CN202861001U - Calibration device for production of calendaring wires - Google Patents
Calibration device for production of calendaring wires Download PDFInfo
- Publication number
- CN202861001U CN202861001U CN201220468184.0U CN201220468184U CN202861001U CN 202861001 U CN202861001 U CN 202861001U CN 201220468184 U CN201220468184 U CN 201220468184U CN 202861001 U CN202861001 U CN 202861001U
- Authority
- CN
- China
- Prior art keywords
- locating dowel
- fixed mount
- calibrating installation
- line production
- installation according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a calibration device for production of calendaring wires. The calibration device for the production of the calendaring wires is characterized by comprising first positioning pillars and second positioning pillars, wherein the first positioning pillars and the second positioning pillars are arranged in a relatively moving mode, a first concave groove is arranged in the side face of each first positioning pillar along the peripheral direction, a second groove is arranged in the side face of each second positioning pillar along the peripheral direction, the first grooves and the second grooves are oppositely arranged, more than two first positioning pillars are in linear arrangement, more than two second positioning pillars are in linear arrangement, a plurality of first grooves are respectively arranged opposite to the second pillars, the first grooves and the second grooves can limit the route of metal wires, the first positioning pillars can move relative to the second positioning pillars, the distances between the first grooves and the second grooves is adjusted conveniently, and therefore the calibration device for the production of the calendaring wires is suitable for metal wires of various diameters. By means of an elastic device, the relative position between a first positioning frame and a second positioning frame can be adjusted conveniently. By means of a first handle, an eccentric block can be adjusted conveniently, the relative positions of the first fixing frame and the second fixing frame can be further adjusted conveniently, the relative positions of the first grooves and the second grooves are adjusted conveniently, and convenient use is achieved.
Description
Technical field
The utility model relates to a kind of calendaring line production calibrating installation.
Background technology
Wherein a kind of calender is used for cylindrical copper, aluminum steel or other metal wires are rolled, and makes it to become flat wire, and this kind flat wire also can be described as calendaring line.Calender device length is longer, needs in calender line to guarantee that metal wire advances along the route of appointment.But in the prior art, do not have special calendaring line calibrating installation, it is inconvenient to cause calendaring line to be produced, and up-to-standard rate is low.
The utility model content
First purpose of the present utility model is in order to overcome deficiency of the prior art, a kind of calendaring line production calibrating installation of easily fixing metal line track route to be provided.
For realizing above purpose, the utility model is achieved through the following technical solutions:
Calendaring line production calibrating installation is characterized in that, comprises the first locating dowel and the second locating dowel; The first locating dowel and the second locating dowel can arrange with relatively moving; Described the first locating dowel side along the circumferential direction arranges the first groove; Described the second locating dowel side along the circumferential direction arranges the second groove; The first groove is relative with the second groove location.
Preferably, described the first locating dowel number is more than two, along arranged in a straight line; Described the second locating dowel number is more than two, along arranged in a straight line.
Preferably, one of described the first locating dowel and second locating dowel or both arrange rotationally.
Preferably, described the first locating dowel is arranged on the first fixed mount; Described the second locating dowel is arranged on the second fixed mount; Described the first fixed mount and the second fixed mount can arrange with relatively moving.
Preferably, be provided with elastic device between described the first locating dowel and the second locating dowel, described elastic device the first locating dowel and the second locating dowel near the time can produce elastic force; Described elastic force make the first locating dowel relative with the second locating dowel away from.
Preferably, also comprise transmission device, described transmission device rotatably arranges, and during the rotation of described transmission device the first fixed mount or the second locating rack is applied that active force promotes the first fixed mount or the second fixed mount moves.
Preferably, described transmission device is eccentric block.
Preferably, be provided with guide post on described the first fixed mount; Described guide post runs through the second fixed mount; Described the second fixed mount can arrange movably along guide post; Described elastic device is Compress Spring, and described Compress Spring is set on the guide post; Described Compress Spring is between the first fixed mount and the second fixed mount.
Preferably, also comprise connecting rod, described connecting rod two ends are connected with described guide post respectively; Described eccentric block is between described the second fixed mount and connecting rod.
Preferably, described eccentric block is connected with sleeve, on the described sleeve first in command is installed; Described sleeve and eccentric block are set on the mandrel.
Preferably, described mandrel one end is provided with the locking device that can oppress sleeve and eccentric block compression.
Preferably, also comprise the 3rd fixed mount, described mandrel is installed on the 3rd fixed mount; Described eccentric block and sleeve are arranged between described locking device and the 3rd fixed mount; Described locking device cooperates with described mandrel thread; Described locking device is provided with the second in command.
Preferably, described the first locating dowel and the second locating dowel distribute up and down or along continuous straight runs about distribute.
Preferably, plural the first locating dowel and more than two the second locating dowel distribute up and down and plural the first locating dowel and plural the second locating dowel horizontal direction about distribute; The first locating dowel and the second locating dowel that distribute up and down are positioned at before the first locating dowel and the second locating dowel that distributes about horizontal direction.
Plural the first locating dowel is along arranged in a straight line, and plural the second locating dowel is along arranged in a straight line; A plurality of the first grooves are relative with the second groove location respectively, and the first groove and the second groove can limit the metal wire course.Therefore the first locating dowel and the second locating dowel can arrange with relatively moving, can adjust easily distance between the two, applicable to the metal wire of various diameters.Utilize elastic device, can adjust easily the relative position of the first fixed mount and the second locating rack.Utilize the first in command, can adjust easily eccentric block, and then adjust the relative position of the first fixed mount and the second fixed mount, and then the relative position of capable of regulating the first groove and the second groove, easy to use.
Description of drawings
Fig. 1 is embodiment 1 structural representation, i.e. the first view.
Fig. 2 is embodiment 1 second view.
Fig. 3 is embodiment 2 structural representations.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail:
As shown in Figure 1, calendaring line production calibrating installation comprises three the first locating dowels 1 and four the second locating dowels 2.Three the first locating dowel 1 sides all along the circumferential direction are provided with the first groove 11.Three the first grooves 11 are along arranged in a straight line.Three the first locating dowels 1 are arranged on the first fixed mount 3.Four the second locating dowel 2 sides all along the circumferential direction are provided with the second groove 21.Four the second grooves 21 are along arranged in a straight line.Four the second locating dowels 2 are arranged on the second fixed mount 4.The first fixed mount 3 is arranged at the second fixed mount 4 tops, and three the first grooves 11 and four the second grooves 21 are crisscross arranged.Be provided with two guide posts 13 on the first fixed mount 3.Two guide posts 13 run through the second fixed mount 4.The second fixed mount 4 can move along guide post 13.Be set with a Compress Spring 5 on the every guide post 13.Compress Spring 5 is between the first fixed mount 3 and the second fixed mount 4.The second fixed mount 4 is during near the first fixed mount 3, and Compress Spring 5 is compressed and produce elastic force.This elastic force can make the first fixed mount 3 relative with the second fixed mount 4 away from.Two guide post 13 ends connect by a connecting rod 14.
The second fixed mount 4 is fixedly installed on the 3rd fixed mount 10.Be provided with the mandrel (not shown) on the 3rd fixed mount 10.Be set with rotatable eccentric block 6 and sleeve 7 on the mandrel.Eccentric block 6 and sleeve 7 can mandrel be the axle rotation.Eccentric block 6 is connected with sleeve 7.Eccentric block 6 is arranged between the second fixed mount 4 and the connecting rod 14.The first in command 8 is installed on the sleeve 7.The mandrel end is equipped with locking device 8.Locking device 8 cooperates with mandrel thread.The second in command 9 is installed on the locking device 8.Locking device 8 can be oppressed sleeve 7 and eccentric block 6, makes sleeve 7 and eccentric block 6 near the 3rd fixed mount 10, thereby sleeve 7 and eccentric block 6 are fixed.
As shown in Figure 2, when the utility model uses, at first remove the compressing of 8 pairs of sleeves 7 of locking device and eccentric block 6, make sleeve 7 and eccentric block 6 rotatable.Hold the first in command 8 easily turnbarrel 7 and eccentric block 6.Turnbarrel 7 and eccentric block 6 can utilize the height of asymmetric shape adjustments first fixed mount 3 of eccentric block 6.Can oppress connecting rod 14 in eccentric block 6 rotary courses, make connecting rod 14 drive the first fixed mount 3 and move down, thereby make the first fixed mount 3 near the second fixed mounts 4.When the first fixed mount 3 close the second fixed mount 4, Compress Spring 5 compressed generation elastic forces.Behind the pressure of removing after 6 rotations of rotating eccentricity piece connecting rod 14, the elastic force of Compress Spring 5 upwards pushes away the first fixed mount 3, makes it away from the second fixed mount 4.When the first fixed mount 3 and the second fixed mount 4 distance were suitable, the hand-held second in command's 9 rotatable locking devices 8 made locking device 8 that sleeve 7 and eccentric block 6 are pressed against on the 3rd fixed mount 10, thereby made sleeve 7 and eccentric block 6 fixing.Eccentric block 6 after fixing can make the position that the first fixed mount 3 maintains to be needed.
In the second fixed mount 4 moved up process, the elastic force of Compress Spring 5 both can make the second fixed mount 4 keep stable, can after the thrust of removing eccentric block 6 the second fixed mount 4 be automatically reset again.
After the first fixed mount 3 and the second fixed mount 4 relative positions were fixing, the first groove 11 and the second groove 21 were in the relative distance place of appointment.Metal wire passes between the first groove 11 and the second groove 21.Three the first grooves 11 and four the second grooves 21 form the passage that can limit the metal wire course.
In the present embodiment, can also fix the first fixed mount 3, the second fixed mounts 4 and arrange movably.During use, utilize eccentric block 6 upwards to push up the second fixed mount 4 and can make it near the first fixed mount 3.Elastic force after Compress Spring 5 is compressed can make the second fixed mount 4 away from the first fixed mount 3.
The first locating dowel 1 and the second locating dowel 2 in the utility model can also arrange rotationally, to reduce the frictional force to metal wire, wear prevention metal wire.
As shown in Figure 3, the calendaring line production in comprising embodiment 1 is with the calibrating installation, and and three the first locating dowels 1 and four the second locating dowels 2 of along continuous straight runs distribution.It is all identical with embodiment 1 that mode is adjusted in three the first locating dowels 1 that along continuous straight runs distributes and the structure of four the second locating dowels 2, fixed form and position.The first locating dowel 1 and the second locating dowel 2 that distribute along the vertical direction both be set, the first locating dowel 1 and the second locating dowel 2 that along continuous straight runs distributes also be set, can be from the direct of travel of up and down four direction restriction metal wire.
Embodiment in the utility model only is used for the utility model is described, and does not consist of the restriction to the claim scope, and other substituting of being equal in fact that those skilled in that art can expect are all in the utility model protection domain.
Claims (14)
1. calendaring line production calibrating installation is characterized in that, comprises the first locating dowel and the second locating dowel; The first locating dowel and the second locating dowel can arrange with relatively moving; Described the first locating dowel side along the circumferential direction arranges the first groove; Described the second locating dowel side along the circumferential direction arranges the second groove; The first groove is relative with the second groove location.
2. calendaring line production calibrating installation according to claim 1 is characterized in that, described the first locating dowel number is more than two, along arranged in a straight line; Described the second locating dowel number is more than two, along arranged in a straight line.
3. calendaring line production calibrating installation according to claim 1 is characterized in that, one of described the first locating dowel and second locating dowel or both arrange rotationally.
4. calendaring line production calibrating installation according to claim 1 is characterized in that, described the first locating dowel is arranged on the first fixed mount; Described the second locating dowel is arranged on the second fixed mount; Described the first fixed mount and the second fixed mount can arrange with relatively moving.
5. calendaring line production calibrating installation according to claim 4 is characterized in that, is provided with elastic device between described the first locating dowel and the second locating dowel, described elastic device the first locating dowel and the second locating dowel near the time can produce elastic force; Described elastic force make the first locating dowel relative with the second locating dowel away from.
6. calendaring line production calibrating installation according to claim 5 is characterized in that, is provided with guide post on described the first fixed mount; Described guide post runs through the second fixed mount; Described the second fixed mount can arrange movably along guide post; Described elastic device is Compress Spring, and described Compress Spring is set on the guide post; Described Compress Spring is between the first fixed mount and the second fixed mount.
7. calendaring line production calibrating installation according to claim 6, it is characterized in that, also comprise transmission device, described transmission device rotatably arranges, and during the rotation of described transmission device the first fixed mount or the second locating rack is applied that active force promotes the first fixed mount or the second fixed mount moves.
8. calendaring line production calibrating installation according to claim 7 is characterized in that, described transmission device is eccentric block.
9. calendaring line production calibrating installation according to claim 8 is characterized in that, also comprises connecting rod, and described connecting rod two ends are connected with described guide post respectively; Described eccentric block is between described the second fixed mount and connecting rod.
10. calendaring line production calibrating installation according to claim 8 is characterized in that described eccentric block is connected with sleeve, on the described sleeve first in command is installed; Described sleeve and eccentric block are set on the mandrel.
11. calendaring line production calibrating installation according to claim 10 is characterized in that, described mandrel one end is provided with the locking device that can oppress sleeve and eccentric block compression.
12. calendaring line production calibrating installation according to claim 11 is characterized in that, also comprises the 3rd fixed mount, described mandrel is installed on the 3rd fixed mount; Described eccentric block and sleeve are arranged between described locking device and the 3rd fixed mount; Described locking device cooperates with described mandrel thread; Described locking device is provided with the second in command.
13. calendaring line production calibrating installation according to claim 1 is characterized in that, described the first locating dowel and the second locating dowel distribute up and down or along continuous straight runs about distribute.
14. calendaring line production calibrating installation according to claim 1, it is characterized in that, plural the first locating dowel and more than two the second locating dowel distribute up and down and plural the first locating dowel and plural the second locating dowel horizontal direction about distribute; The first locating dowel and the second locating dowel that distribute up and down are positioned at before the first locating dowel and the second locating dowel that distributes about horizontal direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220468184.0U CN202861001U (en) | 2012-09-13 | 2012-09-13 | Calibration device for production of calendaring wires |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220468184.0U CN202861001U (en) | 2012-09-13 | 2012-09-13 | Calibration device for production of calendaring wires |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202861001U true CN202861001U (en) | 2013-04-10 |
Family
ID=48027759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220468184.0U Expired - Lifetime CN202861001U (en) | 2012-09-13 | 2012-09-13 | Calibration device for production of calendaring wires |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202861001U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102847730A (en) * | 2012-09-13 | 2013-01-02 | 上海颐尚电工科技有限公司 | Calibration device for production of flat wires |
-
2012
- 2012-09-13 CN CN201220468184.0U patent/CN202861001U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102847730A (en) * | 2012-09-13 | 2013-01-02 | 上海颐尚电工科技有限公司 | Calibration device for production of flat wires |
CN102847730B (en) * | 2012-09-13 | 2015-11-11 | 上海颐尚电工科技有限公司 | Calendaring line production calibrating installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103009144A (en) | Follow-up clamping device | |
CN201761977U (en) | Cable center control device | |
CN202019162U (en) | Adjustable cable bending device | |
CN202861001U (en) | Calibration device for production of calendaring wires | |
CN202846408U (en) | Universal support and universal fixture using the same | |
CN205097076U (en) | Circular location feedway | |
CN203330195U (en) | Plate rolling machine machining conical cylinder | |
CN201744594U (en) | Straightener | |
CN109319573A (en) | A kind of movable type of track traffic cable rotatably adjusts the actinobacillus device of height | |
CN201871645U (en) | Wire bidirectional-straightening device | |
CN106944503A (en) | Realize the regulator cubicle cold-reduced sheet bender of a variety of bendings | |
CN204294702U (en) | A kind of rail clamping twist and warping device | |
CN206806874U (en) | A kind of Height Adjustable cable unreeling rack | |
CN102847730B (en) | Calendaring line production calibrating installation | |
CN204295547U (en) | Centralising device | |
CN203888847U (en) | Doffing machine for spinning winding head | |
CN203794315U (en) | Two-direction adjustable cable paying-off device | |
CN204294703U (en) | A kind of twist and warping clamping device of rail band platform | |
CN207642069U (en) | A kind of geotechnical engineering angle pipe equipment | |
CN209583288U (en) | A kind of device convenient for the winding of column support type isolated bus | |
CN203356963U (en) | Device bringing convenience to inlaying alloy in stabilizers | |
CN103287608B (en) | Adhesive tape enwinding device | |
CN203725531U (en) | Guide wheel device | |
CN203045350U (en) | Follow-up clamping device | |
CN207052920U (en) | The controllable sliding support of ground wire press-connection machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: 201600 Shanghai city Songjiang District Yuxiu Road No. 136 building 6 Patentee after: SHANGHAI YISHANG ELECTRIC TECHNOLOGY CO.,LTD. Address before: 201600 Shanghai city Songjiang District Yuxiu Road No. 39 Patentee before: SHANGHAI YISHANG ELECTRICAL TECHNOLOGY Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130410 |