CN202831177U - Sewage collecting system - Google Patents

Sewage collecting system Download PDF

Info

Publication number
CN202831177U
CN202831177U CN 201220528340 CN201220528340U CN202831177U CN 202831177 U CN202831177 U CN 202831177U CN 201220528340 CN201220528340 CN 201220528340 CN 201220528340 U CN201220528340 U CN 201220528340U CN 202831177 U CN202831177 U CN 202831177U
Authority
CN
China
Prior art keywords
sewage
enterprise
pipe
collecting system
high level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220528340
Other languages
Chinese (zh)
Inventor
王礼敬
李都望
何小英
梅曙明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN 201220528340 priority Critical patent/CN202831177U/en
Application granted granted Critical
Publication of CN202831177U publication Critical patent/CN202831177U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a sewage collecting system which comprises a sewage discharge pipe of an enterprise. The sewage discharge pipe is connected to a high level water pool through an underground pipeline, the high level water pool is connected to a sewage treatment plant through a main sewage pipe, and the high level water pool is connected into a front-arranged valve of the main sewage pipe. The sewage collecting system has the advantages that the sewage discharge pipe of the enterprise adopts the method that one enterprise corresponds to one pipe, and a pressure pipe is adopted, and therefore the problem that an enterprise discharges sewage secretly and arbitrarily is avoided, and at the same time excessive emissions of the enterprise are limited. The sewage collecting system facilitates an administrating department to sample conveniently, shortens sampling time, lowers monitoring difficulties, and is advantageous to development of the renovation work of water environment. The pipeline is laid below green belts, and is buried shallowly, convenient to investigate and examine and repair, and less in workload. The administrating department is capable of investigating the sewage discharge pipe at any time according to actual situations, increases penalty degrees, and therefore the problem that an enterprise solves problems mistakenly and discharging arbitrarily is limited. A high level water pool is adopted to achieve a pressure flow to replace pump pressurizing in the prior art, and the operational energy consumption of the sewage collecting system is reduced.

Description

Sewage collection system
Technical field
The utility model relates to a kind of sewage collection system, collection and the mode of movement of the sewage of especially a kind of industrial park enterprise discharging, and " enterprise one pipe " pattern is adopted in the collection of sewage.
Background technology
Sewer line buries in underground, the misconnection of pipeline is row's phenomenon ubiquity and difficult discovery disorderly, even in case after finding to correct, because the many factors such as follow-up supervision is inadequate, supervision is not in place, misconnection disorderly row's phenomenon may occur again at any time, therefore the random row of the misconnection of underground utilities present situation is difficult to avoid, just because of going out thoroughly endless of the random row's problem of the misconnection of pipeline, especially the misconnection of sewer line is disorderly arranged, and the row's problem of stealing of enterprise, caused the water pollution problems of industry park very serious.Along with the increasing of country to the environmental renovation dynamics, the energy-saving and emission-reduction requirement that " 12 " planning proposes, and the implementing of the relevant policies such as zero-emission of industrial enterprise's sewage, the collection of industrial park sewage and processing problem have become the most important thing in the environmental renovation work.
At present, what the sewage collecting of industrial park adopted substantially is the gravity transfer mode, and the sewage of enterprise discharging enters municipal sewage system through processing to reach to receive accordingly after the pipe standards, then is delivered to Wastewater Treatment Plant by municipal wastewater pipe gravity current.Because soil pipe is embedded in underground, what adopt is gravity current, Some Enterprises is in order to reduce cost of sewage disposal, the profit-push maximization, the sewage that enterprise is produced enters the urban rainwater system, or avoids the sewage metering device that administrative department arranges, and special-purpose blind sewer is set sewage is entered the foul sewer system that enters behind the metering device, therefore, sewage is stolen row's problem and is difficult to solution.
Summary of the invention
The purpose of this utility model is to provide a kind of sewage collection system, consider that foul sewer system is arranged phenomenon steathily general, the sewage pollution of garden is serious, characteristics for the present situation foul water system, take into account energy-conservation requirement, consider that simultaneously the garden management intensity is weak, whole garden foul sewer system adopts the mode of movement of pressure current, thereby has avoided to the full extent sewage to steal row's problem.
The technical solution of the utility model is: a kind of sewage collection system, this sewage collection system comprises the sewage outlet pipe of enterprise, the sewage outlet pipe is connected to head-tank along underground pipe canal, head-tank is connected to Wastewater Treatment Plant by the sewage main pipe, before the head-tank access sewage main pipe valve is set.
Enterprise's sewage outlet pipe adopts " enterprise one pipe " pressure to carry, and the sewage outlet pipe is along in-duct installation, and many soil pipes share a pipe trench.The sewage collecting pool subregion distributes, and a foul sewer system arranges several sewage collecting pools, and sewage collecting pool adopts head-tank.Each sewage collecting connects by the sewage main pipe, the sewage collecting pool outlet pipe is connected to the sewage main pipe, valve is set on the outlet pipe to be controlled, the sewage main pipe is realized pressure current by the height that arranges of sewage collecting pool, and whole foul sewer system is pressure current from enterprise's sewage outlet pipe to Wastewater Treatment Plant.
The utility model has the advantage of: enterprise's soil pipe concentrates on the discharging of sewage collecting pool place, and administrative department confirms the discharging responsibility by the concentration of emission that detects outfall, can realize who pollutes and be responsible for whom, and the effluent discharge responsibility is clear and definite; Outfall is concentrated, and is convenient to administrative department's sampling convenient, shortens sample time, reduces the supervision difficulty, is conducive to carrying out of water environment renovation; In-duct installation is under greenbelt, and buried depth is more shallow, and the investigation maintenance is convenient, and workload is little, and administrative department can regularly look into row to the sewage outlet pipe according to actual conditions, strengthens the punishment dynamics, thereby has further limited the row's problem of stealing of enterprise; Head-tank is adopted in the sewage collecting pond, the sewage main pipe lays to Wastewater Treatment Plant after being communicated with each head-tank, utilize the pressure current of the discrepancy in elevation realization sewage main pipe of head-tank, thereby guarantee whole foul sewer system pressure current state, arranging of head-tank replaced pumping plant in the past, reduced construction investment, reduce operating cost, convenient management, that has further limited enterprise arranges phenomenon steathily, and simultaneously the present invention takes into account the requirement of energy-conservation aspect, has reached to the full extent effects of energy saving and emission reduction, reduced the supervision difficulty, compared conventional sewage collection system and have certain advantage.
Description of drawings
Fig. 1 is the utility model sewage collection system structural representation;
Fig. 2 is the utility model sewage collection system structure flow chart.
The specific embodiment
A kind of sewage collection system, this sewage collection system comprises the sewage outlet pipe 2 of enterprise 1, sewage outlet pipe 2 is connected to head-tank 4 along underground pipe canal 3, and head-tank 4 is connected to Wastewater Treatment Plant 7 by sewage main pipe 6, before the head-tank 4 access sewage main pipes 6 valve 5 is set.
The sewage collecting mode that the present invention adopts is: the outlet pipe of enterprise adopts " enterprise one pipe " (sewage dedicated pipe of an enterprise), the sewage outlet pipe is along in-duct installation, some sewage collecting pipes adopt a common pipe trench, discharge be delivered to the sewage collecting pond of section by pressure after, sewage collecting pool adopts head-tank, subregion is arranged, sewage collecting pool is connected to Wastewater Treatment Plant by the sewage main pipe, sewage collecting pool arranges valve and is controlled before the access main pipe, sewage in the sewage main pipe utilizes sewage collecting pond height being set and realizes pressure current, thereby guarantees that sewage whole process using pressure is delivered to Wastewater Treatment Plant.
The sewage outlet pipe of enterprise is along in-duct installation, some soil pipes adopt a common pipe trench, be delivered to the sewage collecting pond by pressure, sewage collecting pool adopts head-tank, the subregion layout, sewage collecting pool connects by the sewage main pipe, and sewage head-tank outlet pipe arranges valve and is controlled before the access main pipe, the sewage main pipe utilizes arranging of sewage collecting pond highly to realize pressure current, thereby guarantees that sewage whole process using pressure is delivered to Wastewater Treatment Plant.

Claims (1)

1. sewage collection system, it is characterized in that: this sewage collection system comprises the sewage outlet pipe (2) of enterprise (1), sewage outlet pipe (2) is connected to head-tank (4) along underground pipe canal (3), head-tank (4) is connected to Wastewater Treatment Plant (7) by sewage main pipe (6), the front valve (5) that arranges of head-tank (4) access sewage main pipe (6).
CN 201220528340 2012-10-16 2012-10-16 Sewage collecting system Expired - Lifetime CN202831177U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220528340 CN202831177U (en) 2012-10-16 2012-10-16 Sewage collecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220528340 CN202831177U (en) 2012-10-16 2012-10-16 Sewage collecting system

Publications (1)

Publication Number Publication Date
CN202831177U true CN202831177U (en) 2013-03-27

Family

ID=47942921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220528340 Expired - Lifetime CN202831177U (en) 2012-10-16 2012-10-16 Sewage collecting system

Country Status (1)

Country Link
CN (1) CN202831177U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104341011A (en) * 2013-07-29 2015-02-11 胡敏刚 Collecting and monitoring system for chemical industrial park enterprise wastewater
CN107740438A (en) * 2017-09-12 2018-02-27 杭州市富阳区和博管道研究所 City integrated piping lane drain pipe system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104341011A (en) * 2013-07-29 2015-02-11 胡敏刚 Collecting and monitoring system for chemical industrial park enterprise wastewater
CN107740438A (en) * 2017-09-12 2018-02-27 杭州市富阳区和博管道研究所 City integrated piping lane drain pipe system
CN107740438B (en) * 2017-09-12 2023-08-11 杭州市富阳区和博管道研究所 Urban comprehensive pipe gallery drainage pipe system

Similar Documents

Publication Publication Date Title
CN103979681B (en) Nitrification/denitrification integrated rural domestic sewage treatment system
CN104909512A (en) Immigrant resettlement town living sewage processing system and method
CN103159380A (en) Zero-energy-consumption sewage treatment system and method for constructed wetlands
CN203229419U (en) Sunlight and aquatic organism coupled water purifying pool
CN204281497U (en) A kind of rural sewage courtyard type Water warfare integrated apparatus
CN202831177U (en) Sewage collecting system
CN204111420U (en) Multipoint water feeding improvement sequencing batch activated sludge system
CN203781915U (en) Nitrification and denitrification integrated rural domestic sewage treatment system
CN101700933A (en) Advanced water treatment method by utilizing artificial floating island wetland
CN105601043A (en) Ecological micro-power treatment system for domestic sewage of villages and towns
CN103992004A (en) Rural sewage advanced treatment and biochemical filtration integration device and running method thereof
CN106565059A (en) Decentralized wastewater treatment system and treatment method and control method thereof
WO2020000214A1 (en) Wastewater recycling treatment apparatus
CN212452982U (en) Dirty rainwater circulation system of building site
CN205295078U (en) Integral sewage treating device
CN204958649U (en) No pump formula degree of depth sewage treatment integration equipment
CN203999129U (en) A kind of Vehicular solar energy blodisc
CN202744385U (en) Integration membrane bioreactor
CN103011415B (en) Simple water treatment and recovery device for large-size wetland
CN203382528U (en) System for collecting and monitoring wastewater in enterprises in chemical park
CN202705184U (en) Coal mine area wastewater treating and reusing system
CN101585646A (en) Artificial wetland treatment system for high-concentration sewage
Huang et al. Analysis of rural domestic sewage treatment in Guizhou
CN103771667A (en) Micro-power three-dimensional ecologic sewage treatment system and method
CN204958595U (en) Regard normal water as combination processing system of subway air conditioner recirculated cooling water moisturizing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130327