CN202808643U - Mould for assembling foundation detonator and initiating explosive devices of foundation detonator - Google Patents

Mould for assembling foundation detonator and initiating explosive devices of foundation detonator Download PDF

Info

Publication number
CN202808643U
CN202808643U CN201220449202.0U CN201220449202U CN202808643U CN 202808643 U CN202808643 U CN 202808643U CN 201220449202 U CN201220449202 U CN 201220449202U CN 202808643 U CN202808643 U CN 202808643U
Authority
CN
China
Prior art keywords
mould
filling
detonator
automatic
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220449202.0U
Other languages
Chinese (zh)
Inventor
陈克文
方丽群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Wuchan Guanghua Civil Explosive Equipment Co ltd
Original Assignee
Zhejiang Produce Industrial Explosive Material Franchise Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Produce Industrial Explosive Material Franchise Co Ltd filed Critical Zhejiang Produce Industrial Explosive Material Franchise Co Ltd
Priority to CN201220449202.0U priority Critical patent/CN202808643U/en
Application granted granted Critical
Publication of CN202808643U publication Critical patent/CN202808643U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model belongs to the field of industrial explosive materials, and discloses a mould for assembling a foundation detonator and initiating explosive devices of the foundation detonator. The mould comprises a mould body, wherein mould holes are uniformly distributed in the mould body at intervals, and the distance between the centers of two adjacent mould holes is 12-25mm. With the adoption of the technical scheme, the mould processing technology is simplified, the cost is reduced, technical support is provided for the realization of automatic mould filling of delay elements, automatic mould filling of reinforced caps and automatic mould filling of shells, as well as for the reliable connection between the realization of the mould filling for the delay elements, the reinforced caps and the shells and the filling of the foundation detonator, the purpose that no fixed operation personnel is needed in the automatic filling production line of the detonators is realized, the unmanned detonator production line is really realized, the intrinsic safety is improved, and extremely high practicability and safety are achieved.

Description

Basal detonator and priming system thereof are with assembling mould
Technical field
The utility model belongs to the industrial explosive material field, has related in particular to a kind of basal detonator and priming system thereof with assembling mould.
Background technology
No matter China's civil explosive materials industrial basic detonator filling production line is automation line or manual line at present, its drug pressing machine, pressing punching are arranged and all adopted 50 oil head longitudinal arrangement modes is that 9 rows arrange, by 6 of every rows 5 rows and 5 of every rows being set arranges 4 rows and forms laterally staggered parallelogram or prismatic arrangement (spread pattern is seen accompanying drawing 1); Also require consistent with it with the arrangement mode of the mould of coordinative composition of equipments.But the parallelogram of mould or prismatic arrangement mode be to whole production line, and the particularly automatization assembling high to positioning accuracy request realizes that its serialization, automatic technology difficulty are very large.Therefore, be necessary the structure of existing assembling mould is optimized, to satisfy the operational requirement of production line serialization, automatization.
Summary of the invention
The utility model is parallelogram or prismatic arrangement mode for assembling mould of the prior art, exist and realize serialization, the shortcoming that the automatic technology difficulty is large, provide a kind of simple in structure, bearing accuracy is high, assembling serialization, basal detonator and priming system assembling mould thereof that level of automation is high.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals:
Basal detonator and priming system thereof comprise die ontology with the assembling mould, the die hole that evenly has been intervally arranged on the die ontology, and the distance between adjacent two die hole centers is 12-25mm.
As preferably, the quantity of described die hole is 20-300, whole rectangular the arranging of all die holes.
As preferably, the quantity of described die hole is 50, is shaped as circle, and its arrangement mode is for vertically being 10 of 5 row and every row.
As preferably, the distance between described adjacent two die hole centers is 17mm.
The utility model has significant technique effect owing to adopted above technical scheme:
The utility model has reduced cost so that mould processing technology is oversimplified.Provide technical support for the realization of delay element automatic mounting mould, strengthening cap automatic mounting mould, shell automatic mounting mould and with reliable linking of basic detonator filling, realize that the automatic detonator filling line is without the fixed operation personnel, the unmanned detonator production line of real realization, improve essential safety, had very high practicality and security.
Description of drawings
Fig. 1 is the structural representation of existing assembling mould.
Fig. 2 is structural representation of the present utility model.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with accompanying drawing 1 to accompanying drawing 2:
Embodiment 1
Basal detonator and priming system thereof as shown in Figure 2, comprise die ontology 1 with the assembling mould, the die hole 2 that evenly has been intervally arranged on the described die ontology 1, and the distance between adjacent two die hole 2 centers is 17mm.The quantity of die hole 2 is 50, is shaped as circle, and its arrangement mode is for vertically being 10 of 5 row and every row, all die hole 2 whole rectangular arranging.
Can realize ten of rows by the arrangement mode of above-mentioned die hole, the shell that translation just can be finished a whole mould for four times enters or other operations, solved original mould and must be the symmetry in 25 holes or 50 holes of mould preparation simultaneously comb or other to operate to finish the equipment mechanism that mould preparation brings complicated, bulky disadvantage.
In a word, the above only is preferred embodiment of the present utility model, and all equalizations of doing according to the utility model claim change and modify, and all should belong to the covering scope of the utility model patent.

Claims (4)

1. basal detonator and priming system thereof comprise die ontology (1) with the assembling mould, and it is characterized in that: the die hole (2) that evenly has been intervally arranged on the described die ontology (1), the distance between adjacent two die holes (2) center is 12-25mm.
2. basal detonator according to claim 1 and priming system thereof is characterized in that with assembling mould: the quantity of described die hole (2) is 20-300, whole rectangular the arranging of all die holes (2).
3. basal detonator according to claim 2 and priming system thereof are with assembling mould, and it is characterized in that: the quantity of described die hole (2) is 50, is shaped as circle, and its arrangement mode is for vertically being 10 of 5 row and every row.
4. arbitrary described basal detonator and priming system thereof are with assembling mould according to claim 1-3, and it is characterized in that: the distance between described adjacent two die holes (2) center is 17mm.
CN201220449202.0U 2012-09-05 2012-09-05 Mould for assembling foundation detonator and initiating explosive devices of foundation detonator Expired - Lifetime CN202808643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220449202.0U CN202808643U (en) 2012-09-05 2012-09-05 Mould for assembling foundation detonator and initiating explosive devices of foundation detonator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220449202.0U CN202808643U (en) 2012-09-05 2012-09-05 Mould for assembling foundation detonator and initiating explosive devices of foundation detonator

Publications (1)

Publication Number Publication Date
CN202808643U true CN202808643U (en) 2013-03-20

Family

ID=47867560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220449202.0U Expired - Lifetime CN202808643U (en) 2012-09-05 2012-09-05 Mould for assembling foundation detonator and initiating explosive devices of foundation detonator

Country Status (1)

Country Link
CN (1) CN202808643U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110530215A (en) * 2019-10-10 2019-12-03 安徽红星机电科技股份有限公司 A kind of 40 pore pressure force checking devices and method for priming system production

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110530215A (en) * 2019-10-10 2019-12-03 安徽红星机电科技股份有限公司 A kind of 40 pore pressure force checking devices and method for priming system production
CN110530215B (en) * 2019-10-10 2024-05-14 安徽红星机电科技股份有限公司 40-Hole pressure detection device and method for initiating explosive device production

Similar Documents

Publication Publication Date Title
CN103234397A (en) Production method for partitioned unit glued lattice structural bodies of graphic fireworks
CN202808643U (en) Mould for assembling foundation detonator and initiating explosive devices of foundation detonator
DE60310137D1 (en) PRESSING DEVICE FOR CAPS
CN202709896U (en) Press mould for porous firework powder column
CN203864035U (en) Airplane blade forming tooling
CN202974073U (en) Bi-direction opening and closing type rotating combination mold for forming combination firework cylinder
CN203391345U (en) Overhead dual-cylinder tablet press
CN203129355U (en) Elevator shaft earthquake-resistant system suitable for earthquake-resistant project
CN202545601U (en) Steel ball splitting device of deep groove ball bearing
CN201998378U (en) Eight-hole ambush type ejecting insert clamping fixture
CN203600469U (en) Auxiliary loading tooling
CN204030826U (en) Motor
CN203887931U (en) Air hole forming tooling for doors
CN202493592U (en) Cylindrical roller retainer
CN203167794U (en) Birdcage for throstle
CN202493593U (en) Cylindrical roller retainer for bearing
CN106624768A (en) Integrated tooling and process of telephone receiver assembly line
CN203061641U (en) Processing device for one set of door
CN204172164U (en) A kind of two-way pressure type hydraulic press that independently shakes
CN206316220U (en) A kind of automatic punch machine
CN205989170U (en) A kind of assembling device for snap spring
CN203031979U (en) Female die of die
CN203526299U (en) Automatic notching device for lock body machining equipment
CN203092933U (en) Die and oil hydraulic cylinder type reset mechanism thereof
CN102562811A (en) Cylinder roller retainer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180627

Address after: 324400 Quzhou, Longyou, Zhejiang province Donghua Street South City, five claw ridge No. 52

Patentee after: ZHEJIANG WUCHAN GUANGHUA CIVIL EXPLOSIVE EQUIPMENT CO.,LTD.

Address before: 310011 Gongshu District amu Road, Hangzhou, Hangzhou, Zhejiang

Patentee before: ZHEJIANG MATERIALS INDUSTRY CIVIL EXPLOSIVES MONOPOLY Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20130320

CX01 Expiry of patent term