CN202850980U - Down-hole drainage drilling hole construction video automatic monitoring system - Google Patents
Down-hole drainage drilling hole construction video automatic monitoring system Download PDFInfo
- Publication number
- CN202850980U CN202850980U CN 201220501045 CN201220501045U CN202850980U CN 202850980 U CN202850980 U CN 202850980U CN 201220501045 CN201220501045 CN 201220501045 CN 201220501045 U CN201220501045 U CN 201220501045U CN 202850980 U CN202850980 U CN 202850980U
- Authority
- CN
- China
- Prior art keywords
- hole
- monitor
- video
- monitoring
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Closed-Circuit Television Systems (AREA)
Abstract
The utility model relates to a down-hole drainage drilling hole construction video automatic monitoring system which comprises a pulley, a T-shaped support, a suspension steel wire, a base which is capable of rotating leftwards and rightwards, a down-hole infrared anti-explosion monitor, and a monitor suspension device which is composed of a connecting bearing and a connecting base, wherein the connecting bearing is capable of vertically rotating. The down-hole drainage drilling hole construction video automatic monitoring system further comprises a down-hole power source, a power source linkage device, a video server, a switchboard, a data transmission interface, a data monitoring server, a video monitoring host and an automatic storing device. The down-hole drainage drilling hole construction video automatic monitoring system is characterized in that the monitor suspension device is installed at the position of a roadway top plate in front of a tunneling operating surface so as to enable an angle of the monitor to be adjustable and slide frontward and backward, aims of moving forward with the operating surface and alignment to a drilling hole all the time are achieved, the monitor and a drilling machine are connected on the power source linkage device, the linkage device is connected with the down-hole power source, when the drilling machine starts drilling, the linkage device is capable of enabling the down-hole power source to supply electricity to the monitor, the monitor starts monitoring the drilling hole, and sends network signals which are converted into network video signals through the video server, the switchboard, the data transmission interface, the data monitoring server and the video monitoring host. The network video signals are stored and filed through the automatic storing device. Therefore, real-time monitoring and query can be conveniently achieved.
Description
Technical field
The utility model relates to a kind of monitoring system that can automatically start with autostore, more precisely down-hole extraction drilling construction automatic video monitoring system.
Background technology
Present extraction boring examination situation is that boring is reserved Kong Weihou by the constructor, omnidistance drilling process is followed the tracks of the firedamp taking-out discharging drilling construction overall process by extraction boring inspector and is checked and accepted supervision, after desired depth is got in boring, by the fireboss, the constructor, boring is checked and accepted worker three parts and can be pulled out of hole after at the scene, whenever trip out a drilling rod, the constructor, the inspector two people affirmation of jointly propagandaing directed to communicate, the other Station Supervision of fireboss, check and accept affirmation by root, after drilling rod is all extracted, confirmed in boring record of acceptance signature by tripartite personnel, i.e. " three people sign and confirm the system of checking and accepting ".But because the special environment in down-hole, cause the worker can lose shape in the course of receiving at the scene, the event that may occur to practise fraud in the course of receiving occurs, and does not guarantee that each boring can both be constructed to put in place, and can't check and accept boring and reexamine.
Summary of the invention
The purpose of this utility model provides a kind of down-hole extraction drilling construction automatic video monitoring system simple in structure.
The purpose of this utility model can realize in the following manner: down-hole extraction drilling construction automatic video monitoring system, comprise pulley, T-shaped support, hang steel wire, but left-right rotation base, the explosion-proof monitor of down-hole infrared rays, the connection bearing that can rotate up and down and connection base, it is characterized in that the smooth track support that plays of back place installation in face of headwork, infrared rays explosion-proof monitor in down-hole is installed on the pulley, then rack-mount, it can be slided, and angle that can monitor can be regulated, can make like this it follow the front of work plane and then advance and the position that can always aim at rig is monitored, then monitor and rig are connected on the power supply linkage, linkage is connecting power supply, the Field Force adjusts first the angle of monitor, make alignment lens boring, when the rig startup begins to drill, because linkage can make power supply power to monitor, monitor is started working like this, begin boring is monitored, outputting video signal changes into optical signal by built-in video optical multiplexer, carries out the signal transmission by optical fiber.Mining video server carries out conversion and the Internet Transmission of analog to digital signal in single device.Video server passes the data that collect to the Mine-used I. S switch.Switch passes the data that collect to data transmission interface with optical signal by opto-electronic conversion.Data transmission interface is carrying out providing network video signal to data server after the data transaction.Utilize Network Video Surveillance software that Real Time Monitoring is carried out in protrusion-dispelling drilling construction place at monitoring host computer, and the video data that collects is carried out the autostore filing, in order to inquiry.
The utility model compared with prior art has the following advantages: owing to adopting lighter is installed on ashtray, people just can come igniting cigarette with the lighter above the ashtray when smoking like this, avoid the phenomenon that affects smoking that causes because can not find lighter; Owing to adopting the structure that lighter design is become double end, after damaging, just can use a sparking head like this another sparking head, avoid after a sparking head damages, just can not continuing to have used lighter; Owing to adopting inflation inlet is set on lighter, after the gas in the lighter uses, just can inflates to the inside like this, repeatedly use so that lighter can circulate.
Description of drawings
Fig. 1 is the schematic diagram of this down-hole extraction drilling construction automatic video monitoring system.
Fig. 2 is the positive hang figure of this watch-dog;
Fig. 3 is this watch-dog side hang figure;
Among the figure 1, pulley; 2, T-shaped support; 3, hang steel wire; But 4 left-right rotation bases; 5, the explosion-proof monitor of down-hole infrared rays; The connection bearing that 6, can rotate up and down; 7, connect base.
The specific embodiment
In Fig. 2 and Fig. 3, down-hole extraction drilling construction automatic video monitoring system, comprise pulley (1), T-shaped support (2), hang steel wire (3), but left-right rotation base (4), the explosion-proof monitor of down-hole infrared rays (5), the connection bearing that can rotate up and down (6) and connection base (7), it is characterized in that: with the explosion-proof monitor of down-hole infrared rays (5) by the connection bearing (6) that can rotate up and down be connected left-right rotation base (4) and be connected to and connect on the base (7), connecting base (7) is connected to again on the pulley (1), pulley (1) is stuck on the T-shaped support (2), and T-shaped support (2) is suspended on the back by hanging steel wire (3).Can before and after T-shaped support (2) is upper, slide by pulley (1) like this and realize before the explosion-proof monitor of down-hole infrared rays (5) is along with digging laneway and then advance, and can be by the connection bearing (6) that can rotate up and down and but left-right rotation base (4) is regulated respectively up and down and about angle, can make rig always in the monitoring range of watch-dog.
In Fig. 1, logical said method regulates the angle of the explosion-proof monitor of down-hole infrared rays (5) first, make it aim at drill hole, then start rig, because rig and the explosion-proof monitor of down-hole infrared rays (5) are connected on the power supply linkage, when so rig starts, the power supply of the explosion-proof monitor of down-hole infrared rays (5) also begins power supply, the explosion-proof monitor of down-hole infrared rays (5) is started working and is spread out of network signal, then pass through switch, data transmission interface, the monitor data server, the video monitoring main frame, be numbered by autostore equipment at last and store in the memory device, the utility model is simple in structure, is easy to make.
Claims (1)
1. down-hole extraction drilling construction automatic video monitoring system, comprise pulley (1), T-shaped support (2), hang steel wire (3), but left-right rotation base (4), the explosion-proof monitor of down-hole infrared rays (5), the connection bearing that can rotate up and down (6) and connection base (7), also comprise down-hole power, the power supply linkage, video server, switch, data transmission interface, the monitor data server, video monitoring main frame and automatic storage device, it is characterized in that: with the explosion-proof monitor of down-hole infrared rays (5) by the connection bearing (6) that can rotate up and down be connected left-right rotation base (4) and be connected to and connect on the base (7), connecting base (7) is connected to again on the pulley (1), pulley (1) is stuck on the T-shaped support (2), and T-shaped support (2) is suspended on the back by hanging steel wire (3).Slide before and after like this can be upper by pulley (1) (2) on T-shaped support and realize before the explosion-proof monitor of down-hole infrared rays (5) is along with digging laneway and then advance, and can be by the connection bearing (6) that can rotate up and down and but left-right rotation base (4) is regulated respectively up and down and about angle, can make rig always in the monitoring range of watch-dog.Monitor and rig are connected on the power supply linkage, linkage is connecting down-hole power, when the rig startup is drilled, linkage can make down-hole power power to monitor, monitor begins the boring monitoring, and spread out of network signal and become network video signal through video server, switch, data transmission interface, monitor data server, video monitoring main frame, utilize Network Video Surveillance software that Real Time Monitoring is carried out in protrusion-dispelling drilling construction place at monitoring host computer, and the video data that collects is carried out autostore file, in order to inquiry.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220501045 CN202850980U (en) | 2012-09-21 | 2012-09-21 | Down-hole drainage drilling hole construction video automatic monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220501045 CN202850980U (en) | 2012-09-21 | 2012-09-21 | Down-hole drainage drilling hole construction video automatic monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202850980U true CN202850980U (en) | 2013-04-03 |
Family
ID=47982190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220501045 Expired - Fee Related CN202850980U (en) | 2012-09-21 | 2012-09-21 | Down-hole drainage drilling hole construction video automatic monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202850980U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696756A (en) * | 2013-12-19 | 2014-04-02 | 中煤科工集团西安研究院有限公司 | Method for video monitoring of gas yielding conditions of every coal seam in coal seam gas well production process |
CN106303337A (en) * | 2016-11-02 | 2017-01-04 | 淮南矿业(集团)有限责任公司 | A kind of hole-drilling video product acceptance data acquisition system and method thereof |
-
2012
- 2012-09-21 CN CN 201220501045 patent/CN202850980U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696756A (en) * | 2013-12-19 | 2014-04-02 | 中煤科工集团西安研究院有限公司 | Method for video monitoring of gas yielding conditions of every coal seam in coal seam gas well production process |
CN106303337A (en) * | 2016-11-02 | 2017-01-04 | 淮南矿业(集团)有限责任公司 | A kind of hole-drilling video product acceptance data acquisition system and method thereof |
CN106303337B (en) * | 2016-11-02 | 2019-01-11 | 淮南矿业(集团)有限责任公司 | A kind of hole-drilling video product acceptance data acquisition system and its method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104100258B (en) | A kind of hydraulic fracturing micro seismic monitoring device and monitoring method | |
CN203729976U (en) | All-dimensional peeping probe and positioning device for coal mine downhole drilling | |
CN102808610B (en) | Coal mine down-hole drilling degree of depth real-time detection apparatus and detection method | |
CN202850980U (en) | Down-hole drainage drilling hole construction video automatic monitoring system | |
CN201730613U (en) | Microearthquake monitoring system of non-coal mine | |
CN102628355B (en) | Cable-free borehole clinometer and synchronous inclinometry method thereof based on synchronization technology | |
CN105350979A (en) | Detection method of tunnel safety detecting and repairing car having warning function | |
CN203178504U (en) | In-hole infrared visual detection device for coal mine goaf | |
CN204057820U (en) | Winch control device | |
CN101798923A (en) | System and method for remote control coal mine evacuation working face advance detection and forecasting | |
CN108318931A (en) | In high precision, essential safety roof height of water flowing fractured zone method of real-time | |
CN202866790U (en) | Coal mine downhole drilling depth real-time detection device | |
WO2013139830A3 (en) | Downhole detection system | |
CN204810452U (en) | Mining ann's type drilling camera device | |
CN106869910A (en) | Crack recognition methods and system | |
CN202362466U (en) | Height detecting device for water flowing fracture zone on coal extraction working surface | |
CN103061743A (en) | High-depth winze shaft blocking state observation monitoring method | |
CN201857953U (en) | Advanced abutment pressure monitoring device on coal face | |
CN202914075U (en) | Gas drilling information integrated monitoring system | |
CN201874461U (en) | Anti-deviation straightening while-drilling composite drilling device | |
CN202485845U (en) | Device for monitoring lateral bearing pressure of stoping tunnel | |
CN206906608U (en) | A kind of automatic drill, which is detected a mine, reaches exploration device | |
CN102758608B (en) | Ball-throwing type releasing method and drilling tool used for same | |
CN106017332A (en) | Roadway surrounding rock surface relative displacement monitoring system and method | |
CN205120410U (en) | Special automatic sampler of resource prospection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 Termination date: 20130921 |