CN202810262U - Bunker room of coal-fired power plant - Google Patents

Bunker room of coal-fired power plant Download PDF

Info

Publication number
CN202810262U
CN202810262U CN201220460127.8U CN201220460127U CN202810262U CN 202810262 U CN202810262 U CN 202810262U CN 201220460127 U CN201220460127 U CN 201220460127U CN 202810262 U CN202810262 U CN 202810262U
Authority
CN
China
Prior art keywords
coal
bunker
main frame
pillar
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220460127.8U
Other languages
Chinese (zh)
Inventor
张润盘
赵荣中
杨立辉
阎占良
辛建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Hebei Electric Power Engineering Co Ltd
Original Assignee
Hebei Electric Power Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Electric Power Design and Research Institute filed Critical Hebei Electric Power Design and Research Institute
Priority to CN201220460127.8U priority Critical patent/CN202810262U/en
Application granted granted Critical
Publication of CN202810262U publication Critical patent/CN202810262U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model discloses a bunker room of a coal-fired power plant. The bunker room comprises two columns of main frame columns, coal grinding machines, a coal supply machine and a coal conveying belt, wherein the coal supply machine is positioned above the coal grinding machines and is communicated with the coal grinding machines; the coal supply belt is positioned above the coal supply machine; the space between the two columns of main frame columns is 13.5 m; an overhauling passage is arranged between the two columns of main frame columns; edges of bunker rooms on two sides of the two columns of main frame columns are also respectively provided with a column of small frame columns; and the coal grinding machines are longitudinally and sequentially arranged between two main frame columns of each column of main frame columns. According to the bunker room, the floor space of the bunker room is reduced, meanwhile, the investment in a coal loading system is not increased because over lifting of elevation of the coal conveying belt layer of the bunker room is ensured to be avoided , one overhauling passage can be shared by the coal grinding machines on the two sides, and the overhauling is more convenient.

Description

Coal-burning power plant's bunker bay
Technical field
The utility model belongs to coal-burning power plant's factory building and arranges field, specifically a kind of design form of bunker bay of coal-burning power plant.
Background technology
Along with the fast development of China's economy, the domestic thermal power plant construction has obtained great-leap-forward development.The preferred arrangement in Power Plant Main House zone is saved occupation of land and is reduced investment for the coal-burning power plant, and very important meaning is arranged.Bunker bay is the important component part of main building, and its layout can have influence on the total arrangement of main building, and then has influence on the engineering construction cost.Therefore to fully optimize the main building arrangement in project engineering stage, rationally reduce the engineering construction cost, just must be optimized design to the bunker bay module.
At present, bunker bay is furnished with three kinds of schemes: bunker bay, furnace side bunker bay behind stokehold bunker bay, the stove.Present stage, domestic coal-burning power plant's bunker bay is arranged and is arranged as the master with the stokehold bunker bay; The furnace side coal bunker also begins to use in recent years; Coal bunker is then less behind the stove, only is in the conceptual phase.At present, it is large that stokehold bunker bay arrangement is subjected to the impact of coal pulverizer pattern, appearance and size and maintenance mode to exist the main building floor space, and the pipeline consumption is large, and the factory building zone is vacant between two stoves simultaneously, causes waste, is not most economical scheme therefore.
The side bunker bay is arranged and is referred to that bunker bay is arranged in a side of boiler, the side coal bunker of present stage, equipment (coal pulverizer, feeder, run coal bin) equally all is arranged in the frame construction of bunker bay, but main building dwindles to the distance of boiler and makes pipeline docking port thrust that adverse influence be arranged, and after the main building compact Layout, arrange with routine and to compare to civil engineering and install and brought certain difficulty.Because coal pulverizer, feeder, run coal bin all are arranged in the frame construction, also to satisfy simultaneously satisfying of pipe arrangement, overhaul of the equipments and service condition, therefore cause the bunker bay span to optimize, cause civil engineering costs to increase.
Be subject to the needs of coal pulverizer and maintenance thereof, if the pillar of main frame of bunker bay adopts three row double-spans, 300MW grade coal warehouse receipt span is basically about 18m, coal pulverizer, feeder are arranged in the frame construction, coal pulverizer is arranged in the bottom, the coal pulverizer top is furnished with feeder, feeder passes through its Belt Conveying coal in coal pulverizer, the feeder top is furnished with fortune coal belt, fortune coal belt flows to feeder to coal, not only cause civil engineering costs to increase, and the maintenance inclement condition, the problems such as pipe arrangement difficulty; For satisfying apparatus arrangement, maintenance, need further to increase coal bunker and take up an area, significantly increase civil engineering costs, cause construction investment to increase.
The utility model content
The utility model technical issues that need to address provide and a kind ofly reduce civil engineering costs, save rolled steel dosage, improve simultaneously the bunker bay of operating maintenance environment.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is:
A kind of coal-burning power plant bunker bay, comprise pillar of main frame, coal pulverizer, be positioned at coal pulverizer top and the feeder that is communicated with coal pulverizer, be positioned at the fortune coal belt above the feeder, the pillar of main frame of described bunker bay is two row, spacing between the two row pillar of main frames is 13.5 meters, be access path between the two row pillar of main frames, the edge of the both sides bunker bay of two row pillar of main frames also respectively is provided with a row small frame post; Described coal pulverizer vertically is arranged in order between two pillar of main frames that are arranged on every row pillar of main frame.
Further improvement of the utility model is: laterally be provided with single track between corresponding two coal pulverizers that arrange between described two pillar of main frames.
Because the technological progress of having adopted technique scheme, the utility model to obtain is:
The utility model comprises optimizing reducing coal bunker studding distance and layout by the bunker bay innovative design, guarantees simultaneously that bunker bay coal conveyer belt layer absolute altitude excessively do not raise to cause the coaling system increase of investment.
The utility model is by again planning, the coal pulverizer bunker bay is arranged between pillar of main frame, because equipment all is not arranged between the two row pillar of main frames, making bunker bay is the problem that post distance or span have all been broken away from the equipment that is subject in the past (coal pulverizer, feeder etc.), so that the bunker bay volume no longer is subject to the coal pulverizer type selecting, when reducing the bunker bay volume, make the coal pulverizer of two stoves can share an access path, optimized greatly again the maintenance environment, make access path more unobstructed, the Roller of Coal Grinder lifting is more convenient.Bunker bay is also arranged both sides small frame post, satisfies antidetonation and rainproof requirement.
The utility model is to take up an area, save rolled steel dosage, reduction construction investment in order to reduce factory building, and the response national energy-saving reduces discharging calls.By using the utility model, for 300MW grade unit, the bunker bay volume is significantly reduced, reduce approximately about 25% than traditional side coal bunker, reduce to take up an area 1600m 2About, reduce about special steel material use amount 50t (four large pipeline consumptions), reduce cable consumption and cable testing bridge and invest about 5,000,000 yuans, comparable kilowatt of index of main building reduces about 5%.No matter 100MW, 300MW, 600MW, 1000MW grade unit can be used the present invention, can the operation of improvement equipment, the maintenance condition, and can reach again and save civil engineering costs, reduce to take up an area, reduces the effect of investing.
Description of drawings
Fig. 1 is the whole longitudinal profile schematic diagram of bunker bay;
Fig. 2 is the layout schematic diagram of coal pulverizer;
Fig. 3 is the layout schematic diagram of feeder;
Fig. 4 is the floor map of fortune coal belt.
Wherein, 1, pillar of main frame, 2, fortune coal belt, 3, feeder, 4, coal pulverizer, 5, small frame post.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further details:
A kind of coal-burning power plant bunker bay, comprise pillar of main frame 1, coal pulverizer 4, be positioned at coal pulverizer 4 tops and the feeder 3 that is communicated with coal pulverizer 4, be positioned at the fortune coal belt 2 of feeder 3 tops, the pillar of main frame 1 of bunker bay is two row, the spacing of two row pillar of main frames 1 is 13.5 meters, be access path between the two row pillar of main frames 1, coal pulverizer 4 longitudinal arrangements are arranged between two pillar of main frames 1 of every row pillar of main frame, laterally be provided with the single track of maintenance usefulness between the corresponding coal pulverizer 4, the edge of the both sides bunker bay of two row pillar of main frames 1 also respectively is provided with row's small frame post 5.
Consider installation and the space for maintenance requirement of coal pulverizer, the appearance and size of coal bunker, the factors such as economic span of the installation of feeder and space for maintenance, civil engineering framework, adopt scheme of the present utility model, make the coal pulverizer on both sides can share an access path, making bunker bay is that post distance or span have all been broken away from the problem that is subject in the past coal pulverizer, feeder etc., so that the bunker bay volume no longer is subject to the coal pulverizer type selecting, when reducing the bunker bay volume, optimized greatly again the maintenance environment, make access path more unobstructed, the lifting of coal pulverizer mill rod is more convenient.

Claims (2)

1. coal-burning power plant's bunker bay, comprise pillar of main frame (1), coal pulverizer (4), be positioned at coal pulverizer (4) top and the feeder (3) that is communicated with coal pulverizer (4), be positioned at the fortune coal belt (2) above the feeder (3), it is characterized in that: the pillar of main frame of described bunker bay (1) is two row, spacing between the two row pillar of main frames (1) is 13.5 meters, be access path between the two row pillar of main frames (1), the edge of the both sides bunker bay of two row pillar of main frames (1) also respectively is provided with a row small frame post (5); Described coal pulverizer (4) vertically is arranged in order between two pillar of main frames (1) that are arranged on every row pillar of main frame.
2. coal-burning power plant according to claim 1 bunker bay is characterized in that: laterally be provided with single track between corresponding two coal pulverizers (4) that arrange between described two pillar of main frames (1).
CN201220460127.8U 2012-09-11 2012-09-11 Bunker room of coal-fired power plant Expired - Lifetime CN202810262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220460127.8U CN202810262U (en) 2012-09-11 2012-09-11 Bunker room of coal-fired power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220460127.8U CN202810262U (en) 2012-09-11 2012-09-11 Bunker room of coal-fired power plant

Publications (1)

Publication Number Publication Date
CN202810262U true CN202810262U (en) 2013-03-20

Family

ID=47869167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220460127.8U Expired - Lifetime CN202810262U (en) 2012-09-11 2012-09-11 Bunker room of coal-fired power plant

Country Status (1)

Country Link
CN (1) CN202810262U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604357A (en) * 2016-03-07 2016-05-25 中国能源建设集团广东省电力设计研究院有限公司 Main power house layout structure of single-shaft gas-steam combined cycle units

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604357A (en) * 2016-03-07 2016-05-25 中国能源建设集团广东省电力设计研究院有限公司 Main power house layout structure of single-shaft gas-steam combined cycle units

Similar Documents

Publication Publication Date Title
CN101481958A (en) Main power zone island type arrangement of thermal power generation plant
Liu et al. A comparison of the energy consumption and carbon emissions for different modes of transportation in open-cut coal mines
CN203487818U (en) Main power house of thermal power plant
CN202810262U (en) Bunker room of coal-fired power plant
CN202826073U (en) Concrete mixing plant meeting requirements for environmental protection, energy conservation and high efficiency
CN204661742U (en) The bf coal injection system of a kind of pulverized coal injection structural unit and composition thereof
CN204624488U (en) A kind of efficient distributing structure for particulate matter or granular material
CN207346553U (en) A kind of box pipeline reciprocating elevator
CN216174256U (en) Mobile skid-mounted intelligent dry coal dressing system
CN102408933A (en) Energy-saving, environmental-friendly and safe installing method for low-heat-value coal upgrading equipment
CN202164623U (en) Universal foundation structure of 220 kV transformer substation main transformer
CN206139312U (en) Limestone flour prepares arrangement structure of system
CN106345593A (en) Arrangement structure of preparation system for limestone powder and process flow
CN102633074B (en) Integrated-type comprehensive coal bunker
CN201313348Y (en) Flat-inclined belt conveyer integrative structure of concrete batching plant
Wang et al. Conceptual design of an integrated heating system at LKAB Malmberget with consideration of social-environmental damage costs
CN103769293B (en) A kind of CHARACTERISTICS OF TAILINGS SAND producing building method for determining sand
CN203924788U (en) The W type flame boiler factory building with furnace side bunker bay
CN207177379U (en) A kind of main building of steam turbine lateral arrangement
CN201560194U (en) Compact coal injection system of blast furnace
CN206206920U (en) A kind of new mining hydraulic equipment simulating support based on adjustable structure
CN202849468U (en) Differential-pressure-free dust discharging device for gravitational dust collector of blast furnace
Bhattacharya et al. Coal resources, production and use in India
Jun et al. Analysis on impacts and co-abatement effects of implementing the low carbon cement standard
CN204456991U (en) The structure of a kind of head transfer station and bunker bay combined layout

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 050031 No. 6 Jianhua Street, Shijiazhuang City, Hebei Province

Patentee after: POWERCHINA HEBEI ELECTRIC POWER ENGINEERING Co.,Ltd.

Address before: 050031 No. 6 Jianhua Street, Shijiazhuang City, Hebei Province

Patentee before: HEBEI ELECTRIC POWER DESIGN & Research Institute

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20130320

CX01 Expiry of patent term