CN202866696U - Block-clearing device - Google Patents
Block-clearing device Download PDFInfo
- Publication number
- CN202866696U CN202866696U CN 201220544831 CN201220544831U CN202866696U CN 202866696 U CN202866696 U CN 202866696U CN 201220544831 CN201220544831 CN 201220544831 CN 201220544831 U CN201220544831 U CN 201220544831U CN 202866696 U CN202866696 U CN 202866696U
- Authority
- CN
- China
- Prior art keywords
- port
- pressure
- clearing
- block
- blockage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Prevention Of Electric Corrosion (AREA)
Abstract
The utility model provides a block-clearing device which comprises a block-clearing assembly and a slag removing device. The block-clearing assembly comprises a straight pipe and a high-pressure pipe. One end of the high-pressure pipe extends into the straight pipe and located at the first end of the straight pipe, and the other end of the high-pressure pipe is used for being communicated with a high-pressure pipeline. The slag removing device comprises a three-way pipe provided with a first end opening, a second end opening and a third end opening. The first end opening is used for being communicated with a drawing and collecting pipeline. The second end opening is communicated with the second end of the straight pipe. The third end opening is provided with a control valve used for controlling opening or closing of the third end opening. The block-clearing device can be used for solving blocking problems of drilling holes, is fast, convenient and safe, and avoids injury by spraying holes and gas accidents due to improper block-clearing ways of the drilling holes or pressure building inside the holes.
Description
Technical field
The utility model relates to mechanical technique, relates in particular to a kind of blockage-clearing device.
Background technology
Coal and Gas Outburst are one of natural calamities serious in the seam mining process, are a kind of complexity that occurs under the coal mine and the dynamic phenomenon that coal, rock and gas participation are arranged, and have sudden, destructive and catastrophic characteristics.Coal and Gas Outburst not only constitute a serious threat to miner's personal safety and equipment property safety, but also have greatly limited the productivity in colliery.
The increase of coal seam buried depth makes that the mine geostatic stress increases, gas pressure and gas bearing capacity increase, and causes coal and Gas Outburst problem day by day serious and complicated, the difficulty of prevention and cure of having aggravated coal and Gas Outburst.The main effective means of administering at present coal and Gas Outburst has ventilation wind row, the extraction of upper corner pipe laying, construction height to take out lane extraction, construction roof and floor hole pumping and mining and construction concordant hole pumping and mining, wherein, construction roof and floor hole pumping and mining is widely used owing to effective.But, behind drilling construction, because after the Completion of Drilling Hole, coal seam or Rock character drill hole be soft, be rich in the factor such as water, tend to cause boring in the hole that occurs collapsing behind the pore-forming and during the extraction, the coal petrography powder stops up boring, thereby has affected extracting result.Simultaneously, coal petrography powder, water, gas gather under the effect at long-term pressure, and spray orifice easily occurs, and cause and hurt sb.'s feelings or gas increment accident.
For improving the hole pumping and mining effect, stopping to build the pressure in or the hole improper because of boring obstruction manner of cleaning up causes spray orifice to hurt sb.'s feelings and gas accident, need safe and effective, quickly processing boring blockage problem, but in the prior art, can only be by manually solving the boring blockage problem to the interior mode of leading to hammer drill of boring, efficient is low, and safety is not high.
The utility model content
The utility model provides a kind of blockage-clearing device, is used for solving the blockage problem of boring.
The utility model provides a kind of blockage-clearing device, wherein, comprising:
The block clearing assembly comprises straight tube and high-voltage tube, and an end of described high-voltage tube stretches into described straight tube and is positioned at the first end of described straight tube, and the other end of described high-voltage tube is used for being communicated with pressure duct;
The slagging-off assembly, comprise tee piece, described tee piece has the first port, the second port and the 3rd port, wherein, described the first port is used for and the extraction pipeline connection, described the second port is communicated with the second end of described straight tube, is provided be used to the control valve of controlling described the 3rd port open or closing on described the 3rd port.
Aforesaid blockage-clearing device, preferably:
All be provided with the control gate valve on described the first port and described the second port.
The blockage-clearing device that technique scheme provides, in the course of the work, blockage-clearing device respectively with boring, pressure duct and extraction pipeline connection, so a whole set of blockage-clearing device is in full closeding state, make the water, coal dust and the gas that spray during the block clearing all enter the slagging-off assembly that is under the negative pressure extraction state, can not cause gas to reveal, so can be used for processing the boring blockage problem, and quick, convenient, safety have been avoided building the pressure in or the hole improper because of boring obstruction manner of cleaning up and have been caused spray orifice to hurt sb.'s feelings and gas accident.
Description of drawings
Block clearing assembly connection diagram in the blockage-clearing device that Fig. 1 provides for the utility model embodiment;
Fig. 2 is the structural representation of block clearing assembly among Fig. 1;
Fig. 3 is the structural representation of slagging-off assembly among Fig. 1.
The specific embodiment
Block clearing assembly connection diagram in the blockage-clearing device that Fig. 1 provides for the utility model embodiment, Fig. 2 is the structural representation of block clearing assembly among Fig. 1, Fig. 3 is the structural representation of slagging-off assembly among Fig. 1.
Referring to Fig. 1-Fig. 3, the utility model embodiment provides a kind of blockage-clearing device, wherein, comprises block clearing assembly 1 and slagging-off assembly 2.Block clearing assembly 1 comprises straight tube 11 and high-voltage tube 12, one end 13 of described high-voltage tube 12 stretches into described straight tube 11 and is positioned at the first end 15 of described straight tube 11, in the practical application, first end 15 is communicated with boring 3, and the other end 14 of described high-voltage tube 12 is used for being communicated with pressure duct 4.Slagging-off assembly 2 comprises tee piece 21, described tee piece 21 has the first port 22, the second port 23 and the 3rd port 24, wherein, described the first port 22 is used for being communicated with extraction pipeline 5, described the second port 23 is communicated with the second end 16 of described straight tube 11, is provided with the control valve (scheming not shown) of opening or closing be used to controlling described the 3rd port 24 on described the 3rd port 24.
Herein, straight tube 11 is specifically as follows the short circuit of double headed roller silk, and the specification of short circuit is 2 cun.High-voltage tube 12 is specially snap joint in 4 minutes, and this snap joint one end 13 places in the straight tube 11, is used for penetrating water under high pressure or high-pressure blast, and with the coal petrography powder of dredging boring 3 interior obstructions, the other end 14 of this snap joint is used for connecting mine pressure duct 4.
Referring to Fig. 1, use above-mentioned blockage-clearing device before, the connected mode of blockage-clearing device is as follows: the first end 15 of straight tube 11 is communicated with extraction borehole 3, the second end 16 of straight tube 11 is communicated with the second port 23 of tee piece 21.Then, the first port 22 of tee piece 21 being communicated with extraction pipeline 5, is negative pressure in the extraction pipeline 5.Subsequently, the other end 14 of high-voltage tube 12 is communicated with pressure duct 4, is connected with high-pressure blast or water under high pressure in the pressure duct 4., should be noted that the high-voltage value in the pressure duct 4 should be greater than the negative pressure value in the extraction pipeline 5 herein, such as, the pressure in the pressure duct 4 is 10
7MPa, the pressure in the extraction pipeline 5 is 10
-6MPa is so that high-pressure blast or water under high pressure can successfully be washed the coal petrography powder that stops up in the boring 3 open.
Use the process of above-mentioned blockage-clearing device as follows: at first, by extraction pipeline 5, so that whole blockage-clearing device all is in negative pressure state.Then, wash the coal petrography powder of boring 3 interior obstructions open by pressure duct 4.
Because after boring 3 was blocked, along with the release of gas, boring had certain pressure in 3.High-pressure blast or high pressure water flushing spud in behind the coal petrography powder that stops up in the hole 3, can close high-pressure blast or water under high pressure, and under the effect of boring 3 internal pressures, the coal petrography powder can be blown in the straight tube 11, under the suction function of extraction pipeline 5, can enter into tee piece 21.The 3rd port 24 of tee piece 21 is used for deslagging, after blockage-clearing device uses a period of time, such as a week, disconnects blockage-clearing device and being connected that extraction pipeline 5 is connected with pressure duct, and opens the control valve on the 3rd port 24, gets rid of the coal petrography powder in the tee piece 21.If the coal petrography powder in the tee piece 21 is a lot, can utilize pressure duct 4 to clear up fast.
The blockage-clearing device that technique scheme provides, in the course of the work, blockage-clearing device respectively with boring, pressure duct and extraction pipeline connection, so a whole set of blockage-clearing device is in full closeding state, make the water, coal dust and the gas that spray during the block clearing all enter the slagging-off assembly that is under the negative pressure extraction state, can not cause gas to reveal, so can be used for processing the boring blockage problem, and quick, convenient, safety have been avoided building the pressure in or the hole improper because of boring obstruction manner of cleaning up and have been caused spray orifice to hurt sb.'s feelings and gas accident.
Referring to Fig. 1, for the ease of regulating the pressure state in the tee piece 21, can all be provided with control gate valve (scheming not shown) on described the first port 22 and described the second port 23.Open the control gate valve on the first port 22, tee piece 21 is communicated with extraction pipeline 5, and tee piece 21 also is negative pressure state under the effect of extraction pipeline 5.Open the control gate valve on the second port 23, so that also be negative pressure state in the straight tube 11.
Herein, the pipe at three port places is all selected equal pipe on the tee piece 21, and this sentences and selects diameter is that the pipe of 159mm is example, but is not limited to this.Can respectively weld one 2 cun band silk short circuits on each port, so that tee piece 21 is connected with miscellaneous part.Herein, control valve is selected identical structure with two control gate valves, and size all is 2 cun.
The blockage-clearing device that technique scheme provides, in processing the boring plug-hole, blockage-clearing device is in full closeding state, has avoided causing because of the larger block clearing of boring internal pressure the generation of the casualty accident that boring coal powder injection rock dust causes, and has guaranteed the safety of blocking cleaning work; In processing the boring plug-hole, blockage-clearing device links to each other with mine extraction system, is in negative pressure state in the slagging-off assembly, has avoided that internal pressure is large, gas density is high, spray orifice causes the gas exceeding limit accident because holing.In addition, above-mentioned blockage-clearing device is simple in structure, and input cost is low, original paper is small and exquisite, is easy to carry and operates.
It should be noted that at last: above each embodiment is not intended to limit only in order to the technical solution of the utility model to be described; Although with reference to aforementioned each embodiment the utility model is had been described in detail, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps some or all of technical characterictic wherein is equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution break away from the scope of each embodiment technical scheme of the utility model.
Claims (2)
1. a blockage-clearing device is characterized in that, comprising:
The block clearing assembly comprises straight tube and high-voltage tube, and an end of described high-voltage tube stretches into described straight tube and is positioned at the first end of described straight tube, and the other end of described high-voltage tube is used for being communicated with pressure duct;
The slagging-off assembly, comprise tee piece, described tee piece has the first port, the second port and the 3rd port, wherein, described the first port is used for and the extraction pipeline connection, described the second port is communicated with the second end of described straight tube, is provided be used to the control valve of controlling described the 3rd port open or closing on described the 3rd port.
2. blockage-clearing device according to claim 1 is characterized in that:
All be provided with the control gate valve on described the first port and described the second port.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220544831 CN202866696U (en) | 2012-10-23 | 2012-10-23 | Block-clearing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220544831 CN202866696U (en) | 2012-10-23 | 2012-10-23 | Block-clearing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202866696U true CN202866696U (en) | 2013-04-10 |
Family
ID=48033422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220544831 Expired - Fee Related CN202866696U (en) | 2012-10-23 | 2012-10-23 | Block-clearing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202866696U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105041247A (en) * | 2015-08-20 | 2015-11-11 | 淮南矿业(集团)有限责任公司 | Slag-discharge system using nitrogen |
-
2012
- 2012-10-23 CN CN 201220544831 patent/CN202866696U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105041247A (en) * | 2015-08-20 | 2015-11-11 | 淮南矿业(集团)有限责任公司 | Slag-discharge system using nitrogen |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11506041B2 (en) | Drilling-slitting-sealing-fracturing device and method for a deep low-permeability gassy coal seam | |
CN101413399B (en) | Drill hole spray safety protection system | |
CN201568076U (en) | Drilling hole sealing device in highly gassy mine | |
CN103470297A (en) | Drilling, pumping and discharging integrated coal seam pressure relief and permeability improvement device and using method thereof | |
CN104989356A (en) | Underground coal mine coal seam drilling high-pressure gas fracturing and permeability increasing method and system | |
CN204552809U (en) | Drill anti-spray orifice Pre-control System in a kind of colliery | |
CN202866696U (en) | Block-clearing device | |
CN102128047B (en) | Gas-slag separation and recovering system for drilling construction | |
CN108266222A (en) | A kind of solvent extraction, moistening reversion, pulsation pressure break Trinity coal body anti-reflection method | |
CN205638532U (en) | But colliery is reuse's integrative hole sealing device of gas drainage water injection in pit | |
CN201991548U (en) | Drainage, slag discharge and gas extraction integrated device | |
CN204402406U (en) | A kind of down-hole coal bed mash gas pumping drilling prosthetic device | |
CN202348323U (en) | Coal mine gas drainage drill combination hole-main pipe hole linkage structure | |
CN108561176B (en) | Automatic blocking and permeability-increasing device and method for gas extraction drilling | |
CN202882810U (en) | Novel multifunctional dust falling device | |
CN205532447U (en) | Prevent orifice gasbag formula buffer | |
CN201546749U (en) | Coal seam drilling dust extinction device | |
CN110295913B (en) | Tunnel blasting excavation system and construction method | |
CN202788934U (en) | Underground coal mine downward hole drainage device | |
CN107642359A (en) | The attached wind booth vertical shaft section in subway station excavates slag tap structure and construction method | |
CN201934126U (en) | Down-hole drilling gas drainage device | |
CN203879533U (en) | Orifice dust removal device for coal seam drilled hole | |
CN203130027U (en) | Safety protection and dust catching device for drilling construction | |
CN206845135U (en) | A kind of blowout prevention aperture apparatus for firedamp taking-out discharging drilling | |
CN202348211U (en) | Complete equipment for preventing gas emission from drill hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130410 Termination date: 20181023 |
|
CF01 | Termination of patent right due to non-payment of annual fee |