CN202865356U - Air control cabinet of aluminum electrolysis cell - Google Patents

Air control cabinet of aluminum electrolysis cell Download PDF

Info

Publication number
CN202865356U
CN202865356U CN 201220497257 CN201220497257U CN202865356U CN 202865356 U CN202865356 U CN 202865356U CN 201220497257 CN201220497257 CN 201220497257 CN 201220497257 U CN201220497257 U CN 201220497257U CN 202865356 U CN202865356 U CN 202865356U
Authority
CN
China
Prior art keywords
control cabinet
valve
air
gas control
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220497257
Other languages
Chinese (zh)
Inventor
司徒德良
鲁红生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHAOQING JINKEHAI PNEUMATIC COMPLETE CO Ltd
Shenyang Yinhai Machinery Equipment Manufacturing Co Ltd
Original Assignee
ZHAOQING JINKEHAI PNEUMATIC COMPLETE CO Ltd
Shenyang Yinhai Machinery Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHAOQING JINKEHAI PNEUMATIC COMPLETE CO Ltd, Shenyang Yinhai Machinery Equipment Manufacturing Co Ltd filed Critical ZHAOQING JINKEHAI PNEUMATIC COMPLETE CO Ltd
Priority to CN 201220497257 priority Critical patent/CN202865356U/en
Application granted granted Critical
Publication of CN202865356U publication Critical patent/CN202865356U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model relates to an air control cabinet of an aluminum electrolysis cell. The structure of the air control cabinet comprise an electronic control reversing valve, a valve terminal (an integrated plate), a temperature control system, an air inlet pipeline, an air outlet pipeline, a public exhaust pipeline, an air source FRL (a filter, a pressure regulating valve and a lubricator) and the like. An inner part of the air control cabinet adopts a large-flow containerized control way, i.e. a valve terminal control way, so that the flow is guaranteed from the air inflow to the air source output of an electronic control valve, the air supply pressure is guaranteed, a problem of signalizing activity lagging is not generated in the air control cabinet, and the actions of the crust breaking and the charging are accomplished successfully. The air control cabinet of the aluminum electrolysis cell has the characteristics of being compact in structure, convenient to use and long in service life, completely omitting a connecting pipe between valves and the like, so that accident factors, the maintenance intensity of enterprise maintainers and the cost of maintenance after the investment are greatly reduced; and meanwhile, the exhausted air of the electronic control reversing valve of the air control cabinet can be exhausted outside an electrolytic plant in an centralized way without pollution, and an electronic control reversing valve is not arranged at the top of a crust breaking cylinder as needed.

Description

Aluminium cell gas control cabinet
Technical field
The utility model relates to a kind of aluminium cell gas control cabinet, is fit to be applied in the aluminium electrolysis prebaked anode production system, especially is fit to be applied in the super large grooved aluminium electrolysis prebaked anode production system.
Background technology
Along with the startup of domestic super-huge 600 kA large-scale pre-baked cells, representing the development that China's aluminium electrolysis prebaked anode production system has entered environment-friendly type, striden the epoch.Pneumatic control cabinet can adapt to strong current, upfield environment, satisfy the demand for development of environmental protection, safety, stable, efficient modern aluminum electrolysis process, in time the aluminium electrolysis shop production unit is carried out conduct monitoring at all levels and feedback, reduce on-the-spot artificial operational ton in the production process, to realize full-automatic modern management.
Behind the slot control machine receive data, send the action control signal, control signal has several commutation electrically-controlled valve by the gas control cabinet of cable to the electrolysis trough rim in the gas control cabinet, the commutation electrically-controlled valve again by pneumatic pipeline control crust breaking, go out aluminium cylinder, the action of constant-volume blanking device.Pressurized air enters in crust breaking cylinder, the constant-volume blanking device cylinder after the commutation electrically-controlled valve in the gas control cabinet by main supply air pipe and a supply air line again, finishes crust breaking, reinforced action.
Present domestic Pneumatic control cabinet has two kinds of forms: the commutation electrically-controlled valve connects by copper pipe in the one gas control cabinet, the copper pipe wall thickness makes the actual air circulation area not enough, caused and dammed, in actual production process, can make constant-volume blanking device and crust breaking, go out aluminium cylinder work hysteresis.The tube road is connected and is not easy to maintaining, takes up room greatlyr between electric control reversing valve and the valve, and the electric control reversing valve replacement time after the life cycle is longer, thereby impact is produced.
Electric control reversing valve spool gap is too small in its two gas controls cabinet causes electric control reversing valve work smooth and easy not.Wire barrel is passed by in complexity, easily entanglement.
All in cabinet, the electric control reversing valve exhaust all can not in time be discharged in the gas control cabinet in exhaust in the current electrolysis groove Pneumatic control cabinet, and the exhaust in cabinet of the mist of oil in the three linked piece causes the cabinet internal contamination, affects the electric elements life-span in the cabinet.And all provide system without temperature.
Electric current in the 600KA large-scale pre-baked cell, magnetic field are huge.Pressurized air by main supply air pipe and supply air line output after electric control reversing valve control enter crust breaking, go out aluminium cylinder, in the constant-volume blanking device, because of inlet, outlet pipeline internal diameter less, easily form and dam, make gas supply flow not enough, cause upper part of the electrolytic cell far-end constant-volume blanking device, crust breaking cylinder operation power not enough, action lags behind, and makes that constant-volume blanking device leaks material, crust breaking cylinder is slow in one's movements or attonity, overall work lags behind, and can not finish smoothly on request crust breaking, reinforced action.
Summary of the invention
It is valve island control form that a kind of aluminium cell gas control cabinet, this gas control cabinet inside are taked large flow set dress control form, has and controls out aluminium, crust breaking cylinder and constant-volume blanking device holding function.This gas control cabinet is exported source of the gas and is guaranteed flow from the air inlet to the electric control reversing valve, guarantee supply gas pressure, reduces the space pipeline loss, guarantees commutation electrically-controlled valve good working order, increases the service life.The problem that signalizing activity lags behind can not appear in the gas control cabinet, finishes smoothly crust breaking, the action such as reinforced.The electric control reversing valve exhaust can be taked to concentrate on the outer exhaust of cabinet or draw the outside exhaust of potroom in the cabinet, avoids greatly because of electric elements in the various greasy dirt remote effect cabinets that exhaust brings in cabinet of the mist of oil in the three linked piece, and is environment friendly and pollution-free.
This aluminium cell gas control cabinet adopts valve island structure, is respectively equipped with gas source air inlet port, gas source production well, commutation electrically-controlled valve on the valve island and often leaves pore, the commutation normally closed production well of electrically-controlled valve and public venting hole.
Gas source passes to the valve island through the source of the gas three linked piece with source of the gas, by the valve island gas source is distributed to each electric control reversing valve, and when gas source was reset mode by electric control reversing valve, electric control reversing valve was often left pore and tracheae, cylinder intake; When gas source is working order by the commutation electric control reversing valve, the normally closed production well of electric control reversing valve and tracheae, cylinder is given vent to anger.And electric control reversing valve reset and work in a flash, unnecessary waste gas is discharged by the common exhaust pipe road.Be provided with the independent back flushing wind apparatus in the system, can carry out independent control fully when needed.
In gas control cabinet housing, thermal insulation layer and heating tape are set, effectively keep the temperature in the gas control cabinet, the normal operation of gas control cabinet under cold environment.
Concrete technical scheme of the present utility model is as follows: a kind of aluminium cell gas control cabinet, outside at gas control cabinet housing is provided with the source of the gas three linked piece, the end of source of the gas three linked piece links to each other with valve island in the gas control cabinet housing by pipeline, also be connected with the pipeline that reaches gas control cabinet hull outside on the end face on valve island, pipeline communicates from the different gas circuits of inside, valve island; Be provided with two-position three way magnetic valve and two-position four-way solenoid valve on the valve island, two-position three way magnetic valve and two-position four-way solenoid valve be the break-make of pilot piping respectively; Other end on the valve island connects respectively back-blowing inlet pipe and common exhaust pipe, and back-blowing inlet pipe and common exhaust pipe are stretched out respectively gas control cabinet housing.
The internal layer of described gas control cabinet housing is provided with thermal insulation layer; Be provided with heating tape in the gas control cabinet housing, heating tape is connected with air switch by supply lead, and air switch is arranged on the inwall of gas control cabinet housing.
Be provided with connection terminal in the described gas control cabinet housing, connection terminal is connected with two-position four-way solenoid valve with two-position three way magnetic valve respectively by electric wire.
The commutation electrically-controlled valve is provided with band memory hand gear, manual work when assurance solenoid or Controlling System break down in the described gas control cabinet; Use when being convenient to equipment debugging and needing crawl work.This kind commutation electrically-controlled valve is that valve island packaging type connects, need not to change disposable permanent being benefited of valve plate.
The deficiency that the utility model exists in order to solve gas control cabinet prior art, many connecting pipelines in the gas control cabinet have in the past been cancelled, connecting tube between valve and the valve omits fully, the greatly minimizing accident factor and the dimension inspection personnel's of enterprise repair density and the maintenance cost after the operation.Make system more succinct, electric control reversing valve is installed compact, and is rationally distributed, move smooth and easyly, is easy to change, replaceable good in about 2 minutes if the cabinet internal valve breaks down, and do not have the dismounting pipeline, and more convenient operation reduces investment, minimizing maintenance maintenance workload.
This gas control cabinet comprises commutation electrically-controlled valve, valve island (integrated plate), temperature control system, admission passage, outlet pipe, common exhaust pipe road, source of the gas three linked piece, automatically controlled pull-switch, connection terminal etc.
The gas control cabinet adopts electronic and manual control form, during normal operation, by the action of slot control machine control gas control cabinet; Anomalous effect and when commissioning device can be by manual control, and is convenient and reliable.
The commutation electrically-controlled valve good seal performance of configuration in the gas control cabinet, the time of response is fast, weathering resistance is strong, trigger pressure is low, the life-span is long, volume is little, flow is large, shelf life is long, anti-dust ability is strong, to characteristics such as lubricated and requirement for environmental conditions are low, be specially adapted to use under the particular surroundings of high temperature, high dust, upfield.
Temperature provides system can guarantee the normal operation of gas control cabinet under cold environment.
In the gas control cabinet, connection terminal is set, is conducive to make layout compacter to each magnetic valve centralized Control.
Description of drawings
Fig. 1 is the structural representation of aluminium cell gas control cabinet.
Fig. 2 is the gas control schematic diagram of aluminium cell gas control cabinet.
Embodiment
As shown in Figure 1, a kind of aluminium cell gas control cabinet, outside at gas control cabinet housing 12 is provided with source of the gas three linked piece 8, the source of the gas three linked piece is provided with air filter, air pressure regulator, oil sprayer, air filter purifies out with airborne water, the air pressure regulator adjustment needs bleed pressure, and gas source takes mist of oil in the cylinder to through oil sprayer and is lubricated; The end of source of the gas three linked piece 8 links to each other by the valve island 3 in pipeline and the gas control cabinet housing 12, also is connected with the pipeline 13 that reaches gas control cabinet housing 12 outsides on the end face on valve island 3, and pipeline 13 communicates from the different gas circuits of 3 inside, valve island; Be provided with two-position three way magnetic valve 1 and two-position four-way solenoid valve 2 on valve island 3, wherein the break-make of two-position three way magnetic valve 1 and two-position four-way solenoid valve 2 difference pilot piping 13; Connect respectively back-blowing inlet pipe 11 and common exhaust pipe 10 in the other end on valve island 3, back-blowing inlet pipe 11 and common exhaust pipe 10 are stretched out respectively gas control cabinet housing 12.Its common exhaust pipe 10 act as electric control reversing valve reset and work in a flash, unnecessary waste gas is discharged by the common exhaust pipe road, prevent that the electric control reversing valve exhaust all can not in time be discharged in the gas control cabinet, the exhaust in cabinet of mist of oil in the three linked piece causes the cabinet internal contamination, affects the electric elements life-span in the cabinet.Back-blowing inlet pipe 11 is used for separately its air intake of control, and algorithm is carried out smoothly.
The internal layer of described gas control cabinet housing 12 is provided with thermal insulation layer; Be provided with heating tape 5 in the gas control cabinet housing 12, heating tape 5 is connected with air switch 6 by supply lead, and air switch 6 is arranged on the inwall of gas control cabinet housing 12.
Be provided with connection terminal 7 in the described gas control cabinet housing 12, connection terminal 7 is connected with two-position four-way solenoid valve with two-position three way magnetic valve 1 respectively by electric wire and is connected.
As shown in Figure 2, the gas control cabinet is received the Pneumatic reversal valve of controlling the crust breaking cylinder cylinder head on the electrolyzer with the packaging type two-position three way commutation electrically-controlled valve 1 of configuration in its cabinet after the slot control machine instruction and is commutated, switch the gas source of gas control cabinet, finish the crust breaking action in order to control crust breaking cylinder.Utilize the constant-volume blanking cylinder on the packaging type two-position four-way commutation electrically-controlled valve 2 control electrolyzers to finish alumina blanking and fluoride salt blanking, also the crust breaking cylinder head is unworthy of reversing valve as required.

Claims (3)

1. aluminium cell gas control cabinet, it is characterized in that: be provided with source of the gas three linked piece (8) in the outside of gas control cabinet housing (12), the end of source of the gas three linked piece (8) links to each other by the interior valve island (3) of pipeline and gas control cabinet housing (12), also be connected with on the end face of valve island (3) and reach the outside pipeline (13) of gas control cabinet housing (12), pipeline (13) communicates from the different gas circuits of valve island (3) inside; Be provided with two-position three way magnetic valve (1) and two-position four-way solenoid valve (2) in valve island (3), two-position three way magnetic valve (1) and two-position four-way solenoid valve (2) be the break-make of pilot piping (13) respectively; Connect respectively back-blowing inlet pipe (11) and common exhaust pipe (10) in the other end of valve island (3), back-blowing inlet pipe (11) and common exhaust pipe (10) are stretched out respectively gas control cabinet housing (12).
2. aluminium cell gas control cabinet as claimed in claim 1, it is characterized in that: the internal layer of described gas control cabinet housing (12) is provided with thermal insulation layer; Be provided with heating tape (5) in the gas control cabinet housing (12), heating tape (5) is connected with air switch (6) by supply lead, and air switch (6) is arranged on the inwall of gas control cabinet housing (12).
3. aluminium cell gas control cabinet as claimed in claim 1, it is characterized in that: be provided with connection terminal (7) in the described gas control cabinet housing (12), connection terminal (7) is connected 2 with two-position three way magnetic valve (1) with two-position four-way solenoid valve respectively by electric wire) be connected.
CN 201220497257 2012-09-26 2012-09-26 Air control cabinet of aluminum electrolysis cell Expired - Fee Related CN202865356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220497257 CN202865356U (en) 2012-09-26 2012-09-26 Air control cabinet of aluminum electrolysis cell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220497257 CN202865356U (en) 2012-09-26 2012-09-26 Air control cabinet of aluminum electrolysis cell

Publications (1)

Publication Number Publication Date
CN202865356U true CN202865356U (en) 2013-04-10

Family

ID=48032091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220497257 Expired - Fee Related CN202865356U (en) 2012-09-26 2012-09-26 Air control cabinet of aluminum electrolysis cell

Country Status (1)

Country Link
CN (1) CN202865356U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328457A (en) * 2014-10-29 2015-02-04 上海大屯能源股份有限公司 Aluminum-electrolysis multifunctional crown block type dust collection and material distribution system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328457A (en) * 2014-10-29 2015-02-04 上海大屯能源股份有限公司 Aluminum-electrolysis multifunctional crown block type dust collection and material distribution system
CN104328457B (en) * 2014-10-29 2016-06-15 上海大屯能源股份有限公司 A kind of aluminum electrolysis multifunctional overhead crane dust suction and cloth system

Similar Documents

Publication Publication Date Title
CN110374853A (en) A kind of substation's sump draining pump intelligence control system
CN112196783B (en) Automatic control starting method for pump set of long-distance large-pipe-diameter water conveying and transferring pump station
CN205245877U (en) Cooling tower composite control system
CN206094287U (en) Heat exchange station automatic control system
CN108803739A (en) A kind of wisdom building site spraying linkage management system
CN202865356U (en) Air control cabinet of aluminum electrolysis cell
CN111561440A (en) High efficiency air compressor machine unit control system
CN201503063U (en) Full-automatic unattended heat exchanger unit
CN205897404U (en) Frequency conversion friendly air conditioner hydraulic module
CN204961264U (en) Automatic novel intelligence control system that sails upstream of water pump
CN2716761Y (en) Intellectualized controller for heat exchanging machine set
CN208475526U (en) A kind of water system air-conditioner
CN208295559U (en) A kind of supervisor's steam trap water seal breakdown alarm of blast furnace gas and automatic water-replenishing device
CN212492358U (en) Intelligent control system based on HART protocol
CN112947278A (en) Secondary water supply automatic control system
CN205210630U (en) Remote monitering system of iron and steel pretreatment
CN205351655U (en) Dirty water resource heat pump central air conditioning computer lab leaks and assists monitoring and alarm system
CN215982769U (en) Novel heating plate type heat exchange unit device and heating system thereof
CN105064453A (en) Fault diagnosis method for water recycling control system
CN104269904A (en) High-power movable type off-peak electricity energy storage emergency power supply house
CN109603543A (en) It is a kind of for the interim for ammonia system and application method of power plant's SCR denitration device
CN204103569U (en) A kind of high-power portable trough-electricity energy storage emergency power supply room
CN204626526U (en) Water system
CN215832561U (en) Automatic backwashing system for water ring vacuum pump heat exchanger
CN208654623U (en) A kind of Regional Energy station monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130410

Termination date: 20150926

EXPY Termination of patent right or utility model