CN202825816U - Oil pipeline cutting belt - Google Patents

Oil pipeline cutting belt Download PDF

Info

Publication number
CN202825816U
CN202825816U CN 201220435270 CN201220435270U CN202825816U CN 202825816 U CN202825816 U CN 202825816U CN 201220435270 CN201220435270 CN 201220435270 CN 201220435270 U CN201220435270 U CN 201220435270U CN 202825816 U CN202825816 U CN 202825816U
Authority
CN
China
Prior art keywords
cutting ferrule
cutting
leading screw
pen clip
lugs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220435270
Other languages
Chinese (zh)
Inventor
张帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Lianzhong Petrochemical Science & Technology Co Ltd
Original Assignee
Dalian Lianzhong Petrochemical Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Lianzhong Petrochemical Science & Technology Co Ltd filed Critical Dalian Lianzhong Petrochemical Science & Technology Co Ltd
Priority to CN 201220435270 priority Critical patent/CN202825816U/en
Application granted granted Critical
Publication of CN202825816U publication Critical patent/CN202825816U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Disclosed is an oil pipeline cutting belt. Two clamping sleeves are arranged relatively and connected through an upper group of lugs and a lower group of lugs of an opening. Two lugs 1 of the upper group are arranged relatively and connected through a lead screw 1. A regulating nut 1 is arranged outside the lead screw 1. Two lugs 2 of the lower group are arranged relatively and connected through a lead screw 2. A regulating nut 2 is arranged outside the lead screw 2. An inner roller parallel with a clamping sleeve shaft line is arranged on the inner side of each clamping sleeve. A cylinder-shaped pen clip is arranged on the side surface of one of the clamping sleeves. The cylinder-shaped pen clip is used for placing a line drawing pen. An arc-shaped handle is arranged outside one of the clamping sleeves. Compared with the prior art, the oil pipeline cutting belt has the advantages of being stable in connection, good in line drawing effects and reducing labor intensity of operating staff. Cut pipe sections are connected with new pipe sections conveniently. Sealing performance after the connection is guaranteed. Service life of the oil pipeline cutting belt is long and the like.

Description

A kind of cutting belt of petroleum pipeline
Technical fieldThe utility model relates to a kind of cutting belt of petroleum pipeline.
Background technologyWhen under environment comparison rugged environment, laying petroleum pipeline, seepage often appears in pipeline, equivalent damage breaks, if damage is little, can directly carry out repair welding at pipeline, if but damage is larger, in the time of can't repair welding, just needing to have damaged part to cut down, the pipeline section that more renews in the process of changing, at first will guarantee to cut the concordant of the mouth of pipe, the method that adopts at present is the outer wall that surrounds petroleum pipeline with astragal, use slate pencil along the astragal setting-out again, then cut along the line that draws, this method generally needs two people to operate simultaneously just in the process of practical operation can finish setting-out work, waste of manpower, in addition, the line that this method draws often can't guarantee concordant, has affected the effect of the joint and seal of last and new pipeline section.Although occurred the instrument than and better effects if more convenient with astragal at present, for example, China Patent No. 201120300309.4 disclosed a kind of cutting belt of petroleum pipelines, it is that a end at stainless steel band is provided with clip, be provided with bolt on the clip, on the other end stainless steel band away from clip, equidistantly be provided with a plurality of fixing holes; Although the cutting belt of this structure is more laborsaving than astragal, better effects if, Shortcomings still in the process of practical operation:
1, because its main body adopts stainless steel band, after stainless steel band service time was long, the phenomenon of perk or fold can appear in the edge, so just impact draw roundly at pipeline, can't guarantee that setting-out is concordant;
2, stainless steel band service time long after because long-term dish circle, crooked and wearing and tearing make the shape of stainless steel band and smoothness deviation can occur, be difficult to be close to pipeline and draw circle, be difficult to guarantee the concordant of setting-out equally;
3, mode is identical with astragal, needs one or two people's operation, and uses slate pencil to carry out setting-out around pipeline, and efficient is low, weak effect, and labor intensity of operating staff is large.
The utility model contentThe purpose of this utility model is to provide a kind of not only stable connection, setting-out is effective, alleviate operating personnel's labour intensity, conveniently be cut being connected between pipeline section and the new pipeline section, sealing after can also guaranteeing to connect, and long service life, technique, simple in structure, cutting belt of petroleum pipeline with low cost, as to be easy to promote the use of.
The utility model includes cutting ferrule, journal stirrup, leading screw, adjusting nut, interior roller and pen clip, wherein be covered with two, these two cutting ferrules are semicircle body and both diameters are identical, two cutting ferrules are oppositely arranged and the upper and lower two groups of journal stirrups by opening part link to each other, two journal stirrups one that top is one group are oppositely arranged and link together by leading screw one, the top of one, two cutting ferrule of leading screw one peripheral hardware adjusting nut is connected to the bottom of two journal stirrups one in top; Two journal stirrups two that the bottom is one group relatively arrange and link together by leading screw two, and two, two cutting ferrules of leading screw two peripheral hardware adjusting nuts are connected to the top of two journal stirrups two in bottom; Be provided with several interior rollers parallel with the cutting ferrule axis in the inboard of each cutting ferrule, interior roller is arranged on the cutting ferrule madial wall uniformly; Establish for the cylindrical shape pen clip of placing detail pen the side of a cutting ferrule therein, and the axis of this pen clip is established limit valve perpendicular to the axis of cutting ferrule on the pen clip; The outside of a cutting ferrule is provided with the handle of arc therein, and handle links to each other with cutting ferrule by bolt.
The utility model is when setting-out, utilize two cutting ferrules that pipeline is entangled, by two leading screws up and down two cutting ferrules are connected, can regulate spacing between two cutting ferrules, directly setting-out by leading screw according to pipe diameter, also paintbrush can be inserted in the pen clip, rotate cutting ferrule by handle, finish setting-out when cutting ferrule rotates, the interior roller of cutting ferrule inboard not only plays the effect of support, and help to be fastened in rotation on the pipeline, make setting-out more convenient.
Two cutting ferrules of the present utility model can be realized the effect of fastening pipeline, adopt the mode of two cutting ferrule docking, and are not only more convenient, time saving and energy saving when operation, and can make setting-out more steadily, neatly; In addition, cutting ferrule adopts leading screw to connect, and is more firm in the time of can making like this two to entangle pipeline, can not be offset when setting-out; Use rear the appearance to wear and tear even the parts such as cutting ferrule, leading screw are long-time, also can not affect whole result of use; The utility model adopts the mode of rotating setting-out, and not only circuit is neat, and smoothly, fast.
The utility model compared with prior art has following advantage:
1, stable connection, setting-out is effective, alleviates operating personnel's labour intensity;
2, conveniently be cut being connected between pipeline section and the new pipeline section, can guarantee the sealing of pipeline after connecting;
3, long service life, technique, simple in structure, with low cost, be easy to promote the use of.
Description of drawingsFig. 1 is that master of the present utility model looks schematic diagram.
Fig. 2 is that schematic diagram is looked on a left side of the present utility model.
The specific embodimentIn the schematic diagram of cutting belt of petroleum pipeline illustrated in figures 1 and 2, cutting ferrule 1 has two, these two cutting ferrules are semicircle body and both diameters are identical, two cutting ferrules are oppositely arranged and the upper and lower two groups of journal stirrups by opening part link to each other, two journal stirrup 2-1 that top is one group are oppositely arranged and link together by leading screw 3-1, leading screw 3-1 peripheral hardware adjusting nut 4-1, the top of two cutting ferrules is connected to the bottom of two the journal stirrup 2-1 in top; Two journal stirrup 2-2 that the bottom is one group are oppositely arranged and link together by leading screw 3-2, leading screw 3-2 peripheral hardware adjusting nut 4-2, and two cutting ferrules are connected to the top of two the journal stirrup 2-2 in bottom; Be provided with several interior rollers 5 parallel with the cutting ferrule axis in the inboard of each cutting ferrule, interior roller is arranged on the cutting ferrule madial wall uniformly; Establish for the cylindrical shape pen clip 6 of placing detail pen the side of a cutting ferrule therein, and the axis of this pen clip is established limit valve 7 perpendicular to the axis of cutting ferrule on the pen clip; The outside of a cutting ferrule is provided with the handle 8 of arc therein, and handle links to each other with cutting ferrule by bolt 9.

Claims (1)

1. cutting belt of petroleum pipeline, comprise cutting ferrule, journal stirrup, leading screw, adjusting nut, interior roller and pen clip, it is characterized in that: be covered with two, these two cutting ferrules are semicircle body and both diameters are identical, two cutting ferrules are oppositely arranged and the upper and lower two groups of journal stirrups by opening part link to each other, two journal stirrups one that top is one group are oppositely arranged and link together by leading screw one, the top of one, two cutting ferrule of leading screw one peripheral hardware adjusting nut is connected to the bottom of two journal stirrups one in top; Two journal stirrups two that the bottom is one group relatively arrange and link together by leading screw two, and two, two cutting ferrules of leading screw two peripheral hardware adjusting nuts are connected to the top of two journal stirrups two in bottom; Be provided with the interior roller parallel with the cutting ferrule axis in the inboard of each cutting ferrule, interior roller is arranged on the cutting ferrule madial wall uniformly; Establish for the cylindrical shape pen clip of placing detail pen the side of a cutting ferrule therein, and the axis of this pen clip is established limit valve perpendicular to the axis of cutting ferrule on the pen clip; The outside of a cutting ferrule is provided with the handle of arc therein, and handle links to each other with cutting ferrule by bolt.
CN 201220435270 2012-08-30 2012-08-30 Oil pipeline cutting belt Withdrawn - After Issue CN202825816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220435270 CN202825816U (en) 2012-08-30 2012-08-30 Oil pipeline cutting belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220435270 CN202825816U (en) 2012-08-30 2012-08-30 Oil pipeline cutting belt

Publications (1)

Publication Number Publication Date
CN202825816U true CN202825816U (en) 2013-03-27

Family

ID=47937607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220435270 Withdrawn - After Issue CN202825816U (en) 2012-08-30 2012-08-30 Oil pipeline cutting belt

Country Status (1)

Country Link
CN (1) CN202825816U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102814808A (en) * 2012-08-30 2012-12-12 大连连重石化科技有限公司 Petroleum pipeline cutting belt
CN103481262A (en) * 2013-08-28 2014-01-01 无锡金玺换热器有限公司 Novel petroleum pipeline external sealing marking band
CN104015180A (en) * 2014-05-27 2014-09-03 成都来宝石油设备有限公司 Tool for drawing line on pipeline
CN106881707A (en) * 2017-04-17 2017-06-23 成都大漠石油技术有限公司 Setting-out mechanism based on cutting arc petroleum pipeline elbow
CN106891318A (en) * 2017-04-17 2017-06-27 成都大漠石油技术有限公司 Petroleum pipeline outer wall setting-out marking arrangement
CN106914878A (en) * 2017-04-17 2017-07-04 成都大漠石油技术有限公司 Line-plotting device for cutting petroleum pipeline
CN114273555A (en) * 2021-12-24 2022-04-05 衡阳泰豪通信车辆有限公司 Oil engine exhaust pipe thermal insulation layer bundling device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102814808A (en) * 2012-08-30 2012-12-12 大连连重石化科技有限公司 Petroleum pipeline cutting belt
CN103481262A (en) * 2013-08-28 2014-01-01 无锡金玺换热器有限公司 Novel petroleum pipeline external sealing marking band
CN103481262B (en) * 2013-08-28 2016-04-13 无锡金玺换热器有限公司 A kind of nonpetroleum pipeline external sealing mark band
CN104015180A (en) * 2014-05-27 2014-09-03 成都来宝石油设备有限公司 Tool for drawing line on pipeline
CN106881707A (en) * 2017-04-17 2017-06-23 成都大漠石油技术有限公司 Setting-out mechanism based on cutting arc petroleum pipeline elbow
CN106891318A (en) * 2017-04-17 2017-06-27 成都大漠石油技术有限公司 Petroleum pipeline outer wall setting-out marking arrangement
CN106914878A (en) * 2017-04-17 2017-07-04 成都大漠石油技术有限公司 Line-plotting device for cutting petroleum pipeline
CN114273555A (en) * 2021-12-24 2022-04-05 衡阳泰豪通信车辆有限公司 Oil engine exhaust pipe thermal insulation layer bundling device

Similar Documents

Publication Publication Date Title
CN102814808B (en) Petroleum pipeline cutting belt
CN202825816U (en) Oil pipeline cutting belt
CN203948414U (en) Telescopic universal connecting piece
CN201985480U (en) Buried thread-locking pipe joint structure
CN203295700U (en) Connecting structure of roller shaft of spinning frame
CN207848677U (en) Double flange pines cover power transmission compensating joint
CN202848872U (en) Membrane wall hook
CN201699299U (en) Adjustable cable twisting hoop
CN203656477U (en) Variable diameter guider
CN204640324U (en) Cable sleeve perpendicular cuts is anti-cuts tilted supporter
CN210510753U (en) Stainless steel corrugated pipe joint protective sleeve for gas
CN204402429U (en) A kind of oil pipe thread cleaning plant
CN2865093Y (en) Universal fixing draw-in gear for communication cable
CN103855636B (en) Isolating switch moving contact dismantling device
CN202845384U (en) Probe rotating device used for cleaning machine with long cylinder barrel inner cavity
CN202024021U (en) Water pipe plug
CN205190970U (en) Adjustable pipe strap
CN201931431U (en) Tooling for disassembling positioning pin
CN204939992U (en) A kind of rope machine track plate positioner
CN205045601U (en) Cable packing apparatus
CN204553541U (en) A kind of mirror roller
CN204984312U (en) Novel well -flushing ground pulley
CN203770447U (en) Coupler pressing cover
CN203426295U (en) Necking down tool
CN202460225U (en) Outlet cone sleeve for thickening machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130327

Effective date of abandoning: 20141217

RGAV Abandon patent right to avoid regrant