixing Che Yiduan by being in the middle tipping truck of milling locomotive and remixing locomotive, and is delivered on the old asphalt mixture according to quantity by the conveyer in the hopper.This just makes the milling machine vehicle tail end separate suitable length one segment distance before the remixing locomotive promotes stirring, and in this segment distance, old asphalt mixture is exposed in the cold air, and can not get heating.So in old process program, before remixer promotes stirring, set up a heater with heat compensation loss and further heating old asphalt mixture, and for improving the efficiency of heating surface, spiral was set before heater divides device and divide old asphalt mixture to increase heating surface (area) (HS.Though such scheme can make the temperature of old asphalt mixture obtain certain raising, but because milling machine vehicle tail end to remixing locomotive heater front end still has one section very long distance, and locomotive driving speed needs very slow during because of operation, this just makes this section old asphalt mixture be exposed to for a long time and lets alone heat radiation in the cold air, can not get heating.If at windy area, meet the construction of strong wind weather or autumn and winter season, because the expansion of the temperature difference and the reinforcement of convection action, material a large amount of heat that scatters and disappears will be made.This just makes the heater of back that very large heating power need to be provided, and one expends a large amount of fuel, and is economical not; Two also make heater excessive long, make mobility, the trafficability characteristic variation of car load.Old asphalt mixture is divided into certain thickness usually, heater is to its limited time that heats again, and old asphalt mixture exists heat conduction bad, the unfavorable factors such as rapid heat dissipation, thereby the heat that heater is produced is limited to the mixed material heating effect, the material on top layer is fully heated, and the temperature gradient of through-thickness is larger, cause different-thickness place material to be in different character and state, be unfavorable for the follow-up operation that mixes, and and then affect the final mass of green road surface.And during the remixing stepwise heating, old asphalt mixture is still and is in the semi-open environment, needs further to improve heating power.And simple dependence increases the method that heat is supplied with, and not only will increase greatly cost, and tend to make the top layer material to burn, and the uneven phenomenon of being heated still exists.Long bringing-up section, making the remixing locomotive is to satisfy certain mobility and trafficability characteristic to have to shorten the length that stirs section, it is even not that this just makes compound stir, and affects the green road surface quality.Therefore, the old asphalt mixture after the milling machine turnning and milling is dug is heated fully and is stirred when the remixing stage is being added necessary new material, and making certain quality requirement that reaches that green road surface can be stable is a major issue.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point, thereby provide a kind of pitch remixing locomotive, can make the heating of new and old asphaltene and stir more abundant and even, thereby form the new compound mix with temperature stabilization, guaranteed the quality requirement that reaches that the road surface of new formation can be stable.
The technical scheme that provides according to the utility model, a kind of pitch remixing locomotive comprises old material elevating conveyor, virgin material mixing bunker, virgin material hopper conveyer, solid material feed bin, liquid material feed bin, buffering hopper, mixer, heated air circulation device, rear portion conveyer and car body, it is characterized in that: the car body rear end is rotationally connected old material elevating conveyor, old material elevating conveyor both sides connect the hydraulic pressure strut, and hydraulic pressure strut upper end is fixed on the car body.Described old material elevating conveyor rear end connects the buffering hopper, and the buffering hopper is fixed on the mixer.The virgin material mixing bunker is fixed on the car body, other solid material feed bin and the liquid material feed bin of connecting of virgin material mixing bunker.Described virgin material mixing bunker bottom is provided with virgin material hopper conveyer.Mixer is fixed on lower end, car body middle part, and the mixer top is heated air circulation device fixedly.Described mixer rear end connects the rear portion conveyer.
Described old material elevating conveyor, virgin material mixing bunker, virgin material hopper conveyer, buffering hopper, mixer, heated air circulation device, rear portion conveyor surface all cover one deck alumina silicate heat-preservation cotton.
Described virgin material mixing bunker rear end is provided with the virgin material bin stopper.
Described virgin material bin stopper is positioned at buffering hopper top.
Described buffering feed hopper bottom is provided with the buffering bunker gate.
Described mixer rear end is provided with the mixer gate.
Compared with the prior art the utility model has the following advantages:
The utility model is simple, compact and reasonable for structure; Asphalt material can not be exposed in the air and dispel the heat, and thermal losses is reduced in a large number, has improved efficient, the cost of saving, more environmental protection and economy; And make the heating of asphaltene and stir more abundant and even, thereby formation mixes the new compound with temperature stabilization, better met the back and paved the stage to the requirement of material, guaranteed the quality requirement that reaches that the road surface of new formation can be stable.
Description of drawings
Fig. 1 is the utility model structural representation.
The old material elevating conveyor of description of reference numerals: 1-, 2-virgin material mixing bunker, 3-virgin material hopper conveyer, 4-virgin material bin stopper, 5-solid material feed bin, 6-liquid material feed bin, 7-buffering hopper, 8-buffering bunker gate, 9-mixer, 10-heated air circulation device, 11-mixer gate, 12-rear portion conveyer, 13-car body, 14-hydraulic pressure strut.
The specific embodiment
Following the utility model is further described in connection with the embodiment in the accompanying drawing:
As shown in Figure 1, the utility model mainly comprises old material elevating conveyor 1, virgin material mixing bunker 2, virgin material hopper conveyer 3, solid material feed bin 5, liquid material feed bin 6, buffering hopper 7, mixer 9, heated air circulation device 10, rear portion conveyer 12 and car body 13.
Car body 13 rear ends are rotationally connected old material elevating conveyor 1, and old material elevating conveyor 1 both sides connect hydraulic pressure strut 14, and hydraulic pressure strut 14 upper ends are fixed on the car body 13.Angle by the old material elevating conveyor 1 of the extension and contraction control of hydraulic pressure strut 14.Described old material elevating conveyor 1 rear end connects buffering hopper 7.
Virgin material mixing bunker 2 is fixed on the car body 13, virgin material mixing bunker 2 other solid material feed bin 5 and the liquid material feed bins 6 of connecting.Described virgin material mixing bunker 2 bottoms are provided with virgin material hopper conveyer 3, and virgin material mixing bunker 2 rear ends are provided with virgin material bin stopper 4.Described virgin material bin stopper 4 is positioned at buffering hopper 7 tops, and buffering hopper 7 is fixed on the mixer 9.Described buffering hopper 7 bottoms are provided with buffering bunker gate 8.
Mixer 9 is fixed on lower end, car body 1 middle part, and mixer 9 tops are heated air circulation device 10 fixedly.Described mixer 9 rear ends connect rear portion conveyer 12.Described mixer 9 rear ends are provided with mixer gate 11.
Described old material elevating conveyor 1, virgin material mixing bunker 2, virgin material hopper conveyer 3, buffering hopper 7, mixer 9, heated air circulation device 10, rear portion conveyer 12 surfaces all cover one deck alumina silicate heat-preservation cotton, further the interchange of heat of isolated and cool exterior air reduces thermal loss.
The course of work of the present utility model is: when work, the old asphalt that the milling machine vehicle tail end digs is transported in the buffering hopper 7 by old material elevating conveyor 1.Be equipped with respectively in solid material feed bin 5 and the liquid material feed bin 6 and produce adding materials of pitch, new asphaltene is housed in the virgin material mixing bunker 2, new asphaltene is transported in the buffering hopper 7 by virgin material hopper conveyer 3.New and old asphalt material in the buffering hopper 7 mixes by mixer 9, heats by 10 pairs of new and old asphalt materials of heated air circulation device when stirring.The bituminous mixture that stirring is finished is transported in the paver hopper of closelying follow later by rear portion conveyer 12.In whole process, asphalt material can not be exposed in the air and dispel the heat, and thermal losses is reduced in a large number, has improved efficient, the cost of saving, more environmental protection and economy; And make the heating of material and stir more abundant and even, thereby formation mixes the new compound with temperature stabilization, better met the back and paved the stage to the requirement of material, guaranteed the quality requirement that reaches that the road surface of new formation can be stable.

Claims (5)

1. pitch remixing locomotive, comprise old material elevating conveyor (1), virgin material mixing bunker (2), virgin material hopper conveyer (3), solid material feed bin (5), liquid material feed bin (6), buffering hopper (7), mixer (9), heated air circulation device (10), rear portion conveyer (12) and car body (13), it is characterized in that: car body (13) rear end is rotationally connected old material elevating conveyor (1), old material elevating conveyor (1) both sides connect hydraulic pressure strut (14), and hydraulic pressure strut (14) upper end is fixed on the car body (13); Described old material elevating conveyor (1) rear end connects buffering hopper (7), and buffering hopper (7) is fixed on the mixer (9); Virgin material mixing bunker (2) is fixed on the car body (13), other solid material feed bin (5) and the liquid material feed bin (6) of connecting of virgin material mixing bunker (2); Described virgin material mixing bunker (2) bottom is provided with virgin material hopper conveyer (3); Mixer (9) is fixed on lower end, car body (1) middle part, and mixer (9) top is heated air circulation device (10) fixedly; Described mixer (9) rear end connects rear portion conveyer (12);
Described old material elevating conveyor (1), virgin material mixing bunker (2), virgin material hopper conveyer (3), buffering hopper (7), mixer (9), heated air circulation device (10), rear portion conveyer (12) surface all cover one deck alumina silicate heat-preservation cotton.
2. a kind of pitch remixing locomotive as claimed in claim 1, it is characterized in that: described virgin material mixing bunker (2) rear end is provided with virgin material bin stopper (4).
3. a kind of pitch remixing locomotive as claimed in claim 2 is characterized in that: described virgin material bin stopper (4) is positioned at buffering hopper (7) top.
4. a kind of pitch remixing locomotive as claimed in claim 1 is characterized in that: be provided with buffering bunker gate (8) bottom the described buffering hopper (7).
5. a kind of pitch remixing locomotive as claimed in claim 1, it is characterized in that: described mixer (9) rear end is provided with mixer gate (11).
CN 201220534979 2012-10-18 2012-10-18 Asphalt remixer Expired - Fee Related CN202881809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220534979 CN202881809U (en) 2012-10-18 2012-10-18 Asphalt remixer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220534979 CN202881809U (en) 2012-10-18 2012-10-18 Asphalt remixer

Publications (1)

Publication Number Publication Date
CN202881809U true CN202881809U (en) 2013-04-17

Family

ID=48073250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220534979 Expired - Fee Related CN202881809U (en) 2012-10-18 2012-10-18 Asphalt remixer

Country Status (1)

Country Link
CN (1) CN202881809U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864719A (en) * 2012-10-18 2013-01-09 无锡锡通工程机械有限公司 Asphalt remixing locomotive
CN105155391A (en) * 2015-09-30 2015-12-16 无锡锡通工程机械有限公司 Hot-air layered secondary heating locomotive for pavement heat regeneration

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864719A (en) * 2012-10-18 2013-01-09 无锡锡通工程机械有限公司 Asphalt remixing locomotive
CN102864719B (en) * 2012-10-18 2015-05-06 无锡锡通工程机械有限公司 Asphalt remixing locomotive
CN105155391A (en) * 2015-09-30 2015-12-16 无锡锡通工程机械有限公司 Hot-air layered secondary heating locomotive for pavement heat regeneration
CN105155391B (en) * 2015-09-30 2017-09-26 无锡锡通工程机械有限公司 Hot blast for road surface hot recycling is layered reheating locomotive

Similar Documents

Publication Publication Date Title
CN102864719B (en) Asphalt remixing locomotive
CN108221560B (en) Construction process of rubber powder modified asphalt pavement
CN103590296B (en) Sheet pavement in-situ heat regeneration remixing overlays technique
CN105155391B (en) Hot blast for road surface hot recycling is layered reheating locomotive
CN106223179A (en) Road surface hot recycling machine and road surface hot reproduction construction method
CN104499406A (en) Hot wind layered heating type re-stirring locomotive
CN103145376B (en) Crumb rubber powder composited regenerated all-weather road cold-patch material and production method thereof
CN102660917A (en) Heat insulation recycling transport vehicle for hot air circulation asphalt mixture
CN204282163U (en) A kind of flexible pavement layering hot recycling machine
CN107254828A (en) A kind of complete unit of microwave in-situ heat regeneration and its construction technology
CN202881809U (en) Asphalt remixer
CN101560747A (en) Asphalt-regenerating mixture heating transport vehicle
CN201873934U (en) Trail car type microwave maintenance truck for asphalt pavement
CN205012203U (en) Be used for palingenetic hot -blast layering secondary heating locomotive of road surface heat
CN201180251Y (en) Sheet pavement heating apparatus for thermal regeneration vehicle for heating sheet pavement on site
CN207130588U (en) A kind of complete unit of microwave in-situ heat regeneration
CN202730595U (en) Hot air circulating type asphalt mixture heat-preservation and recycling transport vehicle
CN202688825U (en) Bituminous mixture blending device
CN201671044U (en) Roller-bunker type of vehicle for on-site heating and recycling of asphalt layer of pavement
CN108117305A (en) Reclaimed rubber asphalt and preparation method thereof
CN101255675A (en) Sheet pavement in-situ heat regeneration vehicle
CN113564983A (en) Microwave thermal regeneration asphalt mixing station capable of infinitely adjusting mixing ratio of new and old materials
CN201530982U (en) Bituminous mixture lifting remixer with two-stage double-shaft blunger
CN205934661U (en) Bituminous paving promotes remix paver
CN203625779U (en) Intelligent spreading equipment of high polymer asphalt base water-proof binding material

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20151018

EXPY Termination of patent right or utility model