CN202868083U - Elastic displacement compensator - Google Patents

Elastic displacement compensator Download PDF

Info

Publication number
CN202868083U
CN202868083U CN 201220499984 CN201220499984U CN202868083U CN 202868083 U CN202868083 U CN 202868083U CN 201220499984 CN201220499984 CN 201220499984 CN 201220499984 U CN201220499984 U CN 201220499984U CN 202868083 U CN202868083 U CN 202868083U
Authority
CN
China
Prior art keywords
sleeve pipe
sleeve
pipeline
elastic displacement
displacement compensator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220499984
Other languages
Chinese (zh)
Inventor
詹春生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220499984 priority Critical patent/CN202868083U/en
Application granted granted Critical
Publication of CN202868083U publication Critical patent/CN202868083U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an elastic displacement compensator which comprises a sleeve provided with a cylindrical cavity, and the sleeve is made of elastic and soft materials. Rigidity reinforced rings or spiral rigidity reinforced ribs which are coaxial with the sleeve are arranged in the sleeve. After soil is backfilled and a pavement is smoothed, the condition of inconsistent sedimentation happens to backfill of an inspection well and the periphery of the inspection well after a heavy object passes through the top of the inspection well, namely, the size of sedimentation of the backfill and a pipeline is larger than that of the inspection well. Due to the fact that the sleeve is made of the elastic materials, the sleeve plays a good role in buffering and displacement compensation, and greatly reduces the condition of stress concentration. After the heavy object passes, the pipeline is recovered under the action of springback, so the elastic displacement compensator is prevented from being damaged when the heavy object passes.

Description

The elastic displacement compensator
Technical field
The utility model belongs to the pipe laying technical field, relates in particular to a kind of elastic displacement compensator.
Background technique
In the road construction process, need to carry out under ground piping lays and the inspection shaft construction operation, offer the preformed hole in poling road on the borehole wall of inspection shaft, the junction of the pipeline outer wall that lays and borehole wall preformed hole is for being rigidly connected, when crossing heavy-load automobile, the inconsistent situation of sedimentation will appear in inspection shaft and backfill all around thereof, be that the sedimentation of backfill and pipeline is greater than inspection shaft sedimentation size, the borehole wall junction of pipeline outer wall and inspection shaft exists stress to concentrate, easier of breaking for plastic pipe especially, thus the generation of water leakage phenomenon caused.This phenomenon is more serious when the backfill operation is lack of standardization, therefore, needs the solution the above-mentioned problems in the prior art badly.
The model utility content
The utility model is in order to solve deficiency of the prior art, and a kind of elastic displacement compensator of the borehole wall junction stress of pipeline outer wall and inspection shaft when effectively reducing heavy duty is provided.
For solving the problems of the technologies described above, the utility model adopts following technological scheme: the elastic displacement compensator, comprise the sleeve pipe with cylindrical cavity, sleeve pipe is made by playing flexible material, is provided with rigidity stiffening ring or spirality rigidity stiffening rib with the sleeve pipe coaxial line in the sleeve pipe.
Described internal surface of sleeve pipe is provided with at least one inner seal ring.
Described sleeve pipe outer ring is provided with only oozes at least together groove and/or evagination and only oozes seal ring.
It is radial that described sleeve pipe one end outer wall lower semi-circle outwards is loudspeaker, and it is radial that sleeve pipe the other end inwall upper semi-circle outwards is loudspeaker.
The truncation surface of described inner seal ring is isosceles acute triangle.
Adopt technique scheme, carrying out under ground piping when laying with the inspection shaft construction operation, first sleeve pipe is enclosed within on the pipeline by the direction outside inspection shaft in the inspection shaft, again pipeline is placed into specified position and builds inspection shaft by laying bricks or stones, rigidity stiffening ring or spirality rigidity stiffening rib play the ring stiffness of reinforcing sleeve and prevent because of the outer excessive deformation that carries.And then pipeline is penetrated into again in the cylindrical cavity of sleeve pipe, when pipeline is bellows, inner seal ring arranges a plurality of, on the excircle of bellows ripple with all or part inner seal ring wherein be sealed and matched, when pipeline external surface is smooth, pipeline and inner seal ring seal, and only ooze groove and evagination and only ooze seal ring and be fixed as one by pouring mortar and Well-wall sealer, only ooze groove and/or evagination and only ooze seal ring and play further anti-sealing along the mobile effect of sleeve outer wall.Backfill and trim the road surface after, when heavy duty is arranged through manhole top, the inconsistent situation of sedimentation will appear in inspection shaft and backfill all around thereof, i.e. the sedimentation of backfill and pipeline is greater than inspection shaft sedimentation size, but since sleeve pipe made by elastic material, sleeve pipe radially plays good buffering and the effect of bit shift compensation, and eliminated the situation that stress is concentrated, after heavy duty, under the rebound effect of sleeve pipe, pipeline can restore to the original state, thus impaired situation when avoiding heavy duty.The disconnected cross section of inner seal ring is set to isosceles acute triangle, make simultaneously the internal diameter of sleeve pipe greater than outer diameter tube, the internal diameter of inner seal ring is less than outer diameter tube, this facilitates construction and installation, and sleeve pipe is enclosed within on the pipeline by direction outside in the inspection shaft, inner seal ring can tilt fit tightly on pipeline outer wall to inspection shaft is inboard, and hydraulic pressure is larger in the inspection shaft fits closelyr.In addition, the disconnected cross section of inner seal ring is set to isosceles acute triangle, can guarantee that buried pipeline is not subjected to the restriction of inspection shaft body of wall, can be with the variation free-extension of ambient temperature, thereby eliminated the inspection shaft body of wall and suffered cracking destruction because of the axial stretching of pipeline, avoided the road collapsion that therefore causes.
Description of drawings
Fig. 1 is the utility model embodiment one structural representation;
Fig. 2 is the utility model embodiment two structural representation;
Fig. 3 is the utility model embodiment three structural representation.
Embodiment
Embodiment one: as shown in Figure 1, elastic displacement compensator of the present utility model comprises the sleeve pipe 2 with cylindrical cavity 1, and sleeve pipe 2 is made by playing flexible material, is provided with several rigidity stiffening rings 3 with sleeve pipe 2 coaxial lines in the sleeve pipe 2.Sleeve pipe 2 inwalls are provided with at least one inner seal ring 5.Sleeve pipe 2 outer rings are provided with only oozes at least together groove 6 and/or evagination and only oozes seal ring 7.Inner seal ring 5 arranges three roads in the present embodiment, wherein is located at together the outermost of sleeve pipe 2 and inspection shaft; Only ooze groove 6 and be provided with twice.The truncation surface of inner seal ring 5 is isosceles acute triangle.
Carrying out under ground piping when laying with the inspection shaft construction operation, sleeve pipe 2 is preset in the pipeline specified position that is installed in the inspection shaft borehole wall or the preformed hole that is installed in the borehole wall, and then pipeline is penetrated into again in the cylindrical cavity 1 of sleeve pipe 2, when pipeline is bellows, ripple and inner seal ring 5 are sealed and matched on the excircle of bellows, when pipeline external surface was smooth, pipeline and inner seal ring 5 sealed, and only oozed groove 6 and/or evagination and only oozed seal ring 7 and be fixed as one by pouring mortar and Well-wall sealer.Backfill and trim the road surface after, when heavy duty is arranged through manhole top, the inconsistent situation of sedimentation will appear in inspection shaft and backfill all around thereof, i.e. the sedimentation of backfill and pipeline is greater than inspection shaft sedimentation size, but since sleeve pipe 2 made by elastic material, sleeve pipe 2 plays good buffering and the effect of bit shift compensation, and greatly reduce the situation that stress is concentrated, after heavy duty, under the elastic reaction of sleeve pipe 2, pipeline can restore to the original state, thus impaired situation when avoiding heavy duty.
Embodiment two: as shown in Figure 2, be with embodiment one difference, be provided with a spirality rigidity stiffening rib 4 with sleeve pipe 2 coaxial lines in the sleeve pipe 2.
Embodiment three: as shown in Figure 3, be with embodiment one difference, it is radial that sleeve pipe 2 one end outer wall lower semi-circle outwards are loudspeaker, this place provides larger lower row space for pipeline, and make the stressed cross section of pipeline be extended to maximum, and it is larger to be out of shape larger stress surface, thereby reduces the effect of pressure; It is radial that inwall upper semi-circle outside, sleeve pipe 2 the other end is loudspeaker, and for an end of the inspection shaft inboard of pipeline provides freely displacement space, thereby the top of avoiding pipeline is because of to the stressed problem of top offset.

Claims (5)

1. elastic displacement compensator is characterized in that: comprise the sleeve pipe with cylindrical cavity, sleeve pipe is made by playing flexible material, is provided with rigidity stiffening ring or spirality rigidity stiffening rib with the sleeve pipe coaxial line in the sleeve pipe.
2. elastic displacement compensator according to claim 1, it is characterized in that: described internal surface of sleeve pipe is provided with at least one inner seal ring.
3. elastic displacement compensator according to claim 1 and 2 is characterized in that: described sleeve pipe outer ring is provided with only oozes at least together groove and/or evagination and only oozes seal ring.
4. elastic displacement compensator according to claim 1 and 2, it is characterized in that: it is radial that described sleeve pipe one end outer wall lower semi-circle outwards is loudspeaker, and it is radial that sleeve pipe the other end inwall upper semi-circle outwards is loudspeaker.
5. elastic displacement compensator according to claim 3, it is characterized in that: the truncation surface of described inner seal ring is isosceles acute triangle.
CN 201220499984 2012-09-28 2012-09-28 Elastic displacement compensator Expired - Fee Related CN202868083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220499984 CN202868083U (en) 2012-09-28 2012-09-28 Elastic displacement compensator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220499984 CN202868083U (en) 2012-09-28 2012-09-28 Elastic displacement compensator

Publications (1)

Publication Number Publication Date
CN202868083U true CN202868083U (en) 2013-04-10

Family

ID=48034803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220499984 Expired - Fee Related CN202868083U (en) 2012-09-28 2012-09-28 Elastic displacement compensator

Country Status (1)

Country Link
CN (1) CN202868083U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102840390A (en) * 2012-09-28 2012-12-26 詹春生 Elastic displacement compensator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102840390A (en) * 2012-09-28 2012-12-26 詹春生 Elastic displacement compensator
CN102840390B (en) * 2012-09-28 2015-07-29 詹春生 Elastic displacement compensator

Similar Documents

Publication Publication Date Title
CN102840390B (en) Elastic displacement compensator
CN205205875U (en) Underground continuous wall rubber tape water joint case
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN204343330U (en) A kind of plastic drain-pipe and manhole sealing and connecting device
CN202868083U (en) Elastic displacement compensator
CN201605599U (en) Integrated prefabricated inspection well
CN203286163U (en) Combined concrete pipe with lining pipe
CN204962055U (en) Dual protection drain pipe
CN104089103A (en) Circulating water pipe lined with glass steel pipe and glass steel pipe lined method thereof
CN105065774B (en) A kind of underground piping branch connects construction method
CN103775748B (en) Inspection shaft piping displacement elastic compensator
CN104452816A (en) High-stiffness leakage-proof plastic inspection well and production method thereof
CN202733197U (en) Pipeline displacement compensator
CN206419680U (en) A kind of natural-gas transfer pipeline monitoring device
CN204510207U (en) Become the substrate of water level deep-water slope to bury underground with flexible casing
CN102818075B (en) Pipeline displacement compensator
CN201258492Y (en) Barrel type underground structure device for underground garage
CN211666735U (en) Existing subway tunnel structure is consolidated in slip casting pipe interpolation shaped steel slip casting
CN202175955U (en) Retaining ring assembly for road inspection well and steel supporting ring applied in installation thereof
CN202109142U (en) Novel pipeline telescopic joint
CN101311596B (en) Steel faucet concrete push pipe
CN203668938U (en) Post grouting side wall grouting and guniting annular valve structure
CN201028154Y (en) Steel faucet concrete top pipe
CN102561396A (en) Plastic inspection well and manufacturing method thereof
CN207486263U (en) A kind of concrete bell-and-spigot pipe of mud jacking sealing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130410

Termination date: 20170928