CN202830105U - Steel ball quenching temperature control device - Google Patents

Steel ball quenching temperature control device Download PDF

Info

Publication number
CN202830105U
CN202830105U CN 201220377064 CN201220377064U CN202830105U CN 202830105 U CN202830105 U CN 202830105U CN 201220377064 CN201220377064 CN 201220377064 CN 201220377064 U CN201220377064 U CN 201220377064U CN 202830105 U CN202830105 U CN 202830105U
Authority
CN
China
Prior art keywords
steel ball
temperature
control device
controlled switch
electrically operated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220377064
Other languages
Chinese (zh)
Inventor
冯红喜
阴文行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Goldpro New Materials Co ltd
Original Assignee
HEBEI GOLDPRO NEW MATERIALS TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI GOLDPRO NEW MATERIALS TECHNOLOGY Co Ltd filed Critical HEBEI GOLDPRO NEW MATERIALS TECHNOLOGY Co Ltd
Priority to CN 201220377064 priority Critical patent/CN202830105U/en
Application granted granted Critical
Publication of CN202830105U publication Critical patent/CN202830105U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The utility model discloses a steel ball quenching temperature control device. An electric door (5) is arranged on a steel ball raceway to be quenched (1), an infrared temperature probe (4) is arranged on the top of the steel ball raceway to be quenched (1), the infrared temperature probe (4) directs to the steel ball (2) which is closest to the electric door (5), the infrared temperature probe (4) is in signaling connection with an intelligent temperature controlled switch (3), and the intelligent temperature controlled switch (3) is in signaling connection with the electric door (5). When the infrared temperature probe (4) detects that the temperature of the steel ball (2) reaches to a quenching temperature, the intelligent temperature controlled switch (3) instructs the electric door (5) to release the steel ball (2), and then the electric door (5) is capable of being closed and entering the next circulation. When the steel ball quenching temperature control device is utilized in a steel ball production line, the quenching temperature of the steel ball is constant, quality of the steel ball is stable and rejection rate is low.

Description

The iron shot hardening temperature control device
Technical field
The utility model relates to a kind of steel ball production line, is the iron shot hardening temperature control device on the steel ball production line.
Background technology
Present steel ball production line, enter quenching bath from rolling out steel ball to steel ball, general quenching temperature with time indirectly control steel ball, because the ventilation condition in workshop and the difference in season cause actual quenching temperature and setting quenching temperature that certain difference is arranged, quenching temperature is high sometimes, sometimes quenching temperature is low, occur the hardening crack phenomenon when quenching temperature is high, when quenching temperature was hanged down, ball hardness did not reach requirement.Therefore, designing and a kind ofly can make the constant iron shot hardening temperature control device of iron shot hardening temperature, is the present technical issues that need to address.
Summary of the invention
The utility model relates to a kind of iron shot hardening temperature control device.
The technical scheme in the invention for solving the technical problem is:
The iron shot hardening temperature control device, treating that the hardened steel ball raceway is provided with Electrically operated gate, treat the hardened steel ball raceway above be provided with infrared temperature probe, infrared temperature probe points near a steel ball of Electrically operated gate, and the infrared temperature probe is connected with the Intelligent temp-controlled switch signal, and Intelligent temp-controlled switch is connected with the Electrically operated gate signal, when the temperature that records steel ball when infrared temp probe reaches quenching temperature, Intelligent temp-controlled switch instruction Electrically operated gate clearance steel ball, Electrically operated gate can be closed subsequently, enters next circulation.
Compared with prior art, after the steel ball production line used iron shot hardening temperature control device of the present utility model, iron shot hardening temperature was constant, and steel ball quality is stable, and scrap rate is low.
Description of drawings
Fig. 1 is structural representation of the present utility model;
6 is steel ball buffering raceway in the quenching bath among the figure, and 7 is quenching bath.
Embodiment
As shown in the figure, the iron shot hardening temperature control device, treating that hardened steel ball raceway 1 is provided with Electrically operated gate 5, treat hardened steel ball raceway 1 above be provided with infrared temperature probe 4, infrared temperature probe 4 points to a steel ball 2 near Electrically operated gate 5, infrared temperature probe 4 is connected with Intelligent temp-controlled switch 3 signals, Intelligent temp-controlled switch 3 is connected with Electrically operated gate 5 signals, when the temperature that records steel ball 2 when infrared temp probe 4 reaches quenching temperature, Intelligent temp-controlled switch 3 instruction Electrically operated gate 5 clearance steel balls 2, Electrically operated gate 5 can be closed subsequently, enters next circulation.

Claims (1)

1. iron shot hardening temperature control device, it is characterized in that, treating that hardened steel ball raceway (1) is provided with Electrically operated gate (5), be provided with infrared temperature probe (4) in the top for the treatment of hardened steel ball raceway (1), infrared temperature probe (4) points to the steel ball (2) near Electrically operated gate (5), infrared temperature probe (4) is connected with Intelligent temp-controlled switch (3) signal, Intelligent temp-controlled switch (3) is connected with Electrically operated gate (5) signal, when the temperature that records steel ball (2) when infrared temp probe (4) reaches quenching temperature, Intelligent temp-controlled switch (3) instruction Electrically operated gate (5) clearance steel ball (2), Electrically operated gate (5) can be closed subsequently, enters next circulation.
CN 201220377064 2012-08-01 2012-08-01 Steel ball quenching temperature control device Expired - Lifetime CN202830105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220377064 CN202830105U (en) 2012-08-01 2012-08-01 Steel ball quenching temperature control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220377064 CN202830105U (en) 2012-08-01 2012-08-01 Steel ball quenching temperature control device

Publications (1)

Publication Number Publication Date
CN202830105U true CN202830105U (en) 2013-03-27

Family

ID=47941859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220377064 Expired - Lifetime CN202830105U (en) 2012-08-01 2012-08-01 Steel ball quenching temperature control device

Country Status (1)

Country Link
CN (1) CN202830105U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290198A (en) * 2013-06-04 2013-09-11 无锡明珠钢球有限公司 Steel ball quenching device with temperature adjustment function
CN104152646A (en) * 2014-08-06 2014-11-19 河北钢诺新材料科技有限公司 Disc type steel ball temperature control isothermal quenching device
CN109530662A (en) * 2018-06-23 2019-03-29 新疆闽龙耐磨材料有限公司 A kind of wear-resistant ball cooling discharging device
CN109550901A (en) * 2018-12-22 2019-04-02 李德祥 A kind of steel ball production line

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290198A (en) * 2013-06-04 2013-09-11 无锡明珠钢球有限公司 Steel ball quenching device with temperature adjustment function
CN104152646A (en) * 2014-08-06 2014-11-19 河北钢诺新材料科技有限公司 Disc type steel ball temperature control isothermal quenching device
CN104152646B (en) * 2014-08-06 2016-01-06 河北钢诺新材料科技有限公司 Disc type steel ball temperature control isothermal quenching device
CN109530662A (en) * 2018-06-23 2019-03-29 新疆闽龙耐磨材料有限公司 A kind of wear-resistant ball cooling discharging device
CN109530662B (en) * 2018-06-23 2020-10-13 新疆闽龙耐磨材料有限公司 Wear-resisting ball cooling discharging device
CN109550901A (en) * 2018-12-22 2019-04-02 李德祥 A kind of steel ball production line

Similar Documents

Publication Publication Date Title
CN202830105U (en) Steel ball quenching temperature control device
WO2016014424A3 (en) System and method for producing a hardened and tempered structural member
CN103710506A (en) Forging and annealing process for die steel
CN101906518B (en) Post-forging heat treatment process for nickeliferous dilute alloy round steel
CN103805764B (en) A kind of hot rolling technology method of refinement height manganese austenite crystalline grain of steel
CN104313288A (en) Heat treatment process for 42CrMo wind power spindle
CN104313258B (en) A kind of spanner quenching method
WO2015188796A4 (en) Method of heat treatment of bearing steel
CN105695701A (en) 40Cr quenching and tempering technology
CN105603165A (en) 42CrMo steel heat treatment process
CN103667614A (en) Heat treatment method for raising steel toughness
CN103882196A (en) Heat treatment technique for normalizing and tempering ZG35Mn steel
CN103882195A (en) Heat treatment technique for normalizing and tempering ZG275-485H steel
CN103820608A (en) 35CrMnSi steel and heat treatment method for eliminating second-class temper brittleness and improving toughness of 35CrMnSi steel
CN104087739B (en) A kind of underbody car briquetting and thermal treatment process thereof
CN104087740B (en) A kind of base of automobile engine cover plate and Technology for Heating Processing thereof
CN104342544A (en) Heat treatment technique of valve body forge piece for LF2 at low temperature
CN203256305U (en) Steel forging heat treatment trolley furnace
CN202989209U (en) Bar-stock rotating induction quenching device
CN203846072U (en) Quenching equipment adopted during superdeep hardening layer cold roll heat treatment
CN106755789A (en) The Technology for Heating Processing of rich chromium cast iron
CN203530377U (en) Steel ball thermal treatment discharge control device
CN104099452B (en) A kind of automobile chassis connection cover and thermal treatment process thereof
CN105671256A (en) GCr15 suppletion spheroidizing quenching process
CN103306611B (en) Special-shaped drill rod used for coal mining and processing technology of drill rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Hebei Industrial Park, Guangping county south of the 057650 city of Handan Province

Patentee after: GOLDPRO NEW MATERIALS CO.,LTD.

Address before: Hebei Industrial Zone, Guangping county south of the 057650 city of Handan Province

Patentee before: HEBEI GOLDPRO NEW MATERIALS TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Steel ball quenching temperature control device

Effective date of registration: 20161108

Granted publication date: 20130327

Pledgee: The Bank of Handan branch of Limited by Share Ltd. Guangping

Pledgor: GOLDPRO NEW MATERIALS CO.,LTD.

Registration number: 2016990000960

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20181119

Granted publication date: 20130327

Pledgee: The Bank of Handan branch of Limited by Share Ltd. Guangping

Pledgor: GOLDPRO NEW MATERIALS CO.,LTD.

Registration number: 2016990000960

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Steel ball quenching temperature control device

Effective date of registration: 20181123

Granted publication date: 20130327

Pledgee: The Bank of Handan branch of Limited by Share Ltd. Guangping

Pledgor: GOLDPRO NEW MATERIALS CO.,LTD.

Registration number: 2018990001105

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210316

Granted publication date: 20130327

Pledgee: The Bank of Handan branch of Limited by Share Ltd. Guangping

Pledgor: GOLDPRO NEW MATERIALS Co.,Ltd.

Registration number: 2018990001105

PC01 Cancellation of the registration of the contract for pledge of patent right
CX01 Expiry of patent term

Granted publication date: 20130327

CX01 Expiry of patent term